| Label | Text | Page | Extraction method |
|---|---|---|---|
| 1.1 | 1.1 Site utility trench along column line 12 is excavated to 4 feet 0 inches below finished grade for the incoming electrical duct bank. | 1 | spec_text |
| 1.2 | 1.2 Site utility trench along column line 18 is excavated to 3 feet 0 inches below finished grade for the domestic water tie-in. | 1 | spec_text |
| 2.1 | 2.1 Site grading slopes away from the building at a minimum 2 percent for the first 10 feet. | 1 | spec_text |