P-101 — P 101 Plumbing Plan

Test: Chicago Dentist / Rev A / plumbing / pdf_2d

10 clause(s)

LabelTextPageExtraction method
1 1. WH-1 is a 50-gallon gas-fired water heater on an 18" stand, located in Mech/Elec Room 105. It is set 1'-6" (18") clear from the east wall of the room. 1 pdf_text
10 10. Provide floor drain at Mech/Elec Room 105 per code; route T&P relief discharge and any condensate to this drain. 1 pdf_text
2 2. Coordinate WH-1's location with the electrical engineer's Panel EP-2, shown on E-101 on the same wall -- EP-2 requires 36" of dedicated clear working space, and WH-1 as located reduces the usable clear floor space in front of that panel to approximately 18". 1 pdf_text
3 3. The T&P relief valve discharge is piped full-size to within 6" of the floor per the water heater manufacturer's instructions, and directed to the floor drain in Mech/Elec Room 105. 1 pdf_text
4 4. Restroom 104 (accessible) contains one water closet (3" waste / 2" vent) and one wall-hung lavatory (1-1/2" waste), both ADA compliant. 1 pdf_text
5 5. A mop sink (3" waste / 2" vent) is provided in Mech/Elec Room 105. 1 pdf_text
6 6. Each of the four operatories (107, 108, 109, 112) has one clinical hand-wash sink (1-1/2" waste). 1 pdf_text
7 7. Domestic water piping is Type L copper; waste and vent piping is PVC DWV throughout, unless noted otherwise. 1 pdf_text
8 8. Verify WH-1 clearance from the east wall against the electrical panel clearance requirements shown on E-101 before setting the unit; see the WH-1 notes above. 1 pdf_text
9 9. Fixture connection sizes noted above are for planning purposes; confirm final sizing with the plumbing fixture cut sheets during submittal review. 1 pdf_text