| 1.1 | 1.1 Sprinkler branch line SP-6 crosses Data Hall 2 at 14 feet 3 inches above finished floor, below the required duct insulation clearance. | 1 | spec_text |
| 1.2 | 1.2 Sprinkler branch line SP-9 crosses Data Hall 3 at 12 feet 6 inches above finished floor. | 1 | spec_text |
| 2.1 | 2.1 Standpipe riser in the north stair is sized for a minimum residual pressure of 65 psi at the topmost outlet. | 1 | spec_text |