| Label | Text | Page | Extraction method |
|---|---|---|---|
| 1 | 1. Panel EP-1 (Waiting/Office area, 120/208V, 42-ckt): dedicated equipment space per NEC 110.26 required in front of panel; coordinate with adjacent restroom door swing shown on A-101. | 1 | pdf_text |
| 2 | 2. Panel EP-2 (Mech/Elec Room 105, 120/208V, 30-ckt): dedicated clear working space shown = 2'-6" (30"); NEC 110.26(A)(1) requires 3'-0" (36") minimum clear working space for this voltage-to-ground condition. | 1 | pdf_text |
| 3 | 3. Coordinate Panel EP-2 clearance with plumbing water heater WH-1 location -- see P-101; WH-1 as shown reduces usable clear space in front of EP-2 to approx. 1'-6" (18"). | 1 | pdf_text |
| 4 | 4. Emergency/egress lighting (fixtures tagged EM) provided along corridor per life safety plan A-102; verify fixture spacing provides continuous coverage along full egress path shown on A-102, including run from Grid 2 to the exit at Vestibule 101. | 1 | pdf_text |
| 4 | 4 A B C D VEST. WAITING OFFICE RR MEC OPER. 1 OPER. 2 OPER. 3 STERIL. BREAK OPER. 4 STORAGE EP-1 REQ'D CLR ZONE OVERLAPS RESTROOM DOOR SWING (SEE A-101) EP DEDICATE CE SHOWN = E 2) EM EM EM EGRESS LTG. FIXTURES END NEAR GRID 2 -- CONFIRM COVERAGE TO EXIT VS. A-102 EGRESS PATH ELECTRICAL GENERAL NOTES | 1 | pdf_text |
| 4400 | 4400 W. City of Ch Permit No Electri Occupan Drawn: J. REVISION A 06/15/26 N SCALE: 1/8" = 1'-0" (SCHEMATIC, NOT TO SCALE) | 1 | pdf_text |
| 5 | 5. Underground electrical service duct bank -- see C-101 for routing and coordination with site utilities. | 1 | pdf_text |