| 1.1 | 1.1 CRAC unit CU-6 in Data Hall 1 requires 8 feet 6 inches of overhead clearance to accommodate top-discharge airflow. | 1 | spec_text |
| 1.2 | 1.2 CRAC unit CU-9 in Data Hall 4 requires 7 feet 0 inches of overhead clearance to accommodate top-discharge airflow. | 1 | spec_text |
| 2.1 | 2.1 Condenser water piping serving CU-6 is routed at 7 feet 0 inches above finished floor along the Data Hall 1 perimeter wall. | 1 | spec_text |