| Label | Text | Page | Extraction method |
|---|---|---|---|
| 1.1 | 1.1 Ductwork DS-2 within Corridor 104 shall maintain a minimum clearance of 9 feet 6 inches above finished floor to the bottom of duct insulation. | 1 | spec_text |
| 1.2 | 1.2 Ductwork DS-4 within Corridor 109 shall maintain a minimum clearance of 8 feet 6 inches above finished floor to the bottom of duct insulation. | 1 | spec_text |