1.1 1.1 Domestic water main enters the building at the northeast corner, 4 feet 0 inches below finished grade. 1 spec_text
1.2 1.2 Restroom group RR-2 drainage ties into the sanitary main at 3 feet 6 inches below finished floor. 1 spec_text
2.1 2.1 Roof drain leaders route down the core wall, clear of Data Hall 1 and Data Hall 2 ceiling space. 1 spec_text