| Label | Text | Page | Extraction method |
|---|---|---|---|
| 1.1 | 1.1 Ductwork DS-11 within Data Hall 2 shall maintain a minimum clearance of 14 feet 6 inches above finished floor to the bottom of duct insulation. | 1 | spec_text |
| 1.2 | 1.2 Ductwork DS-14 within Data Hall 3 shall maintain a minimum clearance of 13 feet 0 inches above finished floor to the bottom of duct insulation. | 1 | spec_text |
| 2.1 | 2.1 Exhaust louver EL-3 penetrates the Data Hall 4 exterior wall at 7 feet 6 inches above finished floor. | 1 | spec_text |