| Label | Text | Page | Extraction method |
|---|---|---|---|
| 1 | 1. RTU-1 (5-ton packaged rooftop unit) operating weight = 3,200 lb including curb; verify roof structure capacity with structural engineer prior to setting equipment (see S-101, BM-7 design point load). | 1 | pdf_text |
| 2 | 2. RA-1 return duct (24"x14") routed at Grid Line B between Grid | 1 | pdf_text |
| 2-3 | 2-3; bottom of duct EL. +9'-2" AFF. Coordinate with structural steel bottom-of-steel elevations at BM-4 (see S-101). | 1 | pdf_text |
| 3 | 3. Diffuser D-6 (Sterilization 110) located at ceiling grid per plan; coordinate final location with fire protection sprinkler layout (see FP-101) prior to ceiling grid installation. | 1 | pdf_text |
| 4 | 4. All ductwork 24 ga. galv. steel per SMACNA standards U.N.O. | 1 | pdf_text |
| 4 | 4 A B C D VEST. WAITING OFFICE RR MECH/ELEC OPER. 1 OPER. 2 OPER. 3 STERIL. BREAK OPER. 4 STORAGE RTU-1 OPERATING WT. = 3,200 LB (SEE S-101 BM-7 CAPACITY) RA-1: 24"x14" RETURN DUCT BOTTOM OF DUCT EL. +9'-2" AFF D-1 D-2 D-3 D-6 D-4 D-5 MECHANICAL GENERAL NOTES | 1 | pdf_text |
| 4400 | 4400 W. City of Ch Permit No Mecha Occupan Drawn: J. REVISION A 06/15/26 N SCALE: 1/8" = 1'-0" (SCHEMATIC, NOT TO SCALE) | 1 | pdf_text |