Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 1.2
Severity: high
Engine: real / claude-sonnet-5
Tokens: 1500 in / 294 out
Latency: 5849 ms
Called: 2026-08-15 19:04:35

Flag explanation

Beam B-7 provides only 8 feet 6 inches of clear height above finished floor in Corridor 109, but mechanical ductwork DS-4 in the same corridor requires clearance to the bottom of duct insulation of 8 feet 6 inches above finished floor. Since the duct must be routed below the beam (or through the same overhead space), the duct's required 8'-6" clearance leaves zero margin below the beam's 8'-6" clear height, meaning the duct insulation would either collide with the beam or the stated clearance cannot physically be achieved simultaneously with the beam's clear height requirement.

Prompt sent to model

Clause '1.2' (structural):
1.2 Structural beam B-7 provides a minimum clear height of 8 feet 6 inches above finished floor within Corridor 109.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: b87d8892-c9b4-4675-bc7e-da83a0e78a55] mechanical 1.2: 1.2 Ductwork DS-4 within Corridor 109 shall maintain a minimum clearance of 8 feet 6 inches above finished floor to the bottom of duct insulation.

[id: 3d7a16c7-f33d-4cf7-9289-3a98972fec63] mechanical 1.1: 1.1 Ductwork DS-2 within Corridor 104 shall maintain a minimum clearance of 9 feet 6 inches above finished floor to the bottom of duct insulation.

[id: 81c2bca1-6531-44ce-a8a7-91d776c5527c] electrical 1.2: 1.2 Panel EP-6 in Electrical Room 121 requires a 36 inch clear working space per NEC in front of the panel, mounted on the south wall.

[id: 3c277c45-28b0-4b89-a46f-45a3b21cb96c] electrical 1.1: 1.1 Panel EP-3 in Electrical Room 118 requires a 36 inch clear working space per NEC in front of the panel, mounted on the north wall.

[id: 47423ac6-f6a1-4630-bd8e-16b379b58056] architectural 1.2: 1.2 Door D-15 swings outward into the corridor, away from Electrical Room 121.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"severity": "high", "explanation": "Beam B-7 provides only 8 feet 6 inches of clear height above finished floor in Corridor 109, but mechanical ductwork DS-4 in the same corridor requires clearance to the bottom of duct insulation of 8 feet 6 inches above finished floor. Since the duct must be routed below the beam (or through the same overhead space), the duct's required 8'-6\" clearance leaves zero margin below the beam's 8'-6\" clear height, meaning the duct insulation would either collide with the beam or the stated clearance cannot physically be achieved simultaneously with the beam's clear height requirement.", "cited_clause_ids": ["b87d8892-c9b4-4675-bc7e-da83a0e78a55"]}]}