The footing F-18 bears at a depth of 5 feet 0 inches below finished grade, while the site utility trench along the same column line 18 is excavated to a depth of 3 feet 0 inches below finished grade. This may cause a conflict if the footing and the utility trench intersect.
Clause '1.2' (structural): 1.2 Footing F-18 at column line 18 bears at 5 feet 0 inches below finished grade. Candidate clauses from other disciplines in the same submission (only these may be cited): [id: b6767036-ca01-4cec-b883-550e167c3b79] civil 1.2: 1.2 Site utility trench along column line 18 is excavated to 3 feet 0 inches below finished grade for the domestic water tie-in. [id: 3559aa82-3f88-46f3-8862-0a7fde483a54] civil 1.1: 1.1 Site utility trench along column line 12 is excavated to 4 feet 0 inches below finished grade for the incoming electrical duct bank. [id: 1e6884ec-f31d-4095-9c75-30348243396e] civil 2.1: 2.1 Site grading slopes away from the building at a minimum 2 percent for the first 10 feet. [id: 845b47cf-d162-4d03-a31b-360cb129dfa2] plumbing 1.1: 1.1 Domestic water main enters the building at the northeast corner, 4 feet 0 inches below finished grade. [id: fe0d6025-82ff-47ec-be1e-3dcbe8677631] fire_protection 1.2: 1.2 Sprinkler branch line SP-9 crosses Data Hall 3 at 12 feet 6 inches above finished floor. Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.
{"conflicts": [{"cited_clause_ids": ["b6767036-ca01-4cec-b883-550e167c3b79"], "explanation": "The footing F-18 bears at a depth of 5 feet 0 inches below finished grade, while the site utility trench along the same column line 18 is excavated to a depth of 3 feet 0 inches below finished grade. This may cause a conflict if the footing and the utility trench intersect.", "severity": "medium"}]}