Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 2.1
Severity: high
Engine: groq / llama-3.3-70b-versatile
Tokens: 923 in / 115 out
Latency: 5665 ms
Called: 2026-07-22 04:22:39

Flag explanation

The condenser water piping is routed at 7 feet 0 inches above finished floor, but the reflected ceiling plan for Data Hall 1 requires a minimum 9 feet 0 inches clear from finished floor to the underside of any overhead equipment, duct, tray, or pipe. This is a physical incompatibility.

Prompt sent to model

Clause '2.1' (mechanical):
2.1 Condenser water piping serving CU-6 is routed at 7 feet 0 inches above finished floor along the Data Hall 1 perimeter wall.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: b3006913-bda3-46fb-a810-1b8012937fea] fire_protection 1.1: 1.1 Sprinkler branch line SP-6 crosses Data Hall 2 at 14 feet 3 inches above finished floor, below the required duct insulation clearance.

[id: fe0d6025-82ff-47ec-be1e-3dcbe8677631] fire_protection 1.2: 1.2 Sprinkler branch line SP-9 crosses Data Hall 3 at 12 feet 6 inches above finished floor.

[id: f293f8e9-335d-46ec-9bd6-fbdeb528c2db] architectural 1.2: 1.2 Reflected ceiling plan for Data Hall 4 requires a minimum 8 feet 6 inches clear from finished floor to the underside of any overhead equipment, duct, tray, or pipe.

[id: 845b47cf-d162-4d03-a31b-360cb129dfa2] plumbing 1.1: 1.1 Domestic water main enters the building at the northeast corner, 4 feet 0 inches below finished grade.

[id: 31c0c6f8-2ce0-4848-a79c-a4ed1534ec37] architectural 1.1: 1.1 Reflected ceiling plan for Data Hall 1 requires a minimum 9 feet 0 inches clear from finished floor to the underside of any overhead equipment, duct, tray, or pipe.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"cited_clause_ids": ["31c0c6f8-2ce0-4848-a79c-a4ed1534ec37"], "explanation": "The condenser water piping is routed at 7 feet 0 inches above finished floor, but the reflected ceiling plan for Data Hall 1 requires a minimum 9 feet 0 inches clear from finished floor to the underside of any overhead equipment, duct, tray, or pipe. This is a physical incompatibility.", "severity": "high"}]}