The architectural drawing bases exit signage and panic hardware counts on an 85-person occupant load, while the fire protection drawing FP-101 bases exit sign quantity and hydraulic calculations on a 60-person occupant load. These conflicting occupant load figures must be reconciled between architect and fire protection engineer before finalizing exit signage counts, as stated in this clause.
Prompt sent to model
Clause '6' (fire_protection):
6. Confirm occupant load basis with the architect before finalizing exit signage counts; see the note above.
Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 96b53171-48b1-4dd1-bc7d-f5c6241f358b] architectural 2: 2. This 85-person occupant load is the basis for the exit signage and panic hardware counts on this sheet. Compare against the design occupant load referenced on FP-101, which the fire protection engineer used as the basis for exit sign quantity and hydraulic
calculations on that sheet -- the two figures should match and currently do not (FP-101 references 60 persons).
[id: 79dd5322-efb5-4bae-93e6-d64eae7dff40] architectural 5: 5. Corridor 106 clear width shown 3'-4" (40") -- VERIFY code
minimum for occupant load served (see A-102 egress calc).
[id: 0634ba34-e348-45ef-965c-0b73095bb9fa] civil 8: 8. Existing building setbacks to be field-verified; see the setback note above for required minimums under the current zoning district.
[id: 7f4a0783-affb-45f0-8c9a-ca258573be07] plumbing 10: 10. Provide floor drain at Mech/Elec Room 105 per code; route T&P relief discharge and any condensate to this drain.
[id: 8134ea51-ab17-4add-9fb1-ab1dcdc9c893] mechanical 5: 5. Verify roof structure capacity with the structural engineer prior to setting any rooftop equipment; see the RTU-1 note above.
Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.
Raw model response
{"conflicts": [{"severity": "high", "explanation": "The architectural drawing bases exit signage and panic hardware counts on an 85-person occupant load, while the fire protection drawing FP-101 bases exit sign quantity and hydraulic calculations on a 60-person occupant load. These conflicting occupant load figures must be reconciled between architect and fire protection engineer before finalizing exit signage counts, as stated in this clause.", "cited_clause_ids": ["96b53171-48b1-4dd1-bc7d-f5c6241f358b"]}]}