Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 1.1
Severity: medium
Engine: groq / llama-3.3-70b-versatile
Tokens: 882 in / 108 out
Latency: 5764 ms
Called: 2026-07-22 04:22:05

Flag explanation

Footing F-12 at column line 12 bears at 3 feet 6 inches below finished grade, but the site utility trench along column line 12 is excavated to 4 feet 0 inches below finished grade, which may cause a conflict with the footing bearance.

Prompt sent to model

Clause '1.1' (structural):
1.1 Footing F-12 at column line 12 bears at 3 feet 6 inches below finished grade.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 3559aa82-3f88-46f3-8862-0a7fde483a54] civil 1.1: 1.1 Site utility trench along column line 12 is excavated to 4 feet 0 inches below finished grade for the incoming electrical duct bank.

[id: b6767036-ca01-4cec-b883-550e167c3b79] civil 1.2: 1.2 Site utility trench along column line 18 is excavated to 3 feet 0 inches below finished grade for the domestic water tie-in.

[id: 1e6884ec-f31d-4095-9c75-30348243396e] civil 2.1: 2.1 Site grading slopes away from the building at a minimum 2 percent for the first 10 feet.

[id: 845b47cf-d162-4d03-a31b-360cb129dfa2] plumbing 1.1: 1.1 Domestic water main enters the building at the northeast corner, 4 feet 0 inches below finished grade.

[id: fe0d6025-82ff-47ec-be1e-3dcbe8677631] fire_protection 1.2: 1.2 Sprinkler branch line SP-9 crosses Data Hall 3 at 12 feet 6 inches above finished floor.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"cited_clause_ids": ["3559aa82-3f88-46f3-8862-0a7fde483a54"], "explanation": "Footing F-12 at column line 12 bears at 3 feet 6 inches below finished grade, but the site utility trench along column line 12 is excavated to 4 feet 0 inches below finished grade, which may cause a conflict with the footing bearance.", "severity": "medium"}]}