Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 5
Severity: medium
Engine: real / claude-sonnet-5
Tokens: 1648 in / 225 out
Latency: 3563 ms
Called: 2026-08-09 07:01:09

Flag explanation

Civil clause 5 places the new domestic water service (Station 0+30, east-west) and the electrical duct bank (Station 0+20, north-south) in intersecting alignments without specifying clearance. Electrical clause 5 confirms C-101 shows this crossing with no horizontal/vertical separation called out, creating an unresolved utility clearance conflict that must be coordinated between civil and electrical.

Prompt sent to model

Clause '5' (civil):
5. A new 2" domestic water service runs east-west across the site at approximately Station 0+30. A new electrical service duct bank (see E-101 for the building-side routing) runs north-south at approximately Station 0+20.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 2067eb80-f9e2-4803-9e84-7212f0d801d9] electrical 5: 5. The new electrical service duct bank routes underground from the utility connection to the main distribution equipment; see C-101 for the site routing. C-101 notes a crossing between this duct bank and the new domestic water service with no separation called out --
coordinate the required horizontal and vertical clearance between these utilities with the civil engineer.

[id: c0dba465-0fb3-41ea-84f6-239eb774c8d5] electrical 8: 8. Coordinate underground duct bank routing with civil site utilities, C-101.

[id: d85768ef-17e9-4812-b54e-d3cc4d7b2e7f] mechanical 6: 6. Coordinate all duct routing crossing structural beam lines with the structural engineer's bottom-of-steel elevations shown on S-101; see the RA-1 note above.

[id: 076c85ec-4a24-46a6-a468-fec9fd39a2e2] electrical 3: 3. The plumbing plan (P-101) shows water heater WH-1 set 18" from the same wall as Panel EP-2, which further reduces the usable clear floor space in front of EP-2 to approximately 18" -- coordinate panel and water heater locations with the plumbing engineer.

[id: 61f56850-a3ea-468b-acec-646cd1d5d93c] architectural 5: 5. Emergency/egress lighting along this path is shown on E-101. Coordinate that E-101's emergency fixtures extend the full length of the egress path shown here -- as currently drawn, the emergency lighting fixtures on E-101 stop near Grid 2 and do not appear to continue
the remaining distance to the exit at Vestibule 101.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"severity": "medium", "explanation": "Civil clause 5 places the new domestic water service (Station 0+30, east-west) and the electrical duct bank (Station 0+20, north-south) in intersecting alignments without specifying clearance. Electrical clause 5 confirms C-101 shows this crossing with no horizontal/vertical separation called out, creating an unresolved utility clearance conflict that must be coordinated between civil and electrical.", "cited_clause_ids": ["2067eb80-f9e2-4803-9e84-7212f0d801d9"]}]}