← back to flags
Audit trail
Reasoning trace
Flag explanation
Electrical clause 2 states EP-2 requires 36" clear working space but only 30" is shown, already a deficiency. Plumbing clause 2 further indicates WH-1 as located reduces usable clear floor space in front of EP-2 to approximately 18", compounding the code clearance violation at the same panel/wall location.
Prompt sent to model
Clause '2' (electrical):
2. Panel EP-2 (Mech/Elec Room 105, 120/208V, 30-circuit) is shown with 30" of dedicated clear working space in front of it. The minimum clear working space required for a panel at this voltage-to-ground condition is 36"; the 30" shown does not meet that minimum on its
own, before even accounting for other equipment in the room.
Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: fd258c05-ae45-486c-b520-aaadb73a7a29] plumbing 2: 2. Coordinate WH-1's location with the electrical engineer's Panel EP-2, shown on E-101 on the same wall -- EP-2 requires 36" of dedicated clear working space, and WH-1 as located reduces the usable clear floor space in front of that panel to approximately 18".
[id: 8892de18-a105-4ab1-bfae-ec307cfbae22] plumbing 8: 8. Verify WH-1 clearance from the east wall against the electrical panel clearance requirements shown on E-101 before setting the unit; see the WH-1 notes above.
[id: 79dd5322-efb5-4bae-93e6-d64eae7dff40] architectural 5: 5. Corridor 106 clear width shown 3'-4" (40") -- VERIFY code
minimum for occupant load served (see A-102 egress calc).
[id: f942f82a-9748-4e4f-94c3-21b469a688f0] civil 3: 3. Parking required for this Group B occupancy at 1 space per 300 SF is 14 spaces; 16 spaces are provided in the existing, restriped lot.
[id: 7f4a0783-affb-45f0-8c9a-ca258573be07] plumbing 10: 10. Provide floor drain at Mech/Elec Room 105 per code; route T&P relief discharge and any condensate to this drain.
Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.
Raw model response
{"conflicts": [{"severity": "high", "explanation": "Electrical clause 2 states EP-2 requires 36\" clear working space but only 30\" is shown, already a deficiency. Plumbing clause 2 further indicates WH-1 as located reduces usable clear floor space in front of EP-2 to approximately 18\", compounding the code clearance violation at the same panel/wall location.", "cited_clause_ids": ["fd258c05-ae45-486c-b520-aaadb73a7a29"]}, {"severity": "low", "explanation": "Plumbing clause 8 directs verification of WH-1 clearance from the east wall against the electrical panel clearance requirements on E-101, which is directly related to the EP-2 clearance deficiency identified in this electrical clause, though it is a coordination action rather than an independent conflicting requirement.", "cited_clause_ids": ["8892de18-a105-4ab1-bfae-ec307cfbae22"]}]}