Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 1.1
Severity: high
Engine: groq / llama-3.3-70b-versatile
Tokens: 894 in / 100 out
Latency: 603 ms
Called: 2026-07-22 04:21:27

Flag explanation

The site utility trench along column line 12 is excavated to 4 feet 0 inches below finished grade, which is below the bearing depth of Footing F-12 at 3 feet 6 inches below finished grade, creating a potential conflict.

Prompt sent to model

Clause '1.1' (civil):
1.1 Site utility trench along column line 12 is excavated to 4 feet 0 inches below finished grade for the incoming electrical duct bank.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 728adafa-ab1a-41aa-aa61-b5b4f42c9e79] structural 1.1: 1.1 Footing F-12 at column line 12 bears at 3 feet 6 inches below finished grade.

[id: 1e846493-c72d-463a-ab51-3490c8882962] electrical 2.1: 2.1 Panel EP-9 in Data Hall 1 electrical closet is wall-mounted at 5 feet 0 inches above finished floor.

[id: da668d04-55bb-4aae-98db-9ef5df737b1b] mechanical 1.1: 1.1 Ductwork DS-11 within Data Hall 2 shall maintain a minimum clearance of 14 feet 6 inches above finished floor to the bottom of duct insulation.

[id: f4079e9b-22ff-44aa-a213-bafb4cfc774f] mechanical 2.1: 2.1 Exhaust louver EL-3 penetrates the Data Hall 4 exterior wall at 7 feet 6 inches above finished floor.

[id: d66ba874-2f49-48ee-889d-0eb337194bc1] structural 1.2: 1.2 Footing F-18 at column line 18 bears at 5 feet 0 inches below finished grade.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"cited_clause_ids": ["728adafa-ab1a-41aa-aa61-b5b4f42c9e79"], "explanation": "The site utility trench along column line 12 is excavated to 4 feet 0 inches below finished grade, which is below the bearing depth of Footing F-12 at 3 feet 6 inches below finished grade, creating a potential conflict.", "severity": "high"}]}