← back to flags
Audit trail
Reasoning trace
Flag explanation
Architectural clause 104 refers to the Mech/Elec Room (labeled 104), while plumbing, electrical clauses reference 'Mech/Elec Room 105' - a room numbering discrepancy between architectural and other disciplines' documents that should be reconciled to ensure all trades are coordinating on the same room.
Prompt sent to model
Clause '104' (architectural):
104
MECH / ELECIROOM
Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 7f4a0783-affb-45f0-8c9a-ca258573be07] plumbing 10: 10. Provide floor drain at Mech/Elec Room 105 per code; route T&P relief discharge and any condensate to this drain.
[id: 97ac5b3a-9a80-4f38-ba1e-71e3de9a96ba] plumbing 5: 5. A mop sink (3" waste / 2" vent) is provided in Mech/Elec Room 105.
[id: f59b6e8b-74fb-40ea-80d2-7f748dc69097] electrical 2: 2. Panel EP-2 (Mech/Elec Room 105, 120/208V, 30-circuit) is shown with 30" of dedicated clear working space in front of it. The minimum clear working space required for a panel at this voltage-to-ground condition is 36"; the 30" shown does not meet that minimum on its
own, before even accounting for other equipment in the room.
[id: ef0c7a2e-015d-4659-9824-fb2b7131ef99] fire_protection 5: 5. Note: the architectural life safety plan (A-102) calculates the occupant load for this same floor as 85 persons, based on the final room program. Compare that figure against the 60-person design basis used here -- if 85 is correct, the exit signage count and hydraulic
calculation on this sheet should be revised accordingly.
[id: c584e0d3-403e-4456-a12f-ea9130de5c6a] structural 7: 7. All new steel per AISC 360; connections per AISC 358 as applicable.
Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.
Raw model response
{"conflicts": [{"severity": "medium", "explanation": "Architectural clause 104 refers to the Mech/Elec Room (labeled 104), while plumbing, electrical clauses reference 'Mech/Elec Room 105' - a room numbering discrepancy between architectural and other disciplines' documents that should be reconciled to ensure all trades are coordinating on the same room.", "cited_clause_ids": ["7f4a0783-affb-45f0-8c9a-ca258573be07", "97ac5b3a-9a80-4f38-ba1e-71e3de9a96ba", "f59b6e8b-74fb-40ea-80d2-7f748dc69097"]}]}