Door D-21 swings inward into Electrical Room 210 with a 42-inch arc centered 8 inches off the west wall. Switchgear SG-2, located in the same room, requires a dedicated 42-inch deep working clearance per NEC 110.26 that must remain free of any other trade's infrastructure, including obstructions like door swings. If the door's swing arc overlaps the required clearance zone in front of SG-2, this violates the code-mandated clear working space.
Prompt sent to model
Clause '1.1' (architectural):
1.1 Door D-21 to Electrical Room 210 swings inward with a 42 inch arc centered 8 inches off the west wall.
Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 1e846493-c72d-463a-ab51-3490c8882962] electrical 2.1: 2.1 Panel EP-9 in Data Hall 1 electrical closet is wall-mounted at 5 feet 0 inches above finished floor.
[id: b88a0614-b3f5-45b1-ab48-78fc7d2547c1] electrical 1.1: 1.1 Switchgear SG-2 in Electrical Room 210 requires a dedicated 42 inch deep working clearance, free of any other trade's infrastructure, per NEC 110.26.
[id: c8adaa2a-3f6d-4503-b666-4830a92a26db] structural 2.1: 2.1 Steel joists over Data Hall 1 are spaced at 4 feet on center, bottom chord at 9 feet 6 inches above finished floor.
[id: 82caff87-ed42-40a6-8eb4-beef0b53c95d] low_voltage 2.1: 2.1 Access control head-end panel is mounted in the security closet at 5 feet 6 inches above finished floor.
[id: f4079e9b-22ff-44aa-a213-bafb4cfc774f] mechanical 2.1: 2.1 Exhaust louver EL-3 penetrates the Data Hall 4 exterior wall at 7 feet 6 inches above finished floor.
Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.
Raw model response
{"conflicts": [{"severity": "high", "explanation": "Door D-21 swings inward into Electrical Room 210 with a 42-inch arc centered 8 inches off the west wall. Switchgear SG-2, located in the same room, requires a dedicated 42-inch deep working clearance per NEC 110.26 that must remain free of any other trade's infrastructure, including obstructions like door swings. If the door's swing arc overlaps the required clearance zone in front of SG-2, this violates the code-mandated clear working space.", "cited_clause_ids": ["b88a0614-b3f5-45b1-ab48-78fc7d2547c1"]}]}