Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 6
Severity: medium
Engine: real / claude-sonnet-5
Tokens: 1639 in / 274 out
Latency: 4129 ms
Called: 2026-08-09 07:01:09

Flag explanation

Mechanical clause 6 requires coordination of RA-1 duct crossing beam lines with structural bottom-of-steel elevations on S-101. Structural clause 9 specifies a minimum 2" clearance below bottom-of-steel at BM-4 and flags that the RA-1 duct's noted bottom-of-duct elevation at BM-4's bay needs to be verified/confirmed to actually meet that clearance - this is an open coordination item that could result in a physical clash if the duct elevation as shown does not provide the required 2" clearance.

Prompt sent to model

Clause '6' (mechanical):
6. Coordinate all duct routing crossing structural beam lines with the structural engineer's bottom-of-steel elevations shown on S-101; see the RA-1 note above.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 415c496c-b1a6-461a-91a1-9309989cc1ff] structural 9: 9. Bottom-of-steel elevations noted above are to the bottom of the beam flange, above finished floor. Mechanical and electrical trades should maintain a minimum 2" clearance below bottom-of-steel for all ductwork and conduit racks crossing beam lines -- see M-101,
which shows the RA-1 return duct crossing BM-4's bay with its own bottom-of-duct elevation noted; confirm that elevation clears BM-4's bottom-of-steel by at least 2".

[id: c0dba465-0fb3-41ea-84f6-239eb774c8d5] electrical 8: 8. Coordinate underground duct bank routing with civil site utilities, C-101.

[id: 2067eb80-f9e2-4803-9e84-7212f0d801d9] electrical 5: 5. The new electrical service duct bank routes underground from the utility connection to the main distribution equipment; see C-101 for the site routing. C-101 notes a crossing between this duct bank and the new domestic water service with no separation called out --
coordinate the required horizontal and vertical clearance between these utilities with the civil engineer.

[id: ada4f233-90a1-47cb-a3a7-975a4474df54] civil 6: 6. These two utilities cross near Station 0+20, and no horizontal or vertical separation is called out at the crossing -- coordinate the required clearance between the water service and the duct bank with the electrical engineer and the local utility standards before trenching.

[id: 1b57eceb-1772-49a5-9732-f29f00aaca1a] civil 9: 9. Coordinate the water service / duct bank crossing with the electrical engineer; see the site utilities note above.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"severity": "medium", "explanation": "Mechanical clause 6 requires coordination of RA-1 duct crossing beam lines with structural bottom-of-steel elevations on S-101. Structural clause 9 specifies a minimum 2\" clearance below bottom-of-steel at BM-4 and flags that the RA-1 duct's noted bottom-of-duct elevation at BM-4's bay needs to be verified/confirmed to actually meet that clearance - this is an open coordination item that could result in a physical clash if the duct elevation as shown does not provide the required 2\" clearance.", "cited_clause_ids": ["415c496c-b1a6-461a-91a1-9309989cc1ff"]}]}