Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 1.1
Severity: high
Engine: real / claude-sonnet-5
Tokens: 1500 in / 230 out
Latency: 5041 ms
Called: 2026-08-15 19:04:35

Flag explanation

Structural beam B-4 limits clear height in Corridor 104 to 9'0" AFF, but mechanical clause requires ductwork DS-2 (including insulation) in the same corridor to maintain a minimum clearance of 9'6" AFF. The duct clearance requirement exceeds the clear height available beneath the beam, making the two requirements physically incompatible unless the duct is routed around or through the beam.

Prompt sent to model

Clause '1.1' (structural):
1.1 Structural beam B-4 provides a minimum clear height of 9 feet 0 inches above finished floor within Corridor 104.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: b87d8892-c9b4-4675-bc7e-da83a0e78a55] mechanical 1.2: 1.2 Ductwork DS-4 within Corridor 109 shall maintain a minimum clearance of 8 feet 6 inches above finished floor to the bottom of duct insulation.

[id: 3d7a16c7-f33d-4cf7-9289-3a98972fec63] mechanical 1.1: 1.1 Ductwork DS-2 within Corridor 104 shall maintain a minimum clearance of 9 feet 6 inches above finished floor to the bottom of duct insulation.

[id: 3c277c45-28b0-4b89-a46f-45a3b21cb96c] electrical 1.1: 1.1 Panel EP-3 in Electrical Room 118 requires a 36 inch clear working space per NEC in front of the panel, mounted on the north wall.

[id: 47423ac6-f6a1-4630-bd8e-16b379b58056] architectural 1.2: 1.2 Door D-15 swings outward into the corridor, away from Electrical Room 121.

[id: 81c2bca1-6531-44ce-a8a7-91d776c5527c] electrical 1.2: 1.2 Panel EP-6 in Electrical Room 121 requires a 36 inch clear working space per NEC in front of the panel, mounted on the south wall.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"severity": "high", "explanation": "Structural beam B-4 limits clear height in Corridor 104 to 9'0\" AFF, but mechanical clause requires ductwork DS-2 (including insulation) in the same corridor to maintain a minimum clearance of 9'6\" AFF. The duct clearance requirement exceeds the clear height available beneath the beam, making the two requirements physically incompatible unless the duct is routed around or through the beam.", "cited_clause_ids": ["3d7a16c7-f33d-4cf7-9289-3a98972fec63"]}]}