The door swing arc centered 8 inches off the west wall with a 42 inch radius ( clause 1.1 ) may encroach into the 42 inch deep dedicated working clearance required for Switchgear SG-2 in Electrical Room 210 ( clause 1.1 electrical )
Clause '1.1' (architectural): 1.1 Door D-21 to Electrical Room 210 swings inward with a 42 inch arc centered 8 inches off the west wall. Candidate clauses from other disciplines in the same submission (only these may be cited): [id: 1e846493-c72d-463a-ab51-3490c8882962] electrical 2.1: 2.1 Panel EP-9 in Data Hall 1 electrical closet is wall-mounted at 5 feet 0 inches above finished floor. [id: b88a0614-b3f5-45b1-ab48-78fc7d2547c1] electrical 1.1: 1.1 Switchgear SG-2 in Electrical Room 210 requires a dedicated 42 inch deep working clearance, free of any other trade's infrastructure, per NEC 110.26. [id: c8adaa2a-3f6d-4503-b666-4830a92a26db] structural 2.1: 2.1 Steel joists over Data Hall 1 are spaced at 4 feet on center, bottom chord at 9 feet 6 inches above finished floor. [id: 82caff87-ed42-40a6-8eb4-beef0b53c95d] low_voltage 2.1: 2.1 Access control head-end panel is mounted in the security closet at 5 feet 6 inches above finished floor. [id: f4079e9b-22ff-44aa-a213-bafb4cfc774f] mechanical 2.1: 2.1 Exhaust louver EL-3 penetrates the Data Hall 4 exterior wall at 7 feet 6 inches above finished floor. Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.
{"conflicts": [{"cited_clause_ids": ["b88a0614-b3f5-45b1-ab48-78fc7d2547c1"], "explanation": "The door swing arc centered 8 inches off the west wall with a 42 inch radius ( clause 1.1 ) may encroach into the 42 inch deep dedicated working clearance required for Switchgear SG-2 in Electrical Room 210 ( clause 1.1 electrical )", "severity": "medium"}]}