Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 6
Severity: high
Engine: real / claude-sonnet-5
Tokens: 1551 in / 373 out
Latency: 4759 ms
Called: 2026-08-09 07:01:09

Flag explanation

Electrical clause 6 requires panel working clearance (per EP-1/EP-2 notes) to meet code minimums (typically 36" for the voltage/condition shown). Plumbing clause 2 states WH-1's location reduces the clear working space in front of Panel EP-2 to approximately 18", which is physically incompatible with the required dedicated working clearance.

Prompt sent to model

Clause '6' (electrical):
6. Dedicated equipment space and working clearance for all panels shall meet the applicable electrical code requirements for the voltage and condition shown; see the EP-1 and EP-2 notes above.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: fd258c05-ae45-486c-b520-aaadb73a7a29] plumbing 2: 2. Coordinate WH-1's location with the electrical engineer's Panel EP-2, shown on E-101 on the same wall -- EP-2 requires 36" of dedicated clear working space, and WH-1 as located reduces the usable clear floor space in front of that panel to approximately 18".

[id: 8892de18-a105-4ab1-bfae-ec307cfbae22] plumbing 8: 8. Verify WH-1 clearance from the east wall against the electrical panel clearance requirements shown on E-101 before setting the unit; see the WH-1 notes above.

[id: 0728c639-1e8b-43bd-8ff5-4c53a58fbfef] fire_protection 7: 7. Coordinate all ceiling-mounted device locations with the mechanical engineer prior to ceiling grid installation; see the SP-14/D-6 note above.

[id: 79dd5322-efb5-4bae-93e6-d64eae7dff40] architectural 5: 5. Corridor 106 clear width shown 3'-4" (40") -- VERIFY code
   minimum for occupant load served (see A-102 egress calc).

[id: 126c3988-6be8-4b6d-ab91-5f3019c095f8] mechanical 7: 7. Coordinate ceiling-mounted device locations with the fire protection engineer prior to ceiling grid installation; see the D-6 note above.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"severity": "high", "explanation": "Electrical clause 6 requires panel working clearance (per EP-1/EP-2 notes) to meet code minimums (typically 36\" for the voltage/condition shown). Plumbing clause 2 states WH-1's location reduces the clear working space in front of Panel EP-2 to approximately 18\", which is physically incompatible with the required dedicated working clearance.", "cited_clause_ids": ["fd258c05-ae45-486c-b520-aaadb73a7a29"]}, {"severity": "medium", "explanation": "Plumbing clause 8 calls for verifying WH-1's clearance from the east wall against the electrical panel clearance shown on E-101, directly referencing the same working clearance requirement mandated in electrical clause 6, indicating an unresolved coordination issue between the water heater placement and the panel's required dedicated space.", "cited_clause_ids": ["8892de18-a105-4ab1-bfae-ec307cfbae22"]}]}