Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 1.2
Severity: high
Engine: real / claude-sonnet-5
Tokens: 1481 in / 287 out
Latency: 5600 ms
Called: 2026-08-15 19:04:35

Flag explanation

Structural beam B-7 provides only 8'-6" clear height above finished floor in Corridor 109, which is the same as the required minimum clearance to the bottom of duct insulation for DS-4. Since duct insulation adds thickness below the duct bottom, and the duct itself must be mounted below the beam, there is no physical room for the duct plus insulation to achieve 8'-6" clearance while also clearing the beam soffit at exactly 8'-6". This leaves zero margin for the duct and insulation thickness, hangers, or flanges, making the two requirements physically incompatible.

Prompt sent to model

Clause '1.2' (mechanical):
1.2 Ductwork DS-4 within Corridor 109 shall maintain a minimum clearance of 8 feet 6 inches above finished floor to the bottom of duct insulation.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 42249cff-18ae-4182-9bc0-7eb5c43a096f] structural 1.1: 1.1 Structural beam B-4 provides a minimum clear height of 9 feet 0 inches above finished floor within Corridor 104.

[id: fffc650d-fe44-43f6-b2b0-7c864393b9e8] structural 1.2: 1.2 Structural beam B-7 provides a minimum clear height of 8 feet 6 inches above finished floor within Corridor 109.

[id: 81c2bca1-6531-44ce-a8a7-91d776c5527c] electrical 1.2: 1.2 Panel EP-6 in Electrical Room 121 requires a 36 inch clear working space per NEC in front of the panel, mounted on the south wall.

[id: 3c277c45-28b0-4b89-a46f-45a3b21cb96c] electrical 1.1: 1.1 Panel EP-3 in Electrical Room 118 requires a 36 inch clear working space per NEC in front of the panel, mounted on the north wall.

[id: 47423ac6-f6a1-4630-bd8e-16b379b58056] architectural 1.2: 1.2 Door D-15 swings outward into the corridor, away from Electrical Room 121.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"severity": "high", "explanation": "Structural beam B-7 provides only 8'-6\" clear height above finished floor in Corridor 109, which is the same as the required minimum clearance to the bottom of duct insulation for DS-4. Since duct insulation adds thickness below the duct bottom, and the duct itself must be mounted below the beam, there is no physical room for the duct plus insulation to achieve 8'-6\" clearance while also clearing the beam soffit at exactly 8'-6\". This leaves zero margin for the duct and insulation thickness, hangers, or flanges, making the two requirements physically incompatible.", "cited_clause_ids": ["fffc650d-fe44-43f6-b2b0-7c864393b9e8"]}]}