Door D-12 swings into Electrical Room 118 with a 36 inch arc centered 6 inches off the north wall, directly overlapping the NEC-required 36 inch clear working space in front of Panel EP-3, which is mounted on the north wall of the same room. The door swing would encroach into the panel's required clear working space, violating NEC clearance requirements.
Prompt sent to model
Clause '1.1' (architectural):
1.1 Door D-12 swings into Electrical Room 118 with a 36 inch swing radius centered 6 inches off the north wall.
Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: 81c2bca1-6531-44ce-a8a7-91d776c5527c] electrical 1.2: 1.2 Panel EP-6 in Electrical Room 121 requires a 36 inch clear working space per NEC in front of the panel, mounted on the south wall.
[id: 3c277c45-28b0-4b89-a46f-45a3b21cb96c] electrical 1.1: 1.1 Panel EP-3 in Electrical Room 118 requires a 36 inch clear working space per NEC in front of the panel, mounted on the north wall.
[id: 42249cff-18ae-4182-9bc0-7eb5c43a096f] structural 1.1: 1.1 Structural beam B-4 provides a minimum clear height of 9 feet 0 inches above finished floor within Corridor 104.
[id: b87d8892-c9b4-4675-bc7e-da83a0e78a55] mechanical 1.2: 1.2 Ductwork DS-4 within Corridor 109 shall maintain a minimum clearance of 8 feet 6 inches above finished floor to the bottom of duct insulation.
[id: 3d7a16c7-f33d-4cf7-9289-3a98972fec63] mechanical 1.1: 1.1 Ductwork DS-2 within Corridor 104 shall maintain a minimum clearance of 9 feet 6 inches above finished floor to the bottom of duct insulation.
Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.
Raw model response
{"conflicts": [{"severity": "high", "explanation": "Door D-12 swings into Electrical Room 118 with a 36 inch arc centered 6 inches off the north wall, directly overlapping the NEC-required 36 inch clear working space in front of Panel EP-3, which is mounted on the north wall of the same room. The door swing would encroach into the panel's required clear working space, violating NEC clearance requirements.", "cited_clause_ids": ["3c277c45-28b0-4b89-a46f-45a3b21cb96c"]}]}