Plan Review Copilot
← back to flags
Audit trail

Reasoning trace

Clause: 1.1
Severity: high
Engine: groq / llama-3.3-70b-versatile
Tokens: 924 in / 103 out
Latency: 542 ms
Called: 2026-07-22 04:49:52

Flag explanation

The structural beam B-4 in Corridor 104 provides a minimum clear height of 9 feet 0 inches, but the ductwork DS-2 in the same corridor requires a minimum clearance of 9 feet 6 inches, which is physically incompatible.

Prompt sent to model

Clause '1.1' (structural):
1.1 Structural beam B-4 provides a minimum clear height of 9 feet 0 inches above finished floor within Corridor 104.

Candidate clauses from other disciplines in the same submission (only these may be cited):
[id: b87d8892-c9b4-4675-bc7e-da83a0e78a55] mechanical 1.2: 1.2 Ductwork DS-4 within Corridor 109 shall maintain a minimum clearance of 8 feet 6 inches above finished floor to the bottom of duct insulation.

[id: 3d7a16c7-f33d-4cf7-9289-3a98972fec63] mechanical 1.1: 1.1 Ductwork DS-2 within Corridor 104 shall maintain a minimum clearance of 9 feet 6 inches above finished floor to the bottom of duct insulation.

[id: 3c277c45-28b0-4b89-a46f-45a3b21cb96c] electrical 1.1: 1.1 Panel EP-3 in Electrical Room 118 requires a 36 inch clear working space per NEC in front of the panel, mounted on the north wall.

[id: 47423ac6-f6a1-4630-bd8e-16b379b58056] architectural 1.2: 1.2 Door D-15 swings outward into the corridor, away from Electrical Room 121.

[id: 81c2bca1-6531-44ce-a8a7-91d776c5527c] electrical 1.2: 1.2 Panel EP-6 in Electrical Room 121 requires a 36 inch clear working space per NEC in front of the panel, mounted on the south wall.

Does this clause create a coordination conflict with any of the candidates above - i.e. do they describe the same physical space, element, or system in a way that is physically or functionally incompatible? Call report_cross_discipline_conflicts with your findings, or an empty conflicts list if there's no real conflict.

Raw model response

{"conflicts": [{"cited_clause_ids": ["3d7a16c7-f33d-4cf7-9289-3a98972fec63"], "explanation": "The structural beam B-4 in Corridor 104 provides a minimum clear height of 9 feet 0 inches, but the ductwork DS-2 in the same corridor requires a minimum clearance of 9 feet 6 inches, which is physically incompatible.", "severity": "high"}]}