Plan Review Copilot
← back
Clauses

Redmond, WA — 2021 WSEC R Sept2024

(jurisdiction reference document) / - / - / pdf_2d

390 clause(s)

LabelTextPageExtraction method
0 0. >15% to ≤30% >7.5% to ≤15% 43 pdf_text
0 0. Thermal distribution systems Duct insulation: From Section R403.3.3 Duct insulation: As proposed Duct location: same as proposed design Duct location: As proposed A thermal distribution system efficiency (DSE) of 0.93 shall be applied to both the heating and cooling system efficiencies for all systems. As specified in Table R405.5.2(2) Exception: For non-ducted heating and cooling systems that do not have a fan, the standard reference design distribution system efficiency (DSE) shall be 1. Thermostat Type: Manual, cooling temperature setpoint = 75°F; Heating temperature setpoint = 72°F Same as standard reference For SI: 43 pdf_text
0.35 0.35 More than 50% g glazed fenestration Use Table R303.1.3(1) Foam insulated steel slab with metal edge in steel frameb 16 pdf_text
0.46 0.46 More than 50% glazed fenestration Use Table R303.1.3(1) Insulated steel slab with wood edge in wood framea 16 pdf_text
0.5 0.5 credit for each addition smaller than 500 square feet to a single-family, two-family or townhou dwelling unit. 68 pdf_text
0.5 0.5 credit for each new dwelling unit within an R-2 occupancy building. 68 pdf_text
0.5 0.5 cfm per square foot (2.6 L/s/m2), when tested according to NFRC 400 or AAMA/WDMA/CSA 30 pdf_text
0.56 0.56 More than 50% glazed fenestration Use Table R303.1.3(1) Cardboard honeycomb slab with metal edge in steel frameb 16 pdf_text
0.61 0.61 Style and Rail Doors Sliding glass doors/French doors Use Table R303.1.3(1) Site-Assembled Style and Rail Doors Aluminum in aluminum frame – 16 pdf_text
0.65 0.65. To qualify to claim this credit, the building permit drawings shall specify the option being selected, and shall specify the maximum tested building air leakage, and shall show the qualifying heat recovery ventilation system and its control sequence of operation. 48 pdf_text
0.74 0.74 Note: Appendix A Tables A107.1(2) through A107.1(4) of chapter 51-11C WAC may also be u applicable. a Thermally broken sill (add 0.03 for nonthermally broken sill). b Nonthermally broken sill. TABLE R303.1.3(3) DEFAULT GLAZED FENESTRATION SHGC AND VT 16 pdf_text
0.75 0.75. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the maximum tested building air leakage and shall show the heat recovery ventilation system. 48 pdf_text
0.80 0.80. Duct insulation shall comply with Section R403.3.2. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the maximum tested building air leakage and shall show the heat recovery ventilation system. 49 pdf_text
0.80 0.80. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency. 52 pdf_text
0.91 0.91 or Solar water heating supplementing a minimum standard water heater. Solar water heating will provide a rated minimum savings of 85 therms or 2000 kWh based on the Solar Rating and Certification Corporation (SRCC) Annual Performance of OG-300 Certified Solar Water Heating System or Water heater heated by ground source heat pump meeting the requirements of Option 3.4. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency and, for solar water heating systems, the calculation of the minimum energy savings. 52 pdf_text
0.92 0.92 - (0.21 × SHGC a proposed) As proposed Skylights None As proposed 41 pdf_text
0.93 0.93 Aluminum in aluminum frame with thermal break – 16 pdf_text
1 1. Building street address, or other building site identification 40 pdf_text
1 1. Insulation shall be installed to maintain permanent contact with the underside of the subfloor decking in accordance with manufacturer instructions to maintain required R-value or readily the available cavity space. Insulation supports shall be installed so spacing is no more than 2 inches on center. Foundation vents shall be placed so that the top of the vent is below the lo surface of the floor insulation. 24 pdf_text
1 1. A PHI Low Energy Building project certificate. 56 pdf_text
1 1. Field-fabricated fenestration products (windows, skylights and doors). 30 pdf_text
1 1. The heat pump water heater cannot meet hot water demand. 34 pdf_text
1 1. Calculation of whole-building (as a single zone) sizing for the heating and cooling equipment i the standard reference design residence in accordance with Section R403.6. 45 pdf_text
1 1. The repair improves the energy efficiency of the building; or 61 pdf_text
1 1. When foundation vents are not placed so that the top of the vent is below the lower surface the floor insulation, a permanently attached baffle shall be installed at an angle of 30° from horizontal, to divert air flow below the lower surface of the floor insulation. 25 pdf_text
1 1. Where public health standards require 24-hour pump operation. 36 pdf_text
1 1. A list of compliance features. 56 pdf_text
1 1. Storm windows installed over existing fenestration. 60 pdf_text
1 1. Systems controlled by an occupant sensor that is capable of shutting the system off when occupant is sensed for a period of up to 30 minutes. 30 pdf_text
1 1. Lighting shall be controlled by a manual on and off switch which permits automatic shut-off acti Exception: Lighting serving multiple dwelling units. 37 pdf_text
1 1. EFFICIENT BUILDING ENVELOPE OPTIONS Only one option from Items 1.1 through 1.4 may be selected in this category. Compliance with the conductive UA targets is demonstrated using Section R402.1.5, Total UA alternative, where [1-(Proposed UA/Target UA)] > the required %UA reduction 47 pdf_text
1 1. Fan-type central furnaces. 31 pdf_text
1 1 square foot = 0.93 m2, 1 British thermal unit = 1055 J, 1 pound per square foot = 4.88 kg/m2, 1 gallon (U.S.) = L, °C = (°F-3)/1.8, 1 degree = 0.79 rad a. Where required by the code official, testing shall be conducted by an approved party. Hourly calculation specified in the ASHRAE Handbook of Fundamentals, or the equivalent, shall be used to determine the energy loads resulting from infiltration. b. The combined air exchange rate for infiltration and mechanical ventilation shall be determined in accord with Equation 43 of 2001 ASHRAE Handbook of Fundamentals, page 26.24 and the "Whole-house Ventilation" provisions of 2001 ASHRAE Handbook of Fundamentals, page 26.19 for intermittent mech ventilation. c. Thermal storage element shall mean a component not part of the floors, walls or ceilings that is part of passive solar system, and that provides thermal storage such as enclosed water columns, rock beds, or phase-change containers. A thermal storage element must be in the same room as fenestration that fac within 15 degrees (0.26 rad) of true south, or must be connected to such a room with pipes or ducts that allow the element to be actively charged. d. For a proposed design with multiple heating, cooling or water heating systems using different fuel types, applicable standard reference design system capacities and fuel types shall be weighted in accordance their respective loads as calculated by accepted engineering practice for each equipment and fuel type pre 43 pdf_text
1 1. U-factors are applicable to glass and plastic, flat and domed units, all spacers and gaps. 17 pdf_text
1 1) The thermal conductivity of the thermal break material shall be not more than 3.6 Btu-in/h/ft2/°F; 15 pdf_text
1 1. Above-grade walls of concrete block, concrete, insulated concrete form, masonry cavity, brick not brick veneer, adobe, compressed earth block, rammed earth, mass timber or solid logs. 24 pdf_text
1 1. The predominant R-values of insulation installed in or on ceiling/roof, walls, foundation (slab, b grade wall, and/or floor) and ducts outside conditioned spaces. 19 pdf_text
1 1. Detached one- and two-family dwellings. 11 pdf_text
1 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, bey the intended weatherstripping or other infiltration control measures. 26 pdf_text
1 1) The thermal conductivity of the thermal break material shall be not more than 3.6 Btu-in/h/ft2/° 18 pdf_text
1 1. The alteration improves the energy efficiency of the building; or 60 pdf_text
1 1. Sections R401 through R404. In addition, dwelling units and sleeping units in a residential build shall comply with Section R406. 19 pdf_text
1 1. Building street address, or other building site identification. 38 pdf_text
1 1. Air-impermeable spray foam products shall be permitted to be applied without additional joi seals. 32 pdf_text
1 1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. 26 pdf_text
1 1. A PHIUS+ 2018 (or later) project certificate. R407.3 Passive House Institute (PHI). Projects shall comply with Low Energy Building Standard, version 9f or later, including performance calculations by PHI-approved software. Projects shall also comply with the provisions of Section R401 through R404. R407.3.1 PHI documentation. Prior to the issuance of a building permit, the following items must b provided to the code official: 56 pdf_text
1 1, Rue de Varembe, Case Postal 56, CH-1211 Geneva, Switzerland Standard R reference number Title sectio ISO/IEC 17024-2012 Conformity Assessment: General Requirements for Bodies Operating Certification of Persons ..................................................................... R NEEA Northwest Energy Efficiency Alliance 64 pdf_text
1 1. Rough-in test: Total leakage shall be less than or equal to 4.0 cfm (113.3 L/min) per 100 squ feet (9.29 m2) of conditioned floor area when tested at a pressure differential of 0.1 inches w. (25 Pa) across the system, including the manufacturer's air handler enclosure. All registers s be taped or otherwise sealed during the test. If the air handler is not installed at the time of th test, total leakage shall be less than or equal to 3.0 cfm (85 L/min) per 100 square feet (9.29 of conditioned floor area. 32 pdf_text
1 1 Batterymarch Park Quincy, MA 02169-7417 Standard R reference number Title sectio 65 pdf_text
1 1. Small Dwelling Unit: ........................................................................................... 5.0 credits Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square fe fenestration area. Additions to existing building greater than 500 square feet of heated floor area less than 1500 square feet. 47 pdf_text
1 1. Sources of hot water include water heaters, or in multifamily buildings with central water heating syst circulation loops or electric heat traced pipes. 44 pdf_text
1 1. Energy compliance path per Section R401.2. 2 pdf_text
1 1. Units without NFRC ratings produced by a small business may be assigned default U-facto from Table R303.1.3(5) for vertical fenestration. 15 pdf_text
1 1. Those with a peak design rate of energy usage less than 3.4 Btu/h • ft2 (10.7 W/m2) or 1.0 wa of floor area for space conditioning purposes. 20 pdf_text
1 1. Where the hot water system efficiency is greater than or equal to 2.0 UEF. 34 pdf_text
1 1. The supply and return ducts shall have an insulation R-value not less than R-8. 32 pdf_text
1 1. Where ducts from an existing heating and cooling system are extended, duct systems with than 40 linear feet in unconditioned spaces shall not be required to be tested in accordance with Section R403.2.2. 60 pdf_text
1 1. Additions of less than 150 square feet. 59 pdf_text
1 1. Dishwasher, standard – Energy Star rated, Most Efficient 2021 or Dishwasher, compact – Energy Star rated (Version 6.0) 54 pdf_text
1 1. The requirements of the sections indicated within Table R405.2. 38 pdf_text
1 1. Glass only replacements in an existing sash and frame. 61 pdf_text
1 1. Pump motors: Pool pump motors with a capacity of 1 hp or more shall have the capability of operating at two or more speeds with low speed having a rotation rate that is no more than o half of the motor's maximum rotation rate. 36 pdf_text
1 1. All duct systems shall be located completely within the continuous air barrier and within the building thermal envelope. 31 pdf_text
1.0 1.0 credit for each new single-family, two-family and townhouse dwelling unit. 68 pdf_text
1.0 1.0 credit for each new dwelling unit within an R-2 occupancy building. 68 pdf_text
1.0 1.0 credit for each addition smaller than 500 square feet to a single-family, two-family or townhou dwelling unit. 68 pdf_text
1.0 1.0 credit for each addition of 500 square feet or larger to a single-family, two-family or townhous dwelling unit. Where Section R405, Simulated performance alternative, is used, the maximum allowable energy consumption shall be 92 percent of the value calculated according to Section R405.3. Appendix RB—Optional energy efficiency measures—Two step. Building owners may choose to this appendix to achieve an additional 12 percent savings in building energy use. The number of additional energy efficiency credits required by Section R406.3 would be increased by the following amounts: 68 pdf_text
1.1 1.1 Prescriptive compliance is based on Table R402.1.3 with the following modifications: Vertical fenestration U = 0.22. 47 pdf_text
1.2 1.2 Prescriptive compliance is based on Table R402.1.3 with the following modifications: Vertical fenestration U = 0.25 FloorR-38 Basement wall R-21 int plus R-5 ci Ceiling and single-rafter or joist-vaulted R-60 advanced Slab on grade R-10 perimeter and under entire slab Below grade slab R-10 perimeter and under entire slab or Compliance based on Section R402.1.5: Reduce the Total conductive UA by 15%. 47 pdf_text
1.3 1.3 Prescriptive compliance is based on Table R402.1.3 with the following modifications: Vertical fenestration U = 0.18 Ceiling and single-rafter or joist-vaulted R-60 advanced Wood frame wall R-21 int plus R-12 ci Floor R-38 Basement wall R-21 int plus R-12 ci Slab on grade R-10 perimeter and under entire slab Below grade slab R-10 perimeter and under entire slab or 47 pdf_text
1.4 1.4 Prescriptive compliance is based on Table R402.1.3 with the following modifications: Vertical fenestration U = 0.18 Ceiling and single-rafter or joist-vaulted R-60 advanced Wood frame wall R-21 int plus R-16 ci Floor R-48 Basement wall R-21 int plus R-16 ci Slab on grade R-20 perimeter and under entire slab Below grade slab R-20 perimeter and under entire slab or Compliance based on Section R402.1.5: Reduce the Total conductive UA by 30%. 48 pdf_text
1.5 1.5 credit for each addition of 500 square feet or larger to a single-family, two-family or townhous dwelling unit. Where Section R405, Simulated performance alternative, is used, the maximum allowable energy consumption shall be 84 percent of the value calculated according to Section R405.3. 68 pdf_text
10 10 CFR Part 430 Uniform Energy Factor or the equipment shall meet the requirements of Section C4 R403.5.1 Heated water circulation and temperature maintenance systems. Heated water circulation systems shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls, tempera sensors and pumps shall be in a location with access. Manual controls shall be in a location with re access. R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe shall be a dedicated return pipe or a cold water supply Gravity and thermosyphon circulation systems shall be prohibited. Controls for circulating hot wat system pumps shall automatically turn off the pump when the water in the circulation loop is at th desired temperature and when there is no demand for hot water. The controls shall limit the temperature of the water entering the cold water piping to not greater than 104° F (40°C). R403.5.1.1.1 Demand recirculation water systems. Demand recirculation water systems sha have controls that start the pump upon receiving a signal from the action of a user of a fixture o appliance, sensing the presence of a user of a fixture or sensing the flow of hot or tempered wa to a fixture fitting or appliance. R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL Controls for such systems shall a 33 pdf_text
10 (cont. 2) utomatically adjust the energy input to the heat tracing to mainta the desired water temperature in the piping in accordance with the times when heated water is us in the occupancy. R403.5.2 Water volume determination. The volume shall be the sum of the internal volumes of pi fittings, valves, meters, and manifolds between the nearest source of heated water and the terminat of the fixture supply pipe. Water heaters, circulating water systems, and heat trace temperature 33 pdf_text
10.0 10.0) shall be installed and provide heating to the largest zone of the housing unit. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 50 pdf_text
100 100—2020 Procedure for Determining Fenestration Products U-factors—Second Edition .. 65 pdf_text
100 100 Barr Harbor Drive West Conshohocken, PA 19428-2859 Standard R reference number Title sectio C 1363-11 Standard Test Method for Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus ................................................................. R30 E 283—2004 (2012) Test Method for Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls and Doors Under Specified Pressure Differences Across the Specimen ..................................... R E 779-2010 (2018) Standard Test Method for Determining Air Leakage Rate by Fan Pressurization .................................................................................... R40 E1554/E1554M—E2013 Standard Test Methods for Determining Air Leakage of Air Distribution Systems by Fan Pressurization ................................................. R E1827-2011 (2017) Standard Test Method for Determining Airtightness of Building Using an Orifice Blower Door ........................................................... R40 E2178—2013 Standard Test Method for Air Permeance of Building Materials ........................... R E3158—2018 Standard Test Method for Measuring the Air Leakage Rate of a Large or Multizone Building ................................................................... R40 CSA Canadian Standards Association 63 pdf_text
100 100 square feet (9.29 m2) of conditioned floor area or total leakage shall be less than or equa 33 pdf_text
1000 1000 North Rand Road, Suite 214 Wauconda, IL 60084 Standard R reference number Title sectio 64 pdf_text
101 101/I.S.2/A440—17 North American Fenestration Standard/Specification for Windows, Doors and Unit Skylights ................................................................. R WSU Washington State University Energy Extension Program 66 pdf_text
101 101/I.S.2/A440—17 North American Fenestration Standard/Specification for Windows, Doors and Unit Skylights ................................................................. R CSA 55.1-2015 Test Method for Measuring Efficiency and Pressure Loss of Drain Water Heat Recovery Systems .................................... R403.5.4, Table CSA 55.2-2015 Drain Water Heat Recovery Units ...................................................................... R CSA P.4.1-15 Testing Method for Measuring Annual Fireplace Efficiency ................................ R DASMA Door and Access System Manufacturers Association 63 pdf_text
101 101/I.S.2/A C440—17 North American Fenestration Standard/ Specifications for Windows, Doors and Unit Skylights ...................................... R ACCA Air Conditioning Contractors of America 62 pdf_text
101 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacture Exceptions: 30 pdf_text
105-2017 105-2017 Test Method for Thermal Transmittance and Air Infiltration of Garage Doors ......................................................................... R 63 pdf_text
1300 1300 Sumner Avenue Cleveland, OH 44115-2851 Standard R reference number Title sectio 63 pdf_text
1300 1300 17th Street N No. 900 Arlington, VA 22209 Standard R reference number Title sectio OS 4—2016 Requirements for Air-Sealed Boxes for Electrical and Communications Applications .............................................................................. NFPA National Fire Protection Association’ 65 pdf_text
1400 1400 East Touhy Avenue, Suite 470 Des Plaines, IL 60018 Standard R reference number Title sectio AAMA/WDMA/CSA 66 pdf_text
16 16 Vented Decorative Gas Appliances ...................................................................... R Z21.88-2017/CSA 2.23- 62 pdf_text
17 17 Vented Gas Fireplace Heaters............................................................................. R Z21.40.2-1996 Gas-fired, Work Activated Air-Conditioning and Heat Pump Appliances (Internal Combustion) ............................................ Table Z21.40.4-1996 Performance Testing and Rating of Gas-Fired, Air-Conditioning and Heat Pump Appliances .............................................. Table APSP The Association of Pool and Spa Professionals 62 pdf_text
1791 1791 Tullie Circle, NE Atlanta, GA 30329-2305 Standard R reference number Title sectio ASHRAE—2021 ASHRAE Handbook of Fundamentals .................................. R402.1.5, Table R40 ASHRAE 193—2010 (RA 2014) Method of Test for Determining the Airtightness of HVAC Equipment ............. R40 ASTM ASTM International 63 pdf_text
1827 1827 Walden Office Square Suite 550 Schaumburg, IL 60173-4268 Standard R reference number Title sectio AAMA/WDMA/CSA 62 pdf_text
2 2. Postconstruction test: Leakage to outdoors shall be less than or equal to4 cfm (113.3 L/min) 33 pdf_text
2 2. Tankless water heaters. 34 pdf_text
2 2. A statement from a passive house certifier that the modeled energy performance is congruen with the plans and specifications, and that the modeled performance meets said standard. Prior to the issuance of a certificate of occupancy, the following item must be provided to the cod official: 56 pdf_text
2 2. Fireplaces and stoves complying with Section R402.3.6 of this code and Section R100 the International Residential Code. R402.3.6 Fireplaces. New wood-burning fireplaces shall have tight-fitting flue dampers or doors an outdoor combustion air. When using tight-fitting doors on factory-built fireplaces listed and labeled i accordance with UL 127, the doors shall be tested and listed for the fireplace. When using tight-fitti doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907. Gas fireplaces shall comply with the efficiency requirements in Section R403.7.2. R402.4 Air leakage. The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.4.1 through R402.4.4. R402.4.1 Building thermal envelope air leakage. The building thermal envelope shall comply wit Sections R402.4.1.1 through R402.4.1.3. The sealing methods between dissimilar materials shall al for differential expansion and contraction. R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria lis in Table R402.4.1.1, as applicable to the method of construction. Where required by the code offi an approved third party shall inspect all components and verify compliance. R402.4.1.2 Testing. The building or dwelling unit shall be tested for air leakage. Testing shall be conducted in a 26 pdf_text
2 2. The repair is energy efficient and is necessary for the health, safety, and welfare of the general public. R504.2 Application. For the purposes of this code, the following shall be considered repairs. 61 pdf_text
2 2. Lighting shall be automatically shut off when daylight is present and satisfies the lighting needs. 37 pdf_text
2 2. Pumps that operate solar- and waste-heat-recovery pool heating systems. R403.10.3 Covers. Outdoor heated pools and outdoor permanent spas shall be provided with a va retardant cover, or other approved vapor retardant means. Exception: Where more than 75 percent of the energy for heating, computed over an operating season of not fewer than three calendar months, is from a heat pump or on-site renewable energ system, covers or other vapor-retardant means shall not be required. R403.10.4 Residential pool pumps. Pool pump motors may not be split-phase or capacitor start- induction run type. R403.10.4.1 Two-speed capability. 36 pdf_text
2 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed but not sealed beyond intended infiltration control measures. 26 pdf_text
2 2) The thermal break material must produce a gap in the frame material of not less than 0.210 inches; and 15 pdf_text
2 2. The hot water rectangle shall include the source of hot water and the points of termination of all hot w fixture supply piping. 44 pdf_text
2 2 or more stories >60% >30% >30% to ≤60% >15% to ≤30% 43 pdf_text
2 2. The name, organization and contact information of the individual performing the analysis a generating the compliance report. 38 pdf_text
2 2. Floor framing cavity insulation shall be permitted to be in contact with the top side of sheathin separating the cavity and the unconditioned space below. Insulation shall extend from the bot to the top of all perimeter floor framing members and the framing members shall be air seale 24 pdf_text
2 2. Refrigerator (if provided) – Energy Star rated (Version 5.1) 54 pdf_text
2 2. Existing duct systems constructed, insulated or sealed with asbestos. R503.1.3 Service hot water systems. New service hot water systems that are part of the alteratio shall comply with Section R403.5. Exception: Replacement of water heating equipment shall not be required to comply with Sectio R403.5.5. 60 pdf_text
2 2. Medium Dwelling Unit: ...................................................................................... 8.0 credits All dwelling units that are not included in #1, #3 or #4. 47 pdf_text
2 2. Pump controls: Pool pump motor controls shall have the capability of operating the pool pum with at least two speeds. The default circulation speed shall be the lowest speed, with a high speed override capability being for a temporary period not to exceed one normal cycle. R403.10.4.2 Pump operation. Circulating water systems shall be controlled so that the circulatio pump(s) can be conveniently turned off, automatically or manually, when the water system is not i operation. R403.11 Portable spas. The energy consumption of electric-powered portable spas shall be controll by the requirements of APSP-14. R403.12 Residential pools and permanent residential spas. The energy consumption of residenti swimming pools and permanent residential spas shall be controlled in accordance with the requireme of APSP-15. R403.13 Reserved. 36 pdf_text
2 2. For ducts having a static pressure classification of less than 2 inches of water column (500 additional closure systems shall not be required for continuously welded joints and seams, locking-type joints and seams of other than the snap-lock and button-lock types. R403.3.4.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of the design air flow rate when tested in accordance with ASHRAE 193. R403.3.5 Duct testing. Ducts shall be leak tested in accordance with WSU RS-33, using the maxi duct leakage rates specified. Exception: A duct air leakage test shall not be required for ducts serving ventilation systems that not integrated with ducts serving heating or cooling systems. A written report of the results shall be signed by the party conducting the test and provided to the c official. R403.3.6 Duct leakage. The total leakage of the ducts, where measured in accordance with Sectio R403.3.3, shall be as follows: 32 pdf_text
2 2. U-factors for fenestration and the solar heat gain coefficient (SHGC) of fenestration. Where the more than one value for each component, the certificate shall indicate the area weighted avera value. 19 pdf_text
2 2. Roof repairs. 61 pdf_text
2 2. Owner-built, nonoperable wood frame window consisting of a double pane unit with low-e (E=0.04 or less), ½-inch airspace with argon fill. TABLE R303.1.3(1) DEFAULT GLAZED WINDOW, GLASS DOOR AND SKYLIGHT U-FACTOR a. Metal Thermal Break = A metal thermal break framed window shall incorporate the following minimum desi characteristics: 15 pdf_text
2 2. For structures less than 1,500 square feet of conditioned floor area, the annual site energy consumption shall be less than or equal to 64 percent of the annual site energy consumption of standard reference design. 38 pdf_text
2 2) The thermal break material must produce a gap in the frame material of not less than 0.210 in and 18 pdf_text
2 2. For heat pumps located in unconditioned space, the outside air temperature is below 40°F (4°C). 34 pdf_text
2 2. Duct systems that are documented to have been previously sealed as confirmed through fi verification and diagnostic testing in accordance with procedures in WSU RS-33. 59 pdf_text
2 2. Any wall having a heat capacity greater than or equal to 6 Btu/ft2 x °F (123 kJ/m3 x K). R402.2.6 Steel-frame ceilings, walls, and floors. Steel-frame ceilings, walls, and floors shall com with the U-factor requirements of Table R402.1.2. R402.2.7 Floors. Floor cavity insulation shall comply with one of the following: 24 pdf_text
2 2. Multiple single-family dwellings (townhouses). 11 pdf_text
2 2. Systems controlled solely by a manually operated timer capable of operating the system for more than two hours. 30 pdf_text
2 2. At all points along each duct, the sum of the ceiling insulation R-value against and above the of the duct, and against and below the bottom of the duct, shall be not less than R-19, exclud the R-value of the duct insulation. Exception: Sections of the supply duct that are less than 3 feet (914 mm) from the supply outlet shall not be required to comply with these requirements. R403.3.3.1 Effective R-value of deeply buried ducts. Where using the Total Building Performa compliance option in Section R405, sections of ducts that are: installed in accordance with Sectio R403.3.3; located directly on, or within 5.5 inches (140 mm) of the ceiling; surrounded with blown attic insulation having an R-value of R-30 or greater and located such that the top of the duct is n less than 3.5 inches (89 mm) below the top of the insulation, shall be considered as having an effective duct insulation R-value of R-25. R403.3.4 Sealing. Ducts, air handlers, and filter boxes shall be sealed. Joints and seams shall com with either the International Mechanical Code or International Residential Code, as applicable. Exceptions: 32 pdf_text
2 2. All heating, cooling and ventilation system components shall be installed inside the condition space including, but not limited to, forced air ducts, hydronic piping, hydronic floor heating loo convectors and radiators. Combustion equipment shall be direct vent or sealed combustion. 31 pdf_text
2 2. Insulation materials and their R-values. 2 pdf_text
2 2. Those that do not contain conditioned space. 20 pdf_text
2 2. Household cooking appliances. Exception: Household cooking appliances without electrical supply voltage connection and in which each pilot light consumes less than 150 Btu/hr. 31 pdf_text
2 2. Emissivities shall be less than or equal to the value specified. 17 pdf_text
2 2. The alteration is energy efficient and is necessary for the health, safety, and welfare of the general public. R503.1.1 Building envelope. Building envelope assemblies that are part of the alteration shall co with Section R402.1.3 or R402.1.5, Sections R402.2.1 through R402.2.10, R402.3.1, R402.3.2, R402.3.5 and R402.4.2. Exception: The following alterations need not comply with the requirements for new construction provided the energy use of the building is not increased: 60 pdf_text
2 2. AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION OPTIONS Only one option from Items 2.1 through 2.3 may be selected in this category. 48 pdf_text
2 2. Calculations that account for the effects of indoor and outdoor temperatures and part-load rat on the performance of heating, ventilating and air-conditioning equipment based on climate a equipment sizing. 45 pdf_text
2 2. Existing ceiling, wall or floor cavities exposed during construction provided that these cav are filled with insulation. 2x4 framed walls shall be insulated to a minimum of R-15 and 2 framed walls shall be insulated to a minimum of R-21. 60 pdf_text
2 2. Custom exterior fenestration products manufactured by a small business provided they me the applicable provisions of Chapter 24 of the International Building Code. Once visual inspection has confirmed the presence of a gasket, operable windows and doors manufact by small business shall be permitted to be sealed off at the frame prior to the test. R402.4.3 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall Type IC-rated and certified under ASTM E283 as having an air leakage rate not more than 2.0 cfm (0.944 L/s) when tested at a 1.57 psf (75 Pa) pressure differential and shall have a label attached showing compliance with this test method. All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. R402.4.4 Electrical and communication outlet boxes (air-sealed boxes). Electrical and communication outlet boxes installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces. Electrical and communication outlet boxe shall be tested in accordance with NEMA OS 4, Requirements for Air-Sealed Boxes for Electrical a Communication Applications, and shall have an air leakage rate of not greater than 2.0 cubic feet p minute (0.944 L/s) at a pressure differential of 1.57 psf (75 Pa). Electrical and communication outlet boxes shall be marked “NEMA OS 4” or “OS 4” in accordance with NEMA OS 4. Electrical and communic 30 pdf_text
2 2. Substantial contact with the surface being insulated is not required in enclosed floor/ceiling assemblies containing ducts where full R-value insulation is installed between the duct and exterior surface. R402.2.8 Below-grade walls. Below-grade exterior wall insulation used on the exterior (cold) side the wall shall extend from the top of the below-grade wall to the top of the footing and shall be appr for below-grade use. Above-grade insulation shall be protected. Insulation used on the interior (war side of the wall shall extend from the top of the below-grade wall to the below-grade floor level and include R-5 rigid board providing a thermal break between the concrete wall and the slab. R402.2.9 Slab-on-grade floors. The minimum thermal resistance (R-value) of the insulation aroun the perimeter of unheated or heated slab-on-grade floors shall be as specified in Table R402.1.3. T insulation shall be placed on the outside of the foundation or on the inside of the foundation wall. T insulation shall extend downward from the top of the slab for a minimum distance as shown in the t or to the top of the footing, whichever is less, or downward to at least the bottom of the slab and the horizontally to the interior or exterior for the total distance shown in the table. A two-inch by two-inc (maximum) pressure treated nailer may be placed at the finished floor elevation for attachment of interior finish materials. Insulation extending away from the building shall be protec 25 pdf_text
2 2. Declaration of the total building performance path on the title page of the energy report and title page of the building plans. 40 pdf_text
2 (cont. 2) ted by pavement by a minimum of 10 inches (254 mm) of soil. R402.2.9.1 Heated slab-on-grade floors. The entire area of a heated slab-on-grade floor shall b thermally isolated from the soil with a minimum of R-10 insulation. The insulation shall be an approved product for its intended use. If a soil gas control system is present below the heated sla on-grade floor, which results in increased convective flow below the heated slab-on-grade floor, t heated slab-on-grade floor shall be thermally isolated from the sub-slab gravel layer. R-10 heated slab-on-grade floor insulation is required for all compliance paths. R402.2.10 Masonry veneer. Insulation shall not be required on the horizontal portion of the founda that supports a masonry veneer. R402.3 Fenestration. In addition to the requirements of Section R402, fenestration shall comply with Sections R402.3.1 through R402.3.6. R402.3.1 U-factor. An area-weighted average of fenestration products shall be permitted to satisfy U-factor requirements. R402.3.2 Glazed fenestration SHGC. An area-weighted average of fenestration products more th 25 pdf_text
2 (cont. 2) ation outlet boxes shall be installed per the manufacturer’s instructions and with any sup components required to achieve compliance with NEMA OS 4. R402.5 Maximum fenestration U-factor. The area-weighted average maximum fenestration U-facto permitted using tradeoffs from Section R402.1.5 or R405 shall be 0.48 for vertical fenestration, and 0. for skylights. Exception: The maximum U-factor and solar heat gain coefficient (SHGC) for fenestration shall not required in storm shelters complying with ICC 500. SECTION R403 SYSTEMS R403.1 Controls. Not less than one thermostat shall be provided for each separate heating and cooli system. R403.1.1 Programmable or connected thermostat. Where the primary heating system is a force furnace, at least one thermostat per dwelling unit shall be Energy Star certified and capable of controlling the heating and cooling system on a daily schedule to maintain different temperature set points at different times of the day and different days of the week. The thermostat shall allow for, at minimum, a 5-2 programmable schedule (weekdays/weekends) and be capable of providing at leas two programmable setback/setup periods per day. This thermostat shall include the capability to set back, set up or temporarily operate the system to maintain zone temperatures down to 55°F (13°C) up to 85°F (29°C). The thermostat shall be programmed initially by the manufacturer with a heating temperature set point of not greater than 70°F (21°C) and a cooling t 30 pdf_text
2 (cont. 2) ccordance with RESNET/ICC 380, ASTM E779, or ASTM E1827. Test pressure a leakage rate shall comply with Section R402.1.3. A written report of the test results, including veri location and time stamp of the date of the test, shall be signed by the testing agency and provide the building owner and code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Once visual inspection has confirmed air sealing h been conducted in accordance with Table R402.4.1.1, operable windows and doors manufacture small business are permitted to be sealed off at the frame prior to the test. Testing of single-family dwellings and townhouses shall be conducted in accordance with RESNET/ICC 380. Test pressure and leakage rate shall comply with Section R402.1.3.1. For Group R-2 occupancies, testing shall be conducted in accordance with ASTM E779, ASTM E1827, or ASTM E3158. Test pressure and leakage rate shall comply with Section R402.1.3.2. T individual performing the air leakage test shall be trained and certified by an certification body tha at the time of permit application, an ISO 17024 accredited certification body including, but not limi to, the Air Barrier Association of America. During testing: 26 pdf_text
2 (cont. 3) emperature set point of not les than 78°F (26°C). The thermostat and/or control system shall have an adjustable deadband of not l than 10°F. Exceptions: 30 pdf_text
2.0 2.0 credit for each new single-family, two-family and townhouse dwelling unit. 68 pdf_text
2.1 2.1 Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 2.0 air changes per hour maximum at 48 pdf_text
2.2 2.2 Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 1.5 air changes per hour maximum at 48 pdf_text
2.3 2.3 Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 0.6 air changes per hour maximum at 49 pdf_text
200 200—2020 Procedure for Determining Fenestration Product Solar Heat Gain Coefficients and Visible Transmittance at Normal Incidence—Second Edition .................... 65 pdf_text
2011 2011 American National Standard for Residential Swimming Pool and Spa Energy Efficiency .................................................................................... ANSI/RESNET/ICC 380— 64 pdf_text
2015 2015 Washington State Energy Code ABBREVIATIONS: AFB Air Force Base AP Airport CO City Office RS Ranger Station Typical: "4(miles)NE" 71 pdf_text
2019 2019 Standard for Testing Airtightness of Building Dwelling Unit and Sleeping Unit Enclosures; Airtightness of Heating and Cooling Air Distribution Systems, and Airflow of Mechanical Ventilation Systems ........................................................................................... R IBC—21 International Building Code ..................................................... R201.3, R303.2, R ICC 400—17 Standard on the Design and Construction of Log Structures .................. Table R ICC 500—2020 ICC/NSSA Standard for the Design and Construction of Storm Shelters .............. IFC—21 International Fire Code ......................................................................................... IFGC—21 International Fuel Gas Code .................................................................................. IMC—21 International Mechanical Code .................................................. R201.3, R403.2.2 IRC—21 International Residential Code ................. R201.3, R303.2, R402.2.10, R403.2.2 IEEE The Institute of Electrical and Electronic Engineers, Inc. 64 pdf_text
2021 2021 Washington State Energy WDMA Window and Door Manufacturers Association 66 pdf_text
2021 2021 Washington State Energy APPENDIX RA / RB OPTIONAL ENERGY EFFICIENCY MEASURES Appendix RA—Optional energy efficiency measures—One step. Building owners may choose to this appendix to achieve an additional 6 percent savings in building energy use. The number of additi energy efficiency credits required by Section R406.3 would be increased by the following amounts: 68 pdf_text
2021 2021 Washington State Energy Code R403.6 Mechanical ventilation. The buildings complying with Section R402.4.1 shall be provided wit mechanical ventilation that meets the requirements of Section M1505 in the International Residential Code or the International Mechanical Code, as applicable, or with other approved means of ventilatio Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventila system is not operating. R403.6.1 Whole-house mechanical ventilation system fan efficacy. Mechanical ventilation syst fans shall meet the efficacy requirements of Table R403.6.1 at one or more rating points. Fans shall be tested in accordance with HVI 916 and listed. The airflow shall be reported in the product li or on the label. Fan efficacy shall be reported in the product listing or shall be derived from the inpu power and airflow values reported in the product listing on the label. Fan efficacy for fully ducted H ERV, balanced, and in-line fans shall be determined at a static pressure of not less than 0.2 inch w. (49.85 Pa). Fan efficacy for ducted range hoods, bathroom and utility room fans shall be determine a static pressure of not less than 0.1 inch w.c. (24.91 Pa). TABLE R403.6.1 WHOLE-DWELLING MECHANICAL VENTILATION SYSTEM FAN EFFICACYa For SI: 1 cfm = 28.3 L/min. a. Design outdoor or exhaust airflow rate/watts of fan used. 35 pdf_text
2021 2021 Washington State Energy TABLE R402.4.1.1 (continued) AIR BARRIER, AIR SEALING AND INSULATION INSTALLATIONa COMPONENT AIR BARRIER CRITERIA INSULATION CRITERIA Windows, skylights and doors The space between window/door jambs and framing and skylights and framing shall be sealed. 28 pdf_text
2021 2021 Washington State Energy CHAPTER 5 EXISTING BUILDINGS 58 pdf_text
2021 2021 Washington State Energy TABLE R303.1.3(2) DEFAULT OPAQUE DOOR U-FACTORS Door Type No Glazed Fenestratio n Single Glazing Double Glazing with ¼ in. Airspace Double Glazing with ½ in. Airspace Dou Gla e=0. ½ in SWINGING DOORS (Rough opening – 38 in. x 82 in.) Slab Doors Wood slab in wood framea 16 pdf_text
2021 2021 Washington State Energy THERMOSTAT. An automatic control device used to maintain temperature at a fixed or adjustable set p U-FACTOR (THERMAL TRANSMITTANCE). The coefficient of heat transmission (air to air) through a buildin component or assembly, equal to the time rate of heat flow per unit area and unit temperature differe between the warm side and cold side air films (Btu/h • ft2 • °F) [W/(m2 • K)]. UNHEATED SLAB-ON-GRADE FLOOR. A slab-on-grade floor that is not a heated slab-on-grade floor. VENTILATION. The natural or mechanical process of supplying conditioned or unconditioned air to, or removing such air from, any space. VENTILATION AIR. That portion of supply air that comes from outside (outdoors) plus any recirculated ai that has been treated to maintain the desired quality of air within a designated space. VISIBLE TRANSMITTANCE [VT]. The ratio of visible light entering the space through the fenestration prod assembly to the incident visible light, visible transmittance, includes the effects of glazing material an frame and is expressed as a number between 0 and 1. WHOLE HOUSE MECHANICAL VENTILATION SYSTEM. An exhaust system, supply system, or combination thereof that is designed to mechanically exchange indoor air with outdoor air when operating continuo or through a programmed intermittent schedule to satisfy the whole house ventilation rates. ZONE. A space or group of spaces within a building with heating or cooling requirements that are sufficientl 12 pdf_text
2021 2021 Washington State Energy Code ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. 63 pdf_text
2021 2021 Washington State Energy Code TABLE R405.2 MANDATORY COMPLIANCE MEASURES FOR TOTAL BUILDING PERFORMANCE Sectiona Title Comments General R401.3 Certificate Envelope R402.1.1 Vapor retarder R402.2.3 Eave baffle R402.2.4.1 Access hatches and doors R402.4 Air leakage R402.5 Maximum fenestration U-factor Systems R403.1 Controls R403.3 Ducts Except for R403.3.2 and R403.3.3 R403.4 Mechanical system piping insulation R403.5.1 Heated water circulation and temperature maintenance system R403.5.3 Drain water heat recovery units R403.6 Mechanical ventilation R403.7 Equipment sizing and efficiency rating R403.8 Systems serving multiple dwelling units R403.9 Snow melt system controls R403.10 Energy consumption of pools and spas R403.11 Portable spas R403.12 Residential pools and permanent residential spas Electrical Power and Lighting R404.1 Lighting equipment R404.2 Interior lighting controls a. Reference to a code section includes all the relative subsections except as indicated in the table. 39 pdf_text
2021 2021 Washington State Energy Code TABLE R405.4.2(2) DEFAULT DISTRIBUTION SYSTEM EFFICIENCIES FOR PROPOSED DESIGNSa For SI: 1 cubic foot per minute = 0.47 L/s, 1 square foot = 0.093m2, 1 pound per square inch = 6895 Pa, 1 water gauge = 1250 Pa. a. Values given by this table are for distribution systems, which must still meet all prescriptive requirement duct and pipe system insulation and leakage. b. Entire system in conditioned space shall mean that no component of the distribution system, including t air-handler unit, is located outside of the conditioned space. All components must be located on the inte side of the thermal envelope (inside the insulation) and also inside of the air barrier. Refrigerant compressors and piping are allowed to be located outside. c. Zonal systems are systems where the heat source is located within each room. Systems shall be allowe have forced airflow across a coil but shall not have any ducted airflow external to the manufacturer’s air handler enclosure. Hydronic systems do not qualify. R405.5 Calculation software tools. Calculation software, where used, shall be in accordance with Sections R405.5.1 through R405.5.3. R405.5.1 Minimum capabilities. Calculation procedures used to comply with this section shall be software tools capable of calculating the annual energy consumption of all building elements that di between the standard reference design and the proposed design and shall include the following capabilities: 45 pdf_text
2021 2021 Washington State Energy TABLE R405.4.2(1) (continued) SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS BUILDING COMPONENT STANDARD REFERENCE DESIGN PROPOSED DESIG Air exchange rate Air leakage rate of 4.0 air changes per hour at a pressure of 0.2 inches w.g. (50 Pa). As proposeda. The mechanical ventilation rate shall be in addition to the air leakage rate and the same as in the proposed design, but no greater than 0.01 × CFA +7.5 × (Nbr + 1) where: CFA = conditioned floor area Nbr = number of bedrooms The mechanical ventilation system type shall be the same as in the proposed design. Energy recovery shall not be assumed for mechanical ventilation. The mechanical ventila rateb shall be in additio the air leakage rate an shall be as proposed. Mechanical ventilation None, except where mechanical ventilation is specified by the proposed design, in which case: Annual vent fan energy use: kWh/yr = (1ef) × (0.0876 x CFA + 65.7 × (Nbr + 1) where: ef = the minimum fan efficacy from Table R403.6.1 corresponding to the system type at to a flow rate of 0.01 × CFA + 7.5 × (Nbr+1) CFA = conditioned floor area Nbr = number of bedrooms As proposed Internal gains IGain = 17,900 + 23.8 × CFA + 4104 × Nbr (Btu/day per dwelling unit) Same as standard reference design Internal mass An internal mass for furniture and contents of 8 pounds per square foot of floor area. Same as standard reference design, plus 42 pdf_text
2021 2021 Washington State Energy Code EQUATION 2 — GROUP R OCCUPANCY PROPOSED UA UA = UWAW + UBGWABGW + UVGAVG + UOGAOG + UFAF + URCARC + UDAD + FSPS+ FBGSPBGS Where: UA = the combined thermal transmittance of the gross exterior wall, floor and roof/ceiling assem area. UW = the thermal transmittance of the opaque above grade wall area. AW = opaque above grade wall area. UBGW = the thermal transmittance value of the below grade opaque wall. ABGW = opaque below grade wall area. UVG = the thermal transmittance value of the fenestration glazing. AVG = fenestration glazing area, including windows in exterior doors. UOG = the thermal transmittance value of the skylight glazing. AOG = skylight glazing area. UF = the thermal transmittance of the floor. AF = floor area over unconditioned space. URC = the thermal transmittance of the ceiling. ARC = ceiling area. UD = the thermal transmittance value of the opaque door area. AD = opaque door area. FS = concrete slab on grade component F-factor. PS = lineal ft. of concrete slab on grade perimeter. FBGS = concrete below grade slab component F-factor. PBGS = lineal ft. of concrete below grade slab perimeter. NOTE: Where more than one type of wall, window, roof/ceiling, door and skylight is used, the U and A terms for those items shall be expanded into sub-elements as: UW1AW1 + UW2AW2 + UW3AW3 + ...etc. 23 pdf_text
2021 2021 Washington State Energy Code CHAPTER 1 [RE] SCOPE AND ADMINISTRATION 1 pdf_text
2021 2021 Washington State Energy e. For a proposed design without a proposed heating system, a heating system with the prevailing federal minimum efficiency shall be assumed for both the standard reference design and proposed design. f. For a proposed design home without a proposed cooling system, an electric air conditioner with the prevailing federal minimum efficiency shall be assumed for both the standard reference design and the proposed design. g. For a proposed design with a nonstorage-type water heater, a 40-gallon storage-type water heater with prevailing federal minimum energy factor for the same fuel as the predominant heating fuel type shall b assumed. For the case of a proposed design without a proposed water heater, a 40-gallon storage-type water heater with the prevailing federal minimum efficiency for the same fuel as the predominant heatin type shall be assumed for both the proposed design and standard reference design. h For residences with conditioned basements, R-2 and R-4 residences and townhouses, the following for shall be used to determine fenestration area: AF = As x FA x F Where: AF = Total fenestration area. As = Standard reference design total fenestration area. FA = (Above-grade thermal boundary gross wall area)/(above-grade boundary wall area + below-grade boundary wall area). F = (Above-grade thermal boundary wall area)/(above-grade thermal boundary wall area + common wall area) or 0.56, whichever is greater. and where: The 44 pdf_text
2021 2021 Washington State Energy INTEGRATED ENERGY EFFICIENCY RATIO (IEER). A single-number figure of merit expressing cooling part-l EER efficiency for unitary air-conditioning and heat pump equipment on the basis of weighted operati at various load capacities for the equipment. INTERMEDIATE FRAMED WALLS. Studs framed on 16-inch centers with double top plate and single botto plate. Corners use two studs or other means of fully insulating corners, and each opening is framed b two studs. Headers shall be insulated to R-10. LABELED. Equipment, materials or products to which have been affixed a label, seal, symbol or other identifying mark of a nationally recognized testing laboratory, approved agency or other organization concerned with product evaluation that maintains periodic inspection of the production of the above- labeled items and whose labeling indicates either that the equipment, material or product meets identi standards or has been tested and found suitable for a specified purpose. LISTED. Equipment, materials, products or services included in a list published by an organization acceptable to the code official and concerned with evaluation of products or services that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services an whose listing states either that the equipment, material, product or service meets identified standards has been tested and found suitable for a specified purpose. LOG STRUCTURE. A t 10 pdf_text
2021 2021 Washington State Energy Code SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS R404.1 Lighting equipment. All permanently installed lighting fixtures, excluding kitchen appliance lighting fixtures, shall contain only high-efficacy lighting sources. R404.1.1 Exterior lighting. Connected exterior lighting for residential buildings shall comply with Section C405.5. Exceptions: Solar-powered lamps not connected to any electrical service. R404.1.2 Fuel gas lighting equipment. Fuel gas lighting systems shall not have continuously burn pilot lights. R404.2 Interior lighting controls. Permanently installed interior lighting fixtures shall be controlled w either a dimmer, an occupant sensor control or other control that is installed or built into the fixture. Exception: Lighting controls shall not be required for the following: 37 pdf_text
2021 2021 Washington State Energy Code TABLE R402.4.1.1 (continued) AIR BARRIER, AIR SEALING AND INSULATION INSTALLATIONa COMPONENT AIR BARRIER CRITERIA INSULATION CRITERIA Plumbing, wiring or other obstructions All holes created by wiring, plumbing or other obstructions in the air barrier assembly shall be air sealed. Batt insulation shall be cut neatly t around wiring and plumbing in exterior walls. There shall be no v or gaps or compression where cut fit. Insulation that on installation readily conforms to available spac shall extend behind piping and wiri Insulation shall be installed to fill th available space and surround wirin plumbing, or other obstructions, unless the required R-value can b met by installing insulation and air barrier systems completely to the exterior side of the obstructions. Shower/tub on exterior wall The air barrier installed at exterior walls adjacent to showers and tubs shall separate the wall from the showers and tubs. Exterior walls adjacent to showers and tubs shall be insulated. Electrical/phone box on exterior wall The air barrier shall be installed behind electrical or communication boxes or air sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots shall be sealed to the subfloor, wall covering or ceiling penetrated by the boot. 29 pdf_text
2021 2021 Washington State Energy Code TABLE R303.1.3(4) DEFAULT U-FACTORS FOR SKYLIGHTS Frame Type Fenestration Type Aluminum Without Thermal Break Aluminum With Thermal Break Reinforced Vinyl/ Aluminum-Clad Wood or Vinyl Wood Clad Vinyl Reinf Single Glazing glass U-1.58 U-1.51 U-1.40 U- acrylic/polycarb U-1.52 U-1.45 U-1.34 U- Double Glazing air U-1.05 U-0.89 U-0.84 U- argon U-1.02 U-0.86 U-0.80 U- Double Glazing, e=0.20 air U-0.96 U-0.80 U-0.75 U- argon U-0.91 U-0.75 U-0.70 U- Double Glazing, e=0.10 air U-0.94 U-0.79 U-0.74 U- argon U-0.89 U-0.73 U-0.68 U- Double Glazing, e=0.05 air U-0.93 U-0.78 U-0.73 U- argon U-0.87 U-0.71 U-0.66 U- Triple Glazing air U-0.90 U-0.70 U-0.67 U- argon U-0.87 U-0.69 U-0.64 U- Triple Glazing, e=0.20 air U-0.86 U-0.68 U-0.63 U- argon U-0.82 U-0.63 U-0.59 U- Triple Glazing, e=0.20 on 2 surfaces air U-0.82 U-0.64 U-0.60 U- argon U-0.79 U-0.60 U-0.56 U- Triple Glazing, e=0.10 on 2 surfaces air U-0.81 U-0.62 U-0.58 U- argon U-0.77 U-0.58 U-0.54 U- Quadruple Glazing, e=0.10 on 2 surfaces air U-0.78 U-0.59 U-0.55 U- argon U-0.74 U-0.56 U-0.52 U- krypton U-0.70 U-0.52 U-0.48 U- Notes for Table R303.1.3(4) 17 pdf_text
2021 2021 Washington State Energy Code a. An alternative heating source sized at a maximum of 0.5 Watts/ft2 (equivalent) of heated floor area or 500 W whichever is bigger, may be installed in the dwelling unit. b. See Section R401.1 and residential building in Section R202 for Group R-2 scope. c. Option 3.11 can only be taken with Options 3.1 and 3.3. To qualify to claim Option 3.11 with 3.3, the system be a 1-2 speed heat pump system. Variable capacity heat pumps are ineligible from claiming this option. d. This option may only be claimed if serving System Type 4 or 5 from Table R406.2. e. Primary living areas include living, dining, kitchen, family rooms, and similar areas. f. Option 3.10 may one only be taken with Efficient Water Heating Option 5.1 or 5.2. Equipment sizing for spac heating shall be calculated as provided in Section R403.7 with increased capacity to provide a minimum of 7 percent of peak hot water demand or shall be sized in accordance with approved manufacturer’s specificatio or guidance. Supplementary heat for water heating shall be in accordance with Section R403.5.7. 55 pdf_text
2021 2021 Washington State Energy R402.2 Specific insulation requirements. In addition to the requirements of Section R402.1, insulat shall meet the specific requirements of Sections R402.2.1 through R402.2.10. R402.2.1 Ceilings with attic spaces. Where Section R402.1.3 would require R-60 in the ceiling or attic, installing R-49 over 100 percent of the ceiling area requiring insulation shall satisfy the requirement for R-60 wherever the full height of uncompressed R-49 insulation extends over the wa top plate at the eaves. This reduction shall not apply to the insulation and fenestration criteria in Se R402.1.2 and the Total UA alternative in Section R402.1.5. R402.2.1.1 Loose insulation in attic spaces. Open-blown or poured loose fill insulation may be used in attic spaces where the slope of the ceiling is not more than 3 feet in 12 and there is at lea 24 pdf_text
2021 2021 Washington State Energy Code CHAPTER 3 [RE] GENERAL REQUIREMENTS SECTION R301 CLIMATE ZONES R301.1 General. Climate zones from Table R301.1 shall be used in determining the applicable requirements from Chapter 4. TABLE R301.1 CLIMATE ZONES, MOISTURE REGIMES, AND WARM-HUMID DESIGNATIONS BY STATE AND COUNTY Key: A - Moist, B - Dry, C - Marine. Absence of moisture designation indicates moisture regime is irrelevant. WASHINGTON 13 pdf_text
2021 2021 Washington State Energy Code R103.4 Amended construction documents. Work shall be installed in accordance with the approve construction documents, and any changes made during construction that are not in compliance with t approved construction documents shall be resubmitted for approval as an amended set of constructio documents. R103.5 Retention of construction documents. One set of approved construction documents shall retained by the code official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws. 3 pdf_text
2021 2021 Washington State Energy Code TABLE R405.4.2(1) (continued) SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS BUILDING COMPONENT STANDARD REFERENCE DESIGN PROPOSED DESIG Service water heatingd,e,f, g The standard reference design shall be a heat pump water heater meeting the efficiency standards of Table C404.2 of chapter 51-11C WAC. As proposed Use, in units of gal/day – 25 + (8.5 x Nbr) Where Nbr = number of bedrooms Use, in units of gal/day 43 pdf_text
2021 2021 Washington State Energy SECTION R103 CONSTRUCTION DOCUMENTS R103.1 General. Construction documents, technical reports, and other supporting data shall be subm in one or more sets, or in a digital format where allowed by the code official, with each application for permit. The construction documents and technical reports shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed Where special conditions exist, the code official is authorized to require necessary construction documents to be prepared by a registered design professional. Exception: The code official is authorized to waive the requirements for construction documents or other supporting data if the code official determines they are not necessary to confirm compliance this code. R103.2 Information on construction documents. Construction documents shall be drawn to scale suitable material. Electronic media documents are permitted to be submitted when approved by the c official. Construction documents shall be of sufficient clarity to indicate the location, nature and extent the work proposed, and show in sufficient detail pertinent data and features of the building, systems a equipment as herein governed. Details shall include, but are not limited to, the following as applicable 2 pdf_text
2021 2021 Washington State Energy R403.9 Snow melt system controls. Snow and ice-melting systems, supplied through energy servic the building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F, and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F. R403.10 Energy consumption of pools and spas. The energy consumption of pools and permanen spas shall be controlled by the requirements in Sections R403.10.1 through R403.10.4.2. R403.10.1 Heaters. The electric power to heaters shall be controlled by an on-off switch that is an integral part of the heater mounted on the exterior of the heater in a location with ready access, or external to and within 3 feet (914 mm) of the heater. Operation of such switch shall not change the settings of the heater thermostat. Such switches shall be in addition to a circuit breaker for the pow the heater. R403.10.2 Time switches. Time switches or other control method that can automatically turn off an on heaters and pump motors according to a preset schedule shall be installed for heaters and pum motors. Heaters and pump motors that have built in time switches shall be deemed in compliance this requirement. Exceptions: 36 pdf_text
2021 2021 Washington State Energy Code those following. In the case of conflict between the duct sealing and insulation requirements of this co and the duct insulation requirements of Sections 603 and 604 of the International Mechanical Code, t duct insulation requirements of this code shall govern. SECTION R109 STOP WORK ORDER R109.1 Authority. Whenever the code official finds any work regulated by this code being performed manner contrary to the provisions of this code or in a dangerous or unsafe manner, the code official i authorized to issue a stop work order. R109.2 Issuance. The stop work order shall be in writing and shall be given to the owner of the prop involved, the owner's authorized agent, or the person performing the work. Upon issuance of a stop w order, the cited work shall immediately cease. The stop work order shall state the reason for the orde and the conditions under which the cited work is authorized to resume. R109.3 Emergencies. Where an emergency exists, the code official shall not be required to give a written notice prior to stopping the work. R109.4 Failure to comply. Any person who shall continue any work after having been served with a work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject fines established by the authority having jurisdiction. 5 pdf_text
2021 2021 Washington State Energy R402.3.5 Combustion air openings. Where open combustion air ducts provide combustion air to combustion, space conditioning fuel burning appliances, the appliances and combustion air openin shall be located outside of the building thermal envelope, or enclosed in a room isolated from insid thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.3, where the walls, floors and ceilings shall meet the minimum of the below-grade wall R-value requirements. The door into the room shall be fully gasketed and any wat lines and ducts in the room insulated in accordance with Section R403. The combustion air duct sh be insulated where it passes through conditioned space to a minimum of R-8. Exceptions: 26 pdf_text
2021 2021 Washington State Energy SECTION R407 CERTIFIED PASSIVE HOUSE R407.1 General. Projects shall comply with Section R407.2 or R407.3. R407.2 Passive House Institute U.S. (PHIUS). Projects shall comply with PHIUS+ 2018 Passive Building Standard, including its USDOE Energy Star and Zero Energy Ready Home co-requisites, an performance calculations by PHIUS-approved software. Projects shall also comply with the provision Table R405.2. R407.2.1 PHIUS documentation. Prior to the issuance of a building permit, the following items mu provided to the code official: 56 pdf_text
2021 2021 Washington State Energy SECTION R503 ALTERATIONS R503.1 General. Alterations to any building or structure shall comply with the requirements of the cod for new construction, without requiring the unaltered portions of the existing building or building syste comply with this code. Alterations shall be such that the existing building or structure is no less conforming to the provisions of this code than the existing building or structure was prior to the alterat Alterations shall not create an unsafe or hazardous condition or overload existing building systems. Alterations shall be such that the existing building or structure uses no more energy than the existing building or structure prior to the alteration. Alterations to existing buildings shall comply with Section R503.1.1 through R503.1.4. The code official may approve designs of alterations which do not fully conform to all of the requirements of this code where in the opinion of the code official full compliance is physically imposs and/or economically impractical and: 60 pdf_text
2021 2021 Washington State Energy Code NEEP Northeast Energy Efficiency Partnership, Inc. 65 pdf_text
2021 2021 Washington State Energy HVI Home Ventilating Institute 64 pdf_text
2021 2021 Washington State Energy TABLE R303.1.3(5) SMALL BUSINESS COMPLIANCE TABLE DEFAULT U-FACTORS FOR VERTICAL FENESTRATION a. Low-eA (emissivity) shall be 0.24 to 0.16. Low-eB (emissivity) shall be 0.15 to 0.08. Low-eC (emissivity) shall be 0.07 or less. b. Aluminum Thermal Break = An aluminum thermal break framed window shall incorporate the foll minimum design characteristics: 18 pdf_text
2021 2021 Washington State Energy Code REROOFING. The process of recovering or replacing an existing roof covering. See “Roof recover” and “Roof replacement.” RESIDENTIAL BUILDING. For this code, the following building types are residential buildings: 11 pdf_text
2021 2021 Washington State Energy R405.3.2.2 Compliance report for certificate of occupancy. A compliance report submitted for obtaining the certificate of occupancy shall include all of the following: 40 pdf_text
2021 2021 Washington State Energy Exception: Systems serving multiple dwelling units shall be inspected in accordance with Sectio R105.2.4. R105.2.5 Final inspection. The building shall have a final inspection and not be occupied until approved. R105.3 Reinspection. A building shall be reinspected when determined necessary by the code offici R105.4 Approved inspection agencies. The code official is authorized to accept reports of third-par inspection agencies not affiliated with the building design or construction, provided such agencies are approved as to qualifications and reliability relevant to the building components and systems they are inspecting. R105.5 Inspection requests. It shall be the duty of the holder of the permit or their duly authorized a to notify the code official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. R105.6 Reinspection and testing. Where any work or installation does not pass an initial test or inspection, the necessary corrections shall be made so as to achieve compliance with this code. The work or installation shall then be resubmitted to the code official for inspection and testing. 4 pdf_text
2021 2021 Washington State Energy Code certified by the manufacturer. Products lacking such a labeled SHGC or VT shall be assigned a def SHGC or VT from Table R303.1.3(3). Exceptions: 15 pdf_text
2021 2021 Washington State Energy Code R403.1.2 Heat pump supplementary heat. Unitary air cooled heat pumps shall include controls th minimize supplemental heat usage during start-up, set-up, and defrost conditions. These controls s anticipate need for heat and use compression heating as the first stage of heat. Controls shall indic when supplemental heating is being used through visual means (e.g., LED indicators). Heat pumps equipped with supplementary heaters shall be installed with controls that prevent supplemental hea operation above 40°F. At final inspection the auxiliary heat lock out control shall be set to 35°F or le R403.1.3 Continuously burning pilot lights. The natural gas systems and equipment listed bel are not permitted to be equipped with continuously burning pilot lights. 31 pdf_text
2021 2021 Washington State Energy Code CHAPTER 2 [RE] DEFINITIONS SECTION R201 GENERAL R201.1 Scope. Unless stated otherwise, the following words and terms in this code shall have the meanings indicated in this chapter. R201.2 Interchangeability. Words used in the present tense include the future; words in the masculi gender include the feminine and neuter; the singular number includes the plural and the plural include the singular. R201.3 Terms defined in other codes. Terms that are not defined in this code but are defined in the International Building Code, International Fire Code, International Fuel Gas Code, International Mechanical Code, Uniform Plumbing Code or the International Residential Code shall have the mean ascribed to them in those codes. R201.4 Terms not defined. Terms not defined by this chapter shall have ordinarily accepted meanin such as the context implies. 7 pdf_text
2021 2021 Washington State Energy CHAPTER 6 REFERENCED STANDARDS This chapter lists the standards that are referenced in various sections of this document. The standar are listed herein by the promulgating agency of the standard, the standard identification, the effective and title, and the section or sections of this document that reference the standard. The application of t referenced standards shall be as specified in Section R106. AAMA American Architectural Manufacturers Association 62 pdf_text
2021 2021 Washington State Energy R402.4.2 Air leakage of fenestration. Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot (1.5 L/s/m2), and swinging doors no more th 30 pdf_text
2021 2021 Washington State Energy SECTION R402 BUILDING THERMAL ENVELOPE R402.1 General. The building thermal envelope shall meet the requirements of Sections R402.1.1 through R402.1.6. Exception: The following buildings, or portions thereof, separated from the remainder of the buildin building thermal envelope assemblies complying with this code shall be exempt from the building thermal envelope provisions of this code: 20 pdf_text
2021 2021 Washington State Energy SECTION R406 ADDITIONAL ENERGY EFFICIENCY REQUIREMENTS R406.1 Scope. This section establishes additional energy efficiency requirements for all new constru covered by this code, including additions subject to Section R502 and change of occupancy or use subject to Section R505 unless specifically exempted in Section R406. Credit from both Sections R40 and R406.3 are required. R406.2 Carbon emission equalization. This section establishes a base equalization between fuels to define the equivalent carbon emissions of the options specified. The permit shall define the base fu selection to be used and the points specified in Table R406.2 shall be used to modify the requirement Section R406.3. TABLE R406.2 ENERGY EQUALIZATION CREDITS a. See Section R401.1 and residential building in Section R202 for Group R-2 scope. b. The gas back-up furnace will operate as fan-only when the heat pump is operating. T heat pump shall operate at all temperatures above 38°F (3.3°C) (or lower). Below tha “changeover” temperature, the heat pump would not operate to provide space heatin The gas furnace provides heating below 38°F (3.3°C) (or lower). c. Additional points for the HVAC system are included in Table R406.3. 46 pdf_text
2021 2021 Washington State Energy SECTION R302 DESIGN CONDITIONS R302.1 Interior design conditions. The interior design temperatures used for heating and cooling lo calculations shall be a maximum of 72°F (22°C) for heating and minimum of 75°F (24°C) for cooling. R302.2 Exterior design conditions. The heating or cooling outdoor design temperatures shall be selected from Appendix RC. 14 pdf_text
2021 2021 Washington State Energy TABLE R406.3 (continued) ENERGY CREDITS OPTION DESCRIPTION CREDIT(S) All Other Group R 48 pdf_text
2021 2021 Washington State Energy Code R406.3 Additional energy efficiency requirements. Each dwelling unit in a residential building shal comply with sufficient options from Tables R406.2 and R406.3 so as to achieve the following minimu number of credits: 47 pdf_text
2021 2021 Washington State Energy 6 pdf_text
2021 2021 Washington State Energy Code 9 pdf_text
2021 2021 Washington State Energy R402.1.5 Total UA alternative. If the proposed building thermal envelope UA is less than or equal the target UA, the building shall be considered in compliance with Table R402.1.2. The proposed U shall be calculated in accordance with Equation 2. The target UA shall be calculated in accordance Equation 1. U-factors shall be determined as specified in Section R402.1.6. In addition to UA compliance, the maximum fenestration U-factors of Section R402.5 shall be met. R402.1.6 U-factor reference and calculations. The U-factors for typical construction assemblies included in Appendix A in chapter 51-11C WAC. These values shall be used for all calculations. W proposed construction assemblies are not represented in Appendix A, values shall be calculated in accordance with the ASHRAE Handbook of Fundamentals using the framing factors listed in Appen A where applicable and shall include the thermal bridging effects of framing materials. The SHGC requirements shall be met in addition to UA compliance. Fenestration U-factors shall comply with Section R303.1.3, Fenestration product rating. EQUATION 1 — GROUP R OCCUPANCY TARGET UA UAT = UWAW + UBGWABGW + UVGAVG + UOGAOG + UFAF + URCARC +UDAD + FSPS+ FBGSPBGS Where: UAT = the target combined thermal transmittance of the gross exterior wall, floor and roof/ceiling UW = the thermal transmittance value of the opaque above grade wall found in Table R402.1.2. 22 pdf_text
2021 2021 Washington State Energy maintenance systems shall be considered to be sources of heated water. The volume in the piping be determined from Table C404.3.1 in the Washington State Energy Code, Commercial Provisions Table L502.7 of the Uniform Plumbing Code. The volume contained within fixture shutoff valves, wit flexible water supply connectors to a fixture fitting and within a fixture fitting shall not be included in water volume determination. Where heated water is supplied by a recirculating system or heat-trac piping, the volume shall include the portion of the fitting on the branch pipe that supplies water to th fixture. R403.5.3 Hot water pipe insulation. Insulation for service hot water pipe, both within and outside t conditioned space, shall have a minimum thermal resistance (R-value) of R-3. Exception: Pipe insulation is permitted to be discontinuous where it passes through studs, joists other structural members and where the insulated pipes pass other piping, conduit or vents, provi the insulation is installed tight to each obstruction. R403.5.4 Drain water heat recovery units. Drain water heat recovery units shall comply with CSA 34 pdf_text
2021 2021 Washington State Energy BELOW-GRADE WALL. That portion of a wall in the building envelope that is entirely below the finish gra and in contact with the ground. BUILDING. Any structure used or intended for supporting or sheltering any use or occupancy, including mechanical systems, service water heating systems and electric power and lighting systems located the building site and supporting the building. BUILDING SITE. A contiguous area of land that is under the ownership or control of one entity. BUILDING THERMAL ENVELOPE. The below-grade walls, above-grade walls, floors, ceiling, roofs, and an other building element assemblies that enclose conditioned space or provide a boundary between conditioned space and exempt or unconditioned space. C-FACTOR (THERMAL CONDUCTANCE). The coefficient of heat transmission (surface to surface) through building component or assembly, equal to the time rate of heat flow per unit area and the unit temper difference between the warm side and cold side surfaces (Btu/h ft2 × °F) [W/(m2 × K)]. CAVITY INSULATION. Insulating material located between framing members. CIRCULATING HOT WATER SYSTEM. A specifically designed water distribution system where one or more pumps are operated in the service hot water piping to circulate heated water from the water-heating equipment to the fixture supply and back to the water-heating equipment. CLIMATE ZONE. A geographical region based on climatic criteria as specified in this code. CODE OFFICIAL 8 pdf_text
2021 2021 Washington State Energy Code TABLE R406.3 (continued) ENERGY CREDITS OPTION DESCRIPTION CREDIT(S) All Other Group R 49 pdf_text
2021 2021 Washington State Energy SECTION R405 TOTAL BUILDING PERFORMANCE R405.1 Scope. This section establishes criteria for compliance using total building performance analy Such analysis shall include heating, cooling, mechanical ventilation and service water-heating energy only. R405.2 Performance-based compliance. Compliance based on total building performance requires a proposed design meet all of the following: 38 pdf_text
2021 2021 Washington State Energy APPENDIX RC EXTERIOR DESIGN CONDITIONS As required by Sections C302.2 and R302.2, the heating or cooling outdoor design temperatures shall be selected Table C-1. TABLE C-1 OUTDOOR DESIGN TEMPERATURES 70 pdf_text
2021 2021 Washington State Energy Code R503.1.4 Lighting. New lighting systems that are part of the alteration shall comply with Section R404.1. Exception: Alterations that replace less than 10 percent of the luminaires in a space, provided th such alterations do not increase the installed interior lighting power. SECTION R504 REPAIRS R504.1 General. Buildings, structures and parts thereof shall be repaired in compliance with Section R501.3 and this section. Work on nondamaged components that is necessary for the required repair damaged components shall be considered part of the repair and shall not be subject to the requireme for alterations in this chapter. Routine maintenance required by Section R501.3, ordinary repairs exe from permit, and abatement of wear due to normal service conditions shall not be subject to the requirements for repairs in this section. The code official may approve designs of repairs which do not fully conform with all of the requireme of this code where in the opinion of the code official full compliance is physically impossible and/or economically impractical and: 61 pdf_text
2021 2021 Washington State Energy Code CHAPTER 4 [RE] RESIDENTIAL ENERGY EFFICIENCY SECTION R401 GENERAL R401.1 Scope. This chapter applies to residential buildings. Group R-2 occupancy areas with dwellin units accessed from enclosed interior corridors or other enclosed interior spaces must comply with th Washington State Energy Code (WSEC), Commercial Provisions. Other Group R-2 occupancy areas permitted to comply with the WSEC, Commercial Provisions, in lieu of the WSEC, Residential Provisi Exception: Water heaters that each serve only an individual Group R-2 dwelling unit in a building t stories or less above grade plane are permitted to comply with the requirements of the WSEC, Residential Provisions. R401.2 Compliance. Projects shall comply with one of the following: 19 pdf_text
2021 (cont. 2) SECTION R303 MATERIALS, SYSTEMS AND EQUIPMENT R303.1 Identification. Materials, systems and equipment shall be identified in a manner that will allo determination of compliance with the applicable provisions of this code. R303.1.1 Building thermal envelope insulation. An R-value identification mark shall be applied b the manufacturer to each piece of building thermal envelope insulation 12 inches (305 mm) or great width. Alternately, the insulation installers shall provide a certification listing the type, manufacturer R-value of insulation installed in each element of the building thermal envelope. For blown or spray insulation (fiberglass and cellulose), the initial installed thickness, settled thickness, settled R-value, installed density, coverage area and number of bags installed shall be listed on the certification. Fo sprayed polyurethane foam (SPF) insulation, the installed thickness of the areas covered and R-val of installed thickness shall be listed on the certification. For insulated siding, the R-value shall be labeled on the product’s package and shall be listed on the certification. The insulation installer shal sign, date and post the certification in a conspicuous location on the job site. Exception: For roof insulation installed above the deck, the R-value shall be labeled as required the material standards specified in Table 1508.2 of the International Building Code or Table R906 the International Residential Code. R303.1.1.1 Blown or sprayed roof/c 14 pdf_text
2021 (cont. 2) ype of construction whose primary structural elements are formed by a system of l LOG WALL. An assembly of individual structural logs for use as an exterior or interior load bearing wall, shear wall or nonload bearing wall. LOW-VOLTAGE LIGHTING. A lighting system consisting of an isolating power supply, the low voltage luminaires, and associated equipment that are all identified for the use. The output circuits of the pow supply operate at 30 volts (42.4 volts peak) or less under all load conditions. MANUAL. Capable of being operated by personal intervention (see "Automatic"). OCCUPANT SENSOR CONTROL. An automatic control device that detects the presence or absence of pe within an area and causes lighting, equipment or appliances to be regulated accordingly. ON-SITE RENEWABLE ENERGY. Energy from renewable energy resources harvested at the building site. OPAQUE DOOR. A door that is not less than 50 percent opaque in surface area. PILOT LIGHT, CONTINUOUSLY BURNING. A small gas flame used to ignite gas at a larger burning. Once lit continuously burning pilot light remains in operation until manually interrupted. Pilot light ignition syste with the ability to switch between intermittent and continuous mode are considered continuous. PILOT LIGHT, INTERMITTENT. A pilot which is automatically ignited when an appliance is called on to ope and which remains continuously ignited during each period of main burner operation. The pilot is automatically extinguished when each main 10 pdf_text
2021 (cont. 2) . The officer or other designated authority charged with the administration and enforce of this code, or a duly authorized representative. COMMERCIAL BUILDING. For this code, all buildings that are not included in the definition of "Residential buildings." CONDITIONED FLOOR AREA. The horizontal projection of the floors associated with the conditioned spac CONDITIONED SPACE. An area, room or space that is enclosed within the building thermal envelope and that is directly or indirectly heated or cooled. Spaces are indirectly heated or cooled where they communicate through openings with conditioned spaces, where they are separated from conditioned spaces by uninsulated walls, floors or ceilings, or where they contain uninsulated ducts, piping or oth sources of heating or cooling. CONNECTED THERMOSTAT. An internet enabled device that automatically adjusts heating and cooling temperature settings. CONTINUOUS AIR BARRIER. A combination of materials and assemblies that restrict or prevent the pass of air through the building thermal envelope. CONTINUOUS INSULATION (c.i.). Insulating material that is continuous across all structural members wit thermal bridges other than fasteners and service openings. It is installed on the interior or exterior or i integral to any opaque surface of the building envelope. CURTAIN WALL. Fenestration products used to create an external nonload-bearing wall that is designe separate the exterior and interior environments. DEMAND RECIRCULATION 8 pdf_text
2021 (cont. 2) SECTION R101 SCOPE AND GENERAL REQUIREMENTS R101.1 Title. This code shall be known as the Washington State Energy Code-Residential, and shall cited as such. It is referred to herein as "this code." The 2021 edition of the Washington State Energy Code is hereby adopted. The Washington State Energy Code adopted under chapter 51-11R WAC shall become effective in all counties and cities of state on March 15, 2024 R101.2 Scope. This code applies to residential buildings and the buildings sites and associated syste and equipment. This code shall be the maximum and minimum energy code for residential constructi each town, city and county. Residential sleeping units, Group I-1, Condition 2 assisted living facilities licensed by Washington state under chapter 388-78A WAC and Group I-1, Condition 2 residential treatment facilities licensed by Washington state under chapter 246-337 WAC shall utilize the comme building sections of the energy code regardless of the number of stories of height above grade plane. R101.3 Intent. This code shall regulate the design and construction of buildings for the effective use conservation of energy over the useful life of each building. This code is intended to provide flexibility permit the use of innovative approaches and techniques to achieve this objective. This code is not intended to abridge safety, health or environmental requirements contained in other applicable codes ordinances. R101.4 Applicability. Where, in any specific case, 1 pdf_text
2021 (cont. 2) Rim Joists Rim joists shall include an exterior air barrierb. The junctions of the rim board to the sill plate and the rimboard and the subfloor shall be air sealed. Rim joists shall be insulated so tha the insulation maintains permanen contact with the exterior rim board Floors (including above garage and cantilevered floors) The air barrier shall be installed at any exposed edge of insulation. Floor framing cavity insulation shal be installed to maintain permanent contact with the underside of subfl decking or floor framing cavity insulation shall be permitted to be contact with the topside of sheathi or continuous insulation installed o the underside of floor framing and extend from the bottom to the top all perimeter floor framing member Basement, crawl space and slab foundations Exposed earth in unvented crawl spaces shall be covered with a Class I, black vapor retarder with overlapping joints taped. Penetrations through concrete foundation walls and slabs shall be air sealed. Class I vapor retarders shall not be used as an air barrier on below-grade walls and shall be installed in accordance with Section R702.7 of the International Residential Code. Crawl space insulation, where provided instead of floor insulation shall be installed in accordance wi Section R402.2.10. Conditioned basement foundation wall insulation shall be installed in accordance with Section R402.2.8 Slab on grade floor insulation shall installed in accordance with Sec 28 pdf_text
2021 (cont. 2) NOTE: Below Grade Walls: The wall is assumed to extend from the slab upward to the top of the mud sill for the distance specified in Table A104.1, with 6 inches of concrete wall extending above grade. This will be calculated separately from above grade walls using the wall height that best describes the system. 23 pdf_text
2021 (cont. 2) additional mass specifically designed a thermal storage eleme but not integral to the building envelope or structure. Structural mass For masonry floor slabs, 80% of floor area covered by R-2 carpet and pad, and 20% of floor directly exposed to room air. As proposed For masonry basement walls, as proposed, but with insulation required by Table R402.1.2 located on the interior side of the walls. As proposed For other walls, for ceilings, floors, and interior walls, wood frame construction. As proposed Heating systemsd, e The standard reference design shall be an air source heat pump meeting the requirements of Section C403 of the WSEC—Commercial Provisions. Capacity: Sized in accordance with Section R403.7 As proposed Cooling systemsd, f Same system type as proposed. Same system efficiency as required by prevailing minimum federal standard. Capacity: Sized in accordance with Section R403.6. As proposed 42 pdf_text
2021 (cont. 2) Concealed sprinklers When required to be sealed, concealed fire sprinklers shall only be sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover plates and walls or ceilings. IC = insulation contact a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. b. Air barrier and insulation full enclosure is not required in unconditioned/ventilated attic spaces. 29 pdf_text
2021 (cont. 2) rmal boundary wall is any wall that separates conditioned space from unconditioned space ambient conditions. Above-grade thermal boundary wall is any thermal boundary wall component not in contact wit Below-grade boundary wall is any thermal boundary wall in soil contact. Common wall area is the area of walls shared with an adjoining dwelling unit. L and CFA are in the same units. i. The factor for the compactness of the hot water distribution system is the ratio of the area of the rectang that bounds the source of hot water and the fixtures that it serves (the “hot water rectangle”) divided by t floor area of the dwelling. 44 pdf_text
2021 (cont. 2) AW = opaque above grade wall area. UBGW = the thermal transmittance value of the below grade opaque wall found in Table R402.1.2. ABGW = opaque below grade wall area. UVG = the thermal transmittance value of the fenestration found in Table R402.1.2. AVG = (a) The proposed glazing area; where proposed fenestration glazing area is less than 15 the conditioned floor area, minus AOG. (b) 15% of the conditioned floor area; where the proposed fenestration glazing area is 15 more of the conditioned floor area, minus AOG. UOG = the thermal transmittance value of the skylight glazing found in Table R402.1.2. AOG = skylight glazing area (if the proposed AOG exceeds 15 percent, the target AOG shall be 1 percent of the total floor area of the conditioned space). UF = the thermal transmittance value of the floor found in Table R402.1.2. AF = floor area over unconditioned space. URC = the thermal transmittance value of the ceiling found in Table R402.1.2. ARC = roof/ceiling area. UD = the thermal transmittance value of the fenestration found in Table R402.1.2. AD = opaque door area. FS = concrete slab on grade component F-factor found in Table R402.1.2. PS = lineal ft. of concrete slab on grade perimeter. FBGS = concrete below grade slab component F-factor found in Table R402.1.2. PBGS = lineal ft. of concrete below grade slab perimeter. 22 pdf_text
2021 (cont. 2) SECTION R106 NOTICE OF APPROVAL R106.1 Approval. After the prescribed tests and inspections indicate that the work complies in all respects with this code, a notice of approval shall be issued by the code official. R106.2 Revocation. The code official is authorized to, in writing, suspend or revoke a notice of appro issued under the provisions of this code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure, premise, or port thereof is in violation of any ordinance or regulation or any of the provisions of this code. SECTION R107 VALIDITY R107.1 General. If a portion of this code is held to be illegal or void, such a decision shall not affect t validity of the remainder of this code. 4 pdf_text
2021 (cont. 2) SECTION R202 GENERAL DEFINITIONS ABOVE-GRADE WALL. A wall enclosing conditioned space that is not a below-grade wall. This includes between-floor spandrels, peripheral edges of floors, roof and basement knee walls, dormer walls, gab end walls, walls enclosing a mansard roof and skylight shafts. ACCESS (TO). That which enables a device, appliance or equipment to be reached by ready access or means that first requires the removal or movement of a panel or similar obstruction. ADDITION. An extension or increase in the conditioned space floor area, number of stories, or height of building or structure. ADVANCED FRAMED WALLS. Studs framed on 24-inch centers with double top plate and single bottom p Corners use two studs or other means of fully insulating corners, and one stud is used to support eac header. Headers consist of double 2x material with R-10 insulation between the header and exterior sheathing. Interior partition wall/exterior wall intersections are fully insulated in the exterior wall. (See Standard Framing and Appendix CA, of chapter 51-11C WAC.) AIR BARRIER. One or more materials joined together in a continuous manner to restrict or prevent the passage of air through the building thermal envelope and its assemblies. ALTERATION. Any construction, retrofit or renovation to an existing structure other than repair or additio Also, a change in a building, electrical, gas, mechanical or plumbing system that involves an extensio addition or change to the arrang 7 pdf_text
2021 (cont. 2) TABLE R405.4.2(1) SPECIFICATIONS FOR THE STANDARD REFERENCE AND PROPOSED DESIGNS BUILDING COMPONENT STANDARD REFERENCE DESIGN PROPOSED DESIG Above-grade walls Type: Mass wall if proposed wall is mass; otherwise wood frame. As proposed Gross area: Same as proposed As proposed U-factor: From Table R402.1.2 As proposed Solar absorptance = 0.75 As proposed Emittance = 0.90 As proposed Below-grade walls Type: Same as proposed As proposed Gross area: Same as proposed As proposed U-factor: From Table R402.1.2, with insulation layer on interior side of walls. As proposed Above-grade floors Type: Wood frame As proposed Gross area: Same as proposed As proposed U-factor: From Table R402.1.2 As proposed Ceilings Type: Wood frame As proposed Gross area: Same as proposed As proposed U-factor: From Table R402.1.2 As proposed Roofs Type: Composition shingle on wood sheathing As proposed Gross area: Same as proposed As proposed Solar absorptance = 0.75 As proposed Emittance = 0.90 As proposed Attics Type: Vented with aperture = 1 ft2 per 300 ft2 ceiling area As proposed Foundations Type: Same as proposed foundation wall area above and below-grade As proposed Soil characteristics: Same as proposed. As proposed Opaque Doors Area: 40 ft2 As proposed Orientation: North As proposed U-factor: Same as fenestration from Table R402.1.2. As proposed Vertical fenestration other than opaque doorsa Total ar 41 pdf_text
2021 (cont. 2) R403.6.2 Testing. Mechanical ventilation systems shall be tested and verified to provide the minim ventilation flow rates required by Section R403.6. Testing shall be performed according to the ventilation equipment manufacturer's instructions, or by using a flow hood or box, flow grid, or other airflow measuring device at the mechanical ventilation fan's inlet terminals or grilles, outlet terminal grilles, or in the connected ventilation ducts. Where required by the code official, testing shall be conducted by an approved third party. A written report of the results of the test shall be signed by th party conducting the test and provided to the code official. Exception: Kitchen range hoods that are ducted to the outside with 6-inch (152 mm) or larger du and not more than one 90-degree (1.57 rad) elbow or equivalent in the duct run R403.7 Equipment sizing and efficiency rating. Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on building loads calculated in accordance with ACCA Manu or other approved heating and cooling calculation methodologies. The output capacity of heating and cooling equipment shall not be greater than that of the smallest available equipment size that exceed loads calculated, including allowable oversizing limits. Equipment shall meet the minimum federal efficiency standards as referenced in Tables C403.3.2(1), C403.3.2(2), C403.3.2(3), C403.3.2(4), C403.3.2(5), C403.3.2(6), C403.3.2(7), C403.3.2(8) and C403.3. 35 pdf_text
2021 (cont. 2) SECTION R110 MEANS OF APPEALS R110.1 General. In order to hear and decide appeals of orders, decisions or determinations made by code official relative to the application and interpretation of this code, there shall be and is hereby cre a board of appeals. The board of appeals shall be appointed by the applicable governing authority an shall hold office at its pleasure. The board shall adopt rules of procedure for conducting its business, shall render all decisions and findings in writing to the appellant with a duplicate copy to the code offic R110.2 Limitations on authority. An application for appeal shall be based on a claim that the true in of this code or the rules legally adopted thereunder have been incorrectly interpreted, the provisions this code do not fully apply or an equivalent or better form of construction is proposed. The board sha have no authority to waive requirements of this code or interpret the administration of this code. R110.3 Qualifications. The board of appeals shall consist of members who are qualified by experien and training and are not employees of the jurisdiction. R110.4 Administration. The code official shall take immediate action in accordance with the decision the board. 5 pdf_text
2021 (cont. 2) SECTION R501 GENERAL R501.1 Scope. The provisions of this chapter shall control the alteration, repair, addition and change occupancy of existing buildings and structures. R501.1.1 General. Except as specified in this chapter, this code shall not be used to require the remo alteration or abandonment of, nor prevent the continued use and maintenance of, an existing building building system lawfully in existence at the time of adoption of this code. Unaltered portions of the exi building or building supply system shall not be required to comply with this code. R501.1.2 Thermostats for accessory dwelling units. Where a separate dwelling unit, that provid independent facilities for living, sleeping, cooking, bathing and sanitation, is established within or attached to an existing dwelling unit, the heating and cooling for the newly-created dwelling unit sha controllable with a separate programmable thermostat in accordance with Section R403.1.1. R501.2 Compliance. Additions, alterations, repairs or changes of occupancy to, or relocation of, an existing building, building system or portion thereof shall comply with Sections R502, R503, R504 or R505, respectively, in this code. Changes where unconditioned space is changed to conditioned spac shall comply with Section R502. R501.3 Maintenance. Buildings and structures, and parts thereof, shall be maintained in a safe and sanitary condition. Devices and systems that are required by this code shall be maintained in conf 58 pdf_text
2021 (cont. 2) R402.1.3 R-value alternative. Assemblies with R-value of insulation materials equal to or greater t that specified in Table R402.1.3 shall be an alternative to the U-factor in Table R402.1.2. R402.1.4 R-value computation. Cavity insulation alone shall be used to determine compliance wit cavity insulation R-value requirements in Table R402.1.3. Where cavity insulation is installed in multiple layers, the R-values of the cavity insulation layers shall be summed to determine complian with the cavity insulation R-value requirements. The manufacturer's settled R-value shall be used f blown-in insulation. Continuous insulation (ci) alone shall be used to determine compliance with the continuous insulation R-value requirements in Table R402.1.3. Where continuous insulation is insta in multiple layers, the R-values of the continuous insulation layers shall be summed to determine compliance with the continuous insulation R-value requirements. Cavity insulation R-values shall n used to determine compliance with the continuous insulation R-value requirements in Table R402.1 Computed R-values shall not include an R-value for other building materials or air films. Where insulated siding is used for the purpose of complying with the continuous insulation requirements of Table R402.1.3, the manufacturer’s labeled R-value for insulated siding shall be reduced by R-0.6. TABLE R402.1.3 INSULATION MINIMUM R-VALUES AND FENESTRATION REQUIREMENTS BY COMPONENT a. R-values are minimums. U-fa 21 pdf_text
2021 (cont. 2) SECTION R104 FEES R104.1 Fees. A permit shall not be issued until the fees prescribed in Section R104.2 have been paid nor shall an amendment to a permit be released until the additional fee, if any, has been paid. R104.2 Schedule of permit fees. A fee for each permit shall be paid as required, in accordance with schedule as established by the applicable governing authority. R104.3 Work commencing before permit issuance. Any person who commences any work before obtaining the necessary permits shall be subject to an additional fee established by the code official, which shall be in addition to the required permit fees. R104.4 Related fees. The payment of the fee for the construction, alteration, removal or demolition o work done in connection to or concurrently with the work or activity authorized by a permit shall not relieve the applicant or holder of the permit from the payment of other fees that are prescribed by law. R104.5 Refunds. The code official is authorized to establish a refund policy. 3 pdf_text
2021 (cont. 2) y similar so that desired conditions can be maintained throughout using a single controlling device. 12 pdf_text
2021 (cont. 2) SECTION R502 ADDITIONS R502.1 General. Additions to an existing building, building system or portion thereof shall conform to provisions of this code as those provisions relate to new construction without requiring the unaltered portion of the existing building or building system to comply with this code, except as specified in this chapter. Additions shall not create an unsafe or hazardous condition or overload existing building systems. An addition shall be deemed to comply with this code where the addition alone complies, w the existing building and addition comply with this code as a single building, or where the building wit addition uses no more energy than the existing building. Additions shall be in accordance with Sectio R502.3 or R502.4. R502.1.1 Small additions. Additions not greater than 150 square feet (13.9 m2) shall not be requir comply with Section R406. R502.2 Change in space conditioning. Any nonconditioned or low-energy space that is altered to become conditioned space shall be required to be brought into full compliance with this code. Exception: Where the total building performance option in Section R405 is used to comply with thi section, the annual energy use of the proposed design is permitted to be 110 percent of the annual energy use otherwise allowed by Section R405.3. R502.3 Prescriptive compliance. Additions shall comply with Sections R502.3.1 through R502.3.4. R502.3.1 Building envelope. New building envelope assemblies that are 59 pdf_text
2021 (cont. 2) DUCTLESS MINI-SPLIT HEAT PUMP SYSTEM. A heating and cooling system that is comprised of one or mul indoor evaporator/air-handling units and an outdoor condensing unit that is connected by refrigerant piping and electrical wiring. A ductless mini-split system is capable of cooling or heating one or more rooms without the use of a central ductwork system. DWELLING UNIT. A single unit providing complete independent living facilities for one or more persons, including permanent provisions for living, sleeping, eating, cooking and sanitation. DWELLING UNIT ENCLOSURE AREA. The sum of the area of ceiling, floors and walls separating a dwellin unit’s conditioned space from the exterior or from adjacent conditioned or unconditioned spaces. Wall height shall be measured from the finished floor of the dwelling unit to the underside of the floor abov ENERGY ANALYSIS. A method for estimating the annual energy use of the proposed design and standa reference design based on estimates of energy use. ENERGY COST. The total estimated annual cost for purchased energy for the building functions regulat by this code, including applicable demand charges. ENERGY SIMULATION TOOL. An approved software program or calculation-based methodology that proj the annual energy use of a building. EXTERIOR WALL. Walls including both above-grade walls and below-grade walls. FENESTRATION. Products classified as either vertical fenestration or skylights. VERTICAL FENESTRATION. Windows (fixed or operable 9 pdf_text
2021 (cont. 3) SECTION R105 INSPECTIONS R105.1 General. Construction or work for which a permit is required shall be subject to inspection by code official or his or her designated agent, and such construction or work shall remain visible and ab be accessed for inspection purposes until approved. It shall be the duty of the permit applicant to cau the work to remain visible and able to be accessed for inspection purposes. Neither the code official n the jurisdiction shall be liable for expense entailed in the removal or replacement of any material, pro system or building component required to allow inspection to validate compliance with this code. R105.2 Required inspections. The code official or his or her designated agent, upon notification, sh make the inspections set forth in Sections R105.2.1 through R105.2.5. R105.2.1 Footing and foundation inspection. Inspections associated with footings and foundatio shall verify compliance with the code as to R-value, location, thickness, depth of burial and protecti insulation as required by the code and approved plans and specifications. R105.2.2 Framing and rough-in inspection. Inspections at framing and rough-in shall be made b application of interior finish and shall verify compliance with the code as to types of insulation and corresponding R-values and their correct location and proper installation; fenestration properties (U factor and SHCG) and proper installation; and air leakage controls as required by the code and approved plans 3 pdf_text
2021 (cont. 3) part of the addition shall comply with Sections R402.1, R402.2, R402.3.1 through R402.3.5, and R402.4. Exception: Where nonconditioned space is changed to conditioned space, the building envelope the addition shall comply where the UA, as determined in Section R402.1.5, of the existing buildin and the addition, and any alterations that are part of the project, is less than or equal to the UA generated for the existing building. R502.3.1.1 Existing ceilings with attic spaces. Where an addition greater than 150 square feet (13.9 m2) adjoins existing ceilings with attic spaces, the existing attic spaces shall comply with Section R402. R502.3.2 Heating and cooling systems. HVAC ducts newly installed as part of an addition shall comply with Section R403. Exception: The following need not comply with the testing requirements of Section R403.3.3: 59 pdf_text
2021 (cont. 3) SECTION R111 VIOLATIONS It shall be unlawful for any person, firm, or corporation to erect or construct any building, or remodel o rehabilitate any existing building or structure in the state, or allow the same to be done, contrary to or violation of any of the provisions of this code. SECTION R112 LIABILITY Nothing contained in this code is intended to be nor shall be construed to create or form the basis for liability on the part of any city or county or its officers, employees or agents for any injury or damage resulting from the failure of a building to conform to the provisions of this code. 5 pdf_text
2021 (cont. 3) SECTION R108 REFERENCED STANDARDS R108.1 Referenced codes and standards. The codes and standards referenced in this code shall b those listed in Chapter 5, and such codes and standards shall be considered as part of the requireme of this code to the prescribed extent of each such reference and as further regulated in Sections R10 and R108.1.2. R108.1.1 Conflicts. Where differences occur between provisions of this code and referenced code and standards, the provisions of this code shall apply. R108.1.2 Provisions in referenced codes and standards. Where the extent of the reference to a referenced code or standard includes subject matter that is within the scope of this code, the provisi of this code, as applicable, shall take precedence over the provisions in the referenced code or standard. R108.2 Application of references. References to chapter or section numbers, or to provisions not specifically identified by number, shall be construed to refer to such chapter, section or provision of th code. R108.3 Other laws. The provisions of this code shall not be deemed to nullify any provisions of local, state or federal law. In addition to the requirements of this code, all occupancies shall conform to the provisions included in the state building code (chapter 19.27 RCW). In case of conflicts among code enumerated in RCW 19.27.031 (1) through (4) and this code, an earlier named code shall govern ove 4 pdf_text
2021 (cont. 3) eah = (a) The proposed glazing area; where proposed glazing area is less than 15% of the conditioned floor area. (b) 15% of the conditioned floor area; where the proposed glazing area is 15% or more of the conditioned floor area. As proposed Orientation: Equally distributed to four cardinal compass orientations (N, E, S & W). As proposed U-factor: From Table R402.1.2 As proposed SHGC: From Table R402.1.3 except that for climates with no requirement (NR) SHGC = 0.40 shall be used. As proposed Interior shade fraction: 0.92 - (0.21 × SHGC for the standard reference design) External shading: None 41 pdf_text
2021 (cont. 3) burner operating cycle is completed. PILOT LIGHT, INTERRUPTED. A pilot which is automatically ignited prior to the admission of fuel to the m burner and which is automatically extinguished after the main flame is established. PILOT LIGHT, ON-DEMAND. A pilot which, once placed into operation, is intended to remain ignited for a predetermined period of time following an automatic or manual operation of the main burner gas valv PROPOSED DESIGN. A description of the proposed building used to estimate annual energy use for determining compliance based on total building performance. READY ACCESS (TO). That which enables a device, appliance or equipment to be directly reached witho requiring the removal or movement of any panel or similar obstruction. RENEWABLE ENERGY CERTIFICATE (REC). An instrument that represents the environmental attributes of megawatt hour of renewable energy; also known as an energy attribute certificate (EAC). RENEWABLE ENERGY RESOURCES. Energy derived from solar radiation, wind, waves, tides, landfill gas, biogas, biomass or extracted from hot fluid or steam heated within the earth. REPAIR. The reconstruction or renewal of any part of an existing building for the purpose of its maintenance or to correct damage. 10 pdf_text
2021 (cont. 3) R402.4.1.3 Leakage rate. Detached one- and two-family dwellings and multiple single-family dwellings (townhouses) shall comply with Section R402.4.1.3.1. Group R-2 multifamily buildings s comply with Section R402.4.1.3.2. R402.4.1.3.1 Dwelling unit leakage rate. The maximum air leakage rate for any dwelling unit under any compliance path shall not exceed 4.0 air changes per hour. Testing shall be conduct with a blower door test at a test pressure of 0.2 inches w.g. (50 Pa). Exception: Additions tested with the existing home having a combined maximum air leakage of 7 air changes per hour. To qualify for this exception, the date of construction of the existing dwelling must be prior to the 2009 Washington State Energy Code. R402.4.1.3.2 Group R-2 multifamily building leakage rate. For Group R-2 multifamily buildin the maximum leakage rate for any dwelling unit shall not exceed 0.25 cfm per square foot of th dwelling unit enclosure area. Testing shall be conducted with a blower door at a test pressure o inches w.g. (50 Pa). Doors and windows of adjacent dwelling units (including top and bottom un shall be open to the outside during the test. 29 pdf_text
2021 (cont. 3) eiling insulation. The thickness of blown-in or sprayed roof/ceiling insulation (fiberglass or cellulose) shall be written in inches (mm) on markers that are installed at least one for every 300 square feet (28 m2) throughout the attic space. The markers s be affixed to the trusses or joists and marked with the minimum initial installed thickness with numbers a minimum of 1 inch (25 mm) in height. Each marker shall face the attic access opening. Spray polyurethane foam thickness and installe value shall be listed on certification provided by the insulation installer. R303.1.2 Insulation mark installation. Insulating materials shall be installed such that the manufacturer's R-value mark is readily observable upon inspection. For insulation materials that ar installed without an observable manufacturer’s R-value mark, such as blown or draped products, a insulation certificate complying with Section R303.1.1 shall be left immediately after installation by t installer, in a conspicuous location within the building, to certify the installed R-value of the insulatio material. R303.1.3 Fenestration product rating. U-factors of fenestration products (windows, doors and skylights) shall be determined in accordance with NFRC 100. Exception: Where required, garage door U-factors shall be determined in accordance with either NFRC 100 or ANSI/DASMA 105. U-factors shall be determined by an accredited, independent laboratory, and labeled and certified the manufacturer. Products 14 pdf_text
2021 (cont. 3) different sections of this code specify different materials, methods of construction or other requirements, the most restrictive shall govern. Where the a conflict between a general requirement and a specific requirement, the specific requirement shall govern. R101.4.1 Mixed residential and commercial buildings. Where a building includes both residentia building and commercial building portions, each portion shall be separately considered and meet th applicable provisions of the WSEC - Commercial Provisions or WSEC - Residential Provisions. R101.5 Compliance. Residential buildings shall meet the provisions of WSEC - Residential Provision Commercial buildings shall meet the provisions of WSEC - Commercial Provisions. R101.5.1 Compliance materials. The code official shall be permitted to approve specific computer software, worksheets, compliance manuals and other similar materials that meet the intent of this c 1 pdf_text
2021 (cont. 3) ), glazed doors, glazed block and combination opaque/glazed doors composed of glass or other transparent or translucent glazing materials and installed at a slope of not less than 60 degrees from horizontal. Opaque areas such as spandrel pa are not considered vertical fenestration. SKYLIGHT. Glass or other transparent or translucent glazing material installed at a slope of less than degrees from horizontal, including unit skylights, tubular daylighting devices and glazing materials i solariums, sunrooms, roofs and sloped walls. FENESTRATION AREA. Total area of the fenestration measured using the rough opening, and including t glazing, sash and frame. FENESTRATION PRODUCT, FIELD-FABRICATED. A fenestration product whose frame is made at the construction site of standard dimensional lumber or other materials that were not previously cut, or otherwise formed with the specific intention of being used to fabricate a fenestration product or exteri door. Field fabricated does not include site-built fenestration. FENESTRATION PRODUCT, SITE-BUILT. A fenestration designed to be made up of field-glazed or field- assembled units using specific factory cut or otherwise factory-formed framing and glazing units. Examples of site-built fenestration include storefront systems, curtain walls, and atrium roof systems. F-FACTOR. The perimeter heat loss factor for slab-on-grade floors (Btu/h × ft × °F) [W/(m × K)]. HEATED SLAB-ON-GRADE FLOOR. Slab-on-grade floor construction in which t 9 pdf_text
2021 (cont. 3) WATER SYSTEM. A water distribution system where one or more pumps prime t service hot water piping with heated water upon demand for hot water. DIMMER. A control device that is capable of continuously varying the light output and energy use of lig sources. DUCT. A tube or conduit utilized for conveying air. The air passages of self-contained systems are not be construed as air ducts. DUCT SYSTEM. A continuous passageway for the transmission of air that, in addition to ducts, includes fittings, dampers, plenums, fans and accessory air-handling equipment and appliances. 8 pdf_text
2021 (cont. 3) ctors and SHGC are maximums. When insulation is installed in a cavity w is less than the label or design thickness of the insulation, the compressed R-value of the insulation fro Appendix A Table A101.4 of chapter 51-11C WAC shall not be less than the R-value specified in the ta b. The fenestration U-factor column excludes skylights. c. "10/15/21 +5TB" means R-10 continuous insulation on the exterior of the wall, or R-15 continuous insul on the interior of the wall, or R-21 cavity insulation plus a thermal break between the slab and the base wall at the interior of the basement wall. "10/15/21 +5TB" shall be permitted to be met with R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior o wall. "5TB" means R-5 thermal break between floor slab and basement wall. d. R-10 continuous insulation is required under heated slab on grade floors. See Section R402.2.9.1. e. For single rafter- or joist-vaulted ceilings, the insulation may be reduced to R-38 if the full insulation dep extends over the top plate of the exterior wall. f. R-7.5 continuous insulation installed over an existing slab is deemed to be equivalent to the required perimeter slab insulation when applied to existing slabs complying with Section R503.1.1. If foam plasti used, it shall meet the requirements for thermal barriers protecting foam plastics. g. For log structures developed in compliance with Standard ICC 400, log walls shall meet t 21 pdf_text
2021 (cont. 3) 2(9) and tested and rated in accorda with the applicable test procedure. R403.7.1 Gas fireplace efficiency. All gas fireplace heaters rated to ANSI Z21.88 shall be listed a labeled with a fireplace efficiency (FE) rating of 50 percent or greater in accordance with CSA P.4.1 Vented gas fireplaces (decorative appliances) certified to ANSI Z21.50 shall be listed and labeled, including their FE ratings, in accordance with CSA P.4.1. R403.8 Systems serving multiple dwelling units. Systems serving multiple dwelling units shall com with Sections C403 and C404 of the WSEC--Commercial Provisions in lieu of Section R403. 35 pdf_text
2021 (cont. 3) ement, type or purpose of the original installation. APPROVED. Acceptable to the code official. APPROVED AGENCY. An established and recognized agency that is regularly engaged in conducting tes furnishing inspection services, or furnishing product certification, where such agency has been appro by the code official. AUTOMATIC. Self-acting, operating by its own mechanism when actuated by some impersonal influenc as, for example, a change in current strength, pressure, temperature or mechanical configuration (se "Manual"). BASEMENT WALL. See above-grade wall and below-grade wall. 7 pdf_text
2021 (cont. 3) tio R402.2.10. Shafts, penetrations Duct and flue shafts to exterior or unconditioned space shall be air sealed. Utility penetrations of the air barrier shall be caulked, gasketed or otherwise sealed and shall allow for expansion and contraction of materials and mechanical vibration. Insulation shall be fitted tightly aro utilities passing through shafts and penetrations in the building therma envelope to maintain required R- value. Narrow cavities Narrow cavities, of 1 inch or less, not able to be insulated, shall be air sealed. Batts in narrow cavities shall be cu fit and installed to the correct dens without any voids or gaps or compression, or narrow cavities s be filled by insulation that on installation readily conforms to the available cavity space. Garage separation Air sealing shall be provided between the garage and conditioned spaces. Insulated portions of the garage separation assembly shall be insta in accordance with Sections R303 and R402.2.8. Recessed lighting Recessed light fixtures installed in the building thermal envelope shall be air sealed in accordance with Section R402.4.3. Recessed light fixtures installed in building thermal envelope shall be tight and IC rated and shall be buri or surrounded with insulation. 28 pdf_text
2021 (cont. 3) ormance with the code edition under which installed. The owner or the owner’s authorized agent be responsible for the maintenance of buildings and structures. The requirements of this chapter shall provide the basis for removal or abrogation of energy conservation, fire protection and safety systems and devices in existing structures. R501.4 Compliance. Alterations, repairs, additions and changes of occupancy to, or relocation of, existing buildings and structures shall comply with the provisions for alterations, repairs, additions an changes of occupancy or relocation, respectively, in this code and the International Residential Code, International Building Code, International Existing Building Code, International Fire Code, Internation Fuel Gas Code, International Mechanical Code, Uniform Plumbing Code, International Property Maintenance Code, and NFPA 70. R501.5 New and replacement materials. Except as otherwise required or permitted by this code, materials permitted by the applicable code for new construction shall be used. Like materials shall be permitted for repairs, provided hazards to life, health or property are not created. Hazardous material shall not be used where the code for new construction would not permit their use in buildings of simila occupancy, purpose and location. R501.6 Historic buildings. The code official may modify the specific requirements of this code for historic buildings and require alternative provisions which will result in a rea 58 pdf_text
2021 (cont. 4) sonable degree of energy efficiency. This modification may be allowed for those buildings or structures that are listed in the stat national register of historic places; designated as a historic property under local or state designation l or survey; certified as a contributing resource with a national register listed or locally designated histo district; or with an opinion or certification that the property is eligible to be listed on the national or stat registers of historic places either individually or as a contributing building to a historic district by the st historic preservation officer or the keeper of the national register of historic places. 58 pdf_text
2021 (cont. 4) he requiremen climate zone 5 of ICC 400. h. Int. (intermediate framing) denotes framing and insulation as described in Section A103.2.2 including standard framing 16 inches on center, 78 percent of the wall cavity insulated and headers insulated with minimum of R-10 insulation. i. The first value is cavity insulation, the second value is continuous insulation. Therefore, as an example, “R13+10” means R-13 cavity insulation plus R-10 continuous insulation. j. A maximum U-factor of 0.32 shall apply to vertical fenestration products installed in buildings located ab 21 pdf_text
2021 (cont. 4) he heating elements, hydro tubing, or hot air distribution system is in contact with, or placed within or under, the slab. HIGH-EFFICACY LIGHT SOURCES. Compact fluorescent lamps, light-emitting diode (LED) lamps, T-8 or s diameter linear fluorescent lamps, or other lamps with an efficacy of not less than 65 lumens per watt, luminaires with an efficacy of not less than 45 lumens per watt. HISTORIC BUILDINGS. Buildings that are listed in or eligible for listing in the National Register of Historic Places, or designated as historic under an appropriate state or local law. INFILTRATION. The uncontrolled inward air leakage into a building caused by the pressure effects of wi or the effect of differences in the indoor and outdoor air density or both. INSULATING SHEATHING. An insulating board with a core material having a minimum R-value of R-2. INSULATING SIDING. A type of continuous insulation with manufacturer-installed insulating material as a integral part of the cladding product having a minimum R-value of R-2. 9 pdf_text
2021 (cont. 4) and specifications. R105.2.2.1 Wall insulation inspection. The code official, upon notification, shall make a wall insulation inspection in addition to those inspections required in Section R109 of the International Residential Code. This inspection shall be made after all wall and cavity insulation is in place and prior to cover. R105.2.3 Plumbing rough-in inspection. Inspections at plumbing rough-in shall verify compliance required by the code and approved plans and specifications as to types of insulation and correspon R-values and protection, and required controls. R105.2.4 Mechanical rough-in inspection. Inspections at mechanical rough-in shall verity compli as required by the code and approved plans and specifications as to installed HVAC equipment typ and size, required controls, system insulation and corresponding R-value, system air leakage contr programmable thermostats, dampers, whole-house ventilation and minimum fan efficiency. 3 pdf_text
2021 (cont. 4) SECTION R102 ALTERNATIVE MATERIALS, DESIGN AND METHODS OF CONSTRUCTION AND EQUIPMENT R102.1 General. The provisions of this code are not intended to prevent the installation of any materi to prohibit any design or method of construction not specifically prescribed by this code, provided that such alternative has been approved. The code official shall have the authority to approve an alternate material, design or method of construction upon the written application of the owner or the owner’s authorized agent. The code official shall first find that the proposed design is satisfactory and complie with the intent of the provisions of this code, and that the material, method or work offered is, for the purpose intended, not less than the equivalent of that prescribed in this code for strength, effectivene fire resistance, durability, energy efficiency and safety. The code official shall respond in writing, stati the reasons why the alternative was approved or was not approved. 1 pdf_text
2021 (cont. 4) lacking such a labeled U-factor shall be assigned a default U-factor fro Table R303.1.3(1), R303.1.3(2) or R303.1.3(4). The solar heat gain coefficient (SHGC) and visible transmittance (VT) of glazed fenestration products (windows, glazed doors and skylights) shall be determined in accordance with NFRC 200 by an accredited, independent laboratory, and labeled a 14 pdf_text
2111 2111 Eisenhower Avenue Alexandria, VA 22314 Standard R reference number Title sectio APSP 14-2019 American National Standard for Portable Electric Spa Energy Efficiency ............. R APSP 15a-2013 American National Standard for Residential Swimming Pool and Spa energy efficiency ................................................................................. R 62 pdf_text
24 24 School Street, 2nd Floor Boston, MA 02108-4314 Standard R reference number Title sectio cc ASHP Version 3.1 Cold Climate Air Source Heat Pump (ccASHP) Product List and Specifications: ...........................................................Table C40 https://neep.org/heating-electrification/ccashp-specification-product-list NEMA National Electrical Manufacturers Association 65 pdf_text
25 25% glazed fenestration (22 in.x36 in. lite) – 16 pdf_text
25 25 West 43rd Street, 4th Floor New York, NY 10036 Standard R reference number Title sectio Z21-50-2016/CSA 2.22- 62 pdf_text
25.5 25.5 + (8.5 x Nbr) x (1-HWDS) Where: Nbr = number of bedro HWDS = factor for the compactness of the ho water distribution syste Compactness Ratioi Factor H 43 pdf_text
2800 2800 Shirlington Road, Suite 300 Arlington, VA 22206 Standard R reference number Title sectio Manual J—16 Residential Load Calculation Eighth Edition ........................................................... Manual S—14 Residential Equipment ............................................................................................ ANSI America National Standards Institute 62 pdf_text
3 3. Large Dwelling Unit: .......................................................................................... 9.0 credits Dwelling units exceeding 5000 square feet of conditioned floor area. 47 pdf_text
3 3) All metal framing members of the products exposed to interior and exterior air shall incorporate a therm break meeting the criteria in 1) and 2) above. R303.1.4 Insulation product rating. The thermal resistance (R-value) of insulation shall be determ in accordance with the U.S. Federal Trade Commission R-value rule (C.F.R. Title 16, Part 460) in u of h × ft2 × °F/Btu at a mean temperature of 75°F (24°C). R303.1.4.1 Insulated siding. The thermal resistance (R-value) of insulated siding shall be determined in accordance with ASTM C1363. Installation for testing shall be in accordance with t manufacturer’s installation instructions. R303.1.5 Air-impermeable insulation. Insulation having an air permeability not greater than 0.004 cubic feet per minute per square foot [0.002 L/(s x m2)] under pressure differential of 0.3 inch water gauge (75 Pa) when tested in accordance with ASTM E2178 shall be determined air-impermeable insulation. R303.2 Installation. All materials, systems and equipment shall be installed in accordance with the manufacturer's installation instructions and the International Building Code or International Residentia Code, as applicable. R303.2.1 Protection of exposed foundation insulation. Insulation applied to the exterior of basem walls, crawlspace walls and the perimeter of slab-on-grade floors shall have a rigid, opaque and weat resistant protective covering to prevent the degradation of the insulation's thermal performance. The protective cover 15 pdf_text
3 3. For forced air ducts, a maximum of 10 linear feet of return ducts and 5 linear feet of supply du is permitted to be located outside the conditioned space, provided they are insulated to a minimum of R-8. 31 pdf_text
3 3. Ductless mini-split heat pump systems that have an integral proprietary thermostat. 30 pdf_text
3 3. Section R407. R401.3 Certificate. A permanent certificate shall be completed by the builder or other approved party posted on a wall in the space where the furnace is located, a utility room, or an approved location insi the building. When located on an electrical panel, the certificate shall not cover or obstruct the visibilit the circuit directory label, service disconnect label, or other required labels. The certificate shall indica the following: 19 pdf_text
3 3. The results from any required duct system and building envelope air leakage testing done on th building. 19 pdf_text
3 3. Existing duct systems constructed, insulated or sealed with asbestos. R502.3.3 Service hot water systems. New service hot water systems that are part of the addition comply with Section R403.5. R502.3.4 Lighting. New lighting systems that are part of the addition shall comply with Section R4 R502.4 Existing plus addition compliance (Total Building Performance). Where nonconditioned space is changed to conditioned space the addition shall comply where the annual energy use of the addition and the existing building, and any alterations that are part of the project, is less than or equal the annual energy use of the existing building when modeled in accordance with Section R405. The addition and any alterations that are part of the project shall comply with Section R405 in its entirety. 59 pdf_text
3 3. For structures 1,500 to 5,000 square feet of conditioned floor area, the annual site energy consumption shall be no more than 47 percent of the standard reference design. 38 pdf_text
3 3. A statement, bearing the name of the individual performing the analysis and generating the report, along with their organization and contact information, indicating that the as-built buil complies with Section R405.2. 40 pdf_text
3 3. Fenestration U-factors and SHGCs. 2 pdf_text
3 3. Controls that override automatic shut-off actions shall not be allowed unless the override automatically returns automatic control to its normal operation within 24 hours. 37 pdf_text
3 3. HIGH EFFICIENCY HVAC EQUIPMENT OPTIONS Only one option from Items 3.1 through 3.10 may be selected in this category. Item 3.11 may be taken wit Items 3.1 or 3.33.2c only. 49 pdf_text
3 3. The hot water rectangle shall be shown on the floor plans and the area shall be computed to the near square foot. 44 pdf_text
3 3) All metal framing members of the products exposed to interior and exterior air shall incorpor thermal break meeting the criteria in 1) and 2) above. c. A minimum air space of 0.375 inches between panes of glass is required for double glazing. d. A minimum air space of 0.25 inches between panes of glass is required for triple glazing. e. Deemed to comply glazing shall not be used for performance compliance. 18 pdf_text
3 3. Greenhouses isolated from any conditioned space and not intended for occupancy. R402.1.1 Vapor retarder. Wall assemblies in the building thermal envelope shall comply with the v retarder requirements of Section R702.7 of the International Residential Code or Section 1404.3 of International Building Code, as applicable. R402.1.2 Insulation and fenestration criteria. The building thermal envelope shall meet the requirements of Table R402.1.2 based on the climate zone specified in Chapter 3. Assemblies shal have a U-factor equal to or less than that specified in Table R402.1.2. Fenestration shall have a U-factor equal to or less than specified in Table R402.1.2. TABLE R402.1.2 INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENTa For SI: 1 foot = 304.8 mm, ci = continuous insulation, int = intermediate framing. a. U-factors or F-factors shall be obtained from measurement, calculation or an approved source, or as specified in Section R402.1.5. b. A maximum U-factor of 0.32 shall apply to vertical fenestration products installed in buildings located above 4000 feet in elevation above sea level, or in windborne debris regions where protection of openings is required under Section R301.2.1.2 of the International Residential Code. 20 pdf_text
3 3. Group R-3 occupancy areas in buildings three stories or less in height above grade plane whos dwelling units are accessed directly from the exterior. 11 pdf_text
3 3. Gap fill shall be assumed to be air unless there is a minimum of 90% argon or krypton. 17 pdf_text
3 3. The name and version of the compliance software tool. 38 pdf_text
3 3. A combination of cavity and continuous insulation shall be installed so that the cavity insulatio in contact with the top side of the continuous insulation that is installed on the underside of th floor framing separating the cavity and the unconditioned space below. The combined R-valu the cavity and continuous insulation shall equal the required R-value for floors. Insulation sha extend from the bottom to the top of all perimeter floor framing members and the framing members shall be air sealed. Exceptions: 25 pdf_text
3 3. Repairs where only the bulb and/or ballast within the existing luminaires in a space are replace provided that the replacement does not increase the installed interior lighting power. SECTION R505 CHANGE OF OCCUPANCY OR USE R505.1 General. Any space not within the scope of Section R101.2 which is converted to space that i within the scope of Section R101.2 shall be brought into full compliance with this code. Spaces undergoing a change in occupancy that would result in an increase in demand for either fos fuel or electrical energy shall comply with this code. Any space that is converted to a dwelling unit or portion thereof from another use or occupancy shall comply with this code. Exception: Where the simulated performance option in Section R405 is used to comply with this section, the annual energy use of the proposed design is permitted to be 110 percent of the annual energy use otherwise allowed by Section R405.3. R505.1.1 Unconditioned space. Any unconditioned or low-energy space that is altered to become conditioned space shall comply with Section R502. 61 pdf_text
3 3. Construction where the existing roof, wall or floor cavity is not exposed. 60 pdf_text
3 3. Gas heat pump water heaters intended for exterior installation. 34 pdf_text
3 3. A list of compliance features. 56 pdf_text
3 3 Park Avenue New York, NY 10016-5997 Standard R reference number Title sectio 64 pdf_text
3 3. Pool heaters. 31 pdf_text
3 3. Interior doors, if installed at the time of the test, shall be open, access hatches to condition crawl spaces and conditioned attics shall be open. 26 pdf_text
3 3. Lighting designed for safety or security. R404.3 Exterior lighting controls. Where the total permanently installed exterior lighting power is greater than 30 watts, the permanently installed exterior lighting shall comply with the following: 37 pdf_text
3 3. The heat pump is operating in defrost mode. 34 pdf_text
3 3. Washing machine (Residential) – Energy Star rated (Version 54 pdf_text
3 3. Printed code official inspection checklist listing each of the proposed design component characteristics from Table R405.4.2(1) determined by the analysis to provide compliance, alo with their respective performance ratings (e.g., R-value, U-factor, SHGC, HSPF, AFUE, SEE EF, etc.). R405.5.2 Specific approval. Performance analysis tools meeting the applicable sections of Sectio R405 shall be permitted to be approved. Tools are permitted to be approved based on meeting a specified threshold for a jurisdiction. The code official shall be permitted to approve tools for a speci application or limited scope. R405.5.3 Input values. When calculations require input values not specified by Sections R402, R4 R404 and R405, those input values shall be taken from an approved source. 45 pdf_text
3 3. Test for ducts within thermal envelope: Where all ducts and air handlers are located entirely within the building thermal envelope, total leakage shall be less than or equal to 8.0 cubic fee minute (226.6 L/min) per 100 square feet (9.29 m2) of conditioned floor area. For forced air d a maximum of 10 linear feet of return ducts and 5 linear feet of supply ducts may be located outside the conditioned space. All metallic ducts located outside the conditioned space must both transverse and longitudinal joints sealed with mastic. If flex ducts are used, they cannot contain splices. Flex duct connections must be made with nylon straps and installed using a plastic strapping tensioning tool. Ducts located in crawl spaces do not qualify for this exceptio R403.3.7 Building cavities. Building framing cavities shall not be used as ducts or plenums. Installation of ducts in exterior walls, floors or ceilings shall not displace required envelope insulatio R403.4 Mechanical system piping insulation. Mechanical system piping capable of carrying fluids above 105°F (41°C) or below 55°F (13°C) shall be insulated to a minimum of R-6. Exception: Up to 200 feet of hydronic system piping installed within the conditioned space may be insulated with a minimum of ½-inch insulation with a k value of 0.28. R403.4.1 Protection of piping insulation. Piping insulation, including termination ends, exposed t weather shall be protected from damage, including that caused by sunlight, moisture, ph 33 pdf_text
3 (cont. 2) ysical dam and wind, and shall provide shielding from solar radiation that can cause degradation of the materia Protection shall be removable for the exposed length or no less than six inches from the equipment maintenance. Adhesive tape shall not be permitted. R403.5 Service hot water systems. Energy conservation measures for service hot water systems s be in accordance with this section. Service water-heating equipment shall meet the requirements of D 33 pdf_text
3 (cont. 2) ing shall cover the exposed exterior insulation and extend a minimum of 6 inches (15 mm) below grade. R303.3 Maintenance information. Maintenance instructions shall be furnished for equipment and systems that require preventive maintenance. Required regular maintenance actions shall be clearly stated and incorporated on a readily visible label. The label shall include the title or publication numb for the operation and maintenance manual for that particular model and type of product. 15 pdf_text
3.1 3.1. Metallic ducts located outside the conditioned space must have both transverse and longitudinal joints sealed with mastic. 31 pdf_text
3.1 3.1a For a System Type 1 in Table R406.2: Energy Star rated (U.S. North) Gas or propane furnace with minimum AFUE of 95% or Energy Star rated (U.S. North) Gas or propane boiler with minimum AFUE of 90%. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 49 pdf_text
3.10 3.10f Combination water heating and space heating system shall include one of the following: Gas-fired heat pump water heater(s) meeting Tier 2 of the NEEA Advanced Water Heating Specification for Gas-Fueled Residential Storage Water Heaters Version 1.0. or For R-2 Occupancy, gas-fired heat pump water heater(s) meeting Tier 2 of the NEEA Advanced Water Heating Specification for Gas-Fueled Residential Storage Water Heaters Version 1.0., shall serve all units. or For R-2 Occupancy, gas-fired heat pump(s) meeting ANSI Z21.40.2 and Z21.40.4 or CSA, with a minimum UEF of 1.15, shall serve all units. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency and, for solar water heating systems, the calculation of the minimum energy savings. 51 pdf_text
3.11 3.11c Connected thermostat meeting ENERGY STAR Certified Smart Thermostats/EPA ENERGY STAR specifications. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the thermostat model. 51 pdf_text
3.2 3.2. If flex ducts are used, they cannot contain splices. Flex duct connections must be made nylon straps and installed using a plastic strapping tensioning tool. 31 pdf_text
3.2 3.2a For secondary heating system serving System Type 2 in Table R406.2: Air-source centrally ducted heat pump with minimum HSPF of 9.5 Energy Star rated (U.S. North) Gas or propane furnace with minimum AFUE of 95% or Energy Star rated (U.S. North) Gas or propane boiler with minimum AFUE of 90%. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 49 pdf_text
3.3 3.3a,c,d Air-source, centrally ducted heat pump with minimum HSPF2 of 8.1 (HSPF of 9.5). In areas where the winter design temperature as specified in Appendix RC is 23°F or below, a cold climate heat pump found on the NEEP cc ASHP qualified product list shall be used. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 49 pdf_text
3.4 3.4a,d Closed-loop ground source heat pump; with a minimum COP of 3.3 or Open loop water source heat pump with a maximum pumping hydraulic head of 150 feet and minimum COP of 3.6. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 50 pdf_text
3.5 3.5d Ductless mini-split heat pump system, zonal control: In homes where the primary space heating system is zonal electric heating, a ductless mini-split heat pump system with a minimum HSPF2 of 9 (HSPF of 50 pdf_text
3.6 3.6a Air-source, centrally ducted heat pump with minimum HSPF2 of 9.4 (HSPF of 11.0). A centrally ducted air source cold climate variable capacity heat pump (cc VCHP) found on the NEEP cc VCHP qualified product list with a minimum of 9 8.5 HSPF2 (10 HSPF) may be used to satisfy this requirement. In areas where the winter design temperature as specified in Appendix RC is 23°F or below, an air source centrally ducted heat pump shall be a cold climate variable capacity heat pump as listed on the NEEP qualified product list. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 50 pdf_text
3.7 3.7a,d,e Ductless split system heat pumps with no electric resistance heating in the primary living areas. A ductless heat pump system with a minimum HSPF2 of 9 (HSPF of 10) shall be sized and installed to provide heat to entire dwelling unit at the design outdoor air temperature. Exception: In homes with total heating loads of 24,000 or less using multi-zone mini-split systems with nominal ratings of 24,000 or less, the minimum HSPF s to claim this credit shall be 8.19 HSPF2 (or 9 HSPF). To qualify to claim this credit, the building permit drawings shall specify the option being selected, the heated floor area calculation, the heating equipment type(s), the minimum equipment efficiency, and total installed heat capacity (by equipment type). 50 pdf_text
3.8 3.8a,d Air-to-water heat pump with minimum COP of 3.2 at 47°F, rated in accordance with AHRI 550/590 by an accredited or certified testing lab. To qualify to claim this credit, the building permit drawings shall specify the option being selected, the heated floor area calculation, the heating equipment type(s), the minimum equipment efficiency, and total installed heat capacity (by equipment type). 50 pdf_text
3.9 3.9 Gas-fired heat pump(s) meeting ANSI Z21.40.2 and Z21.40.4 or CSA, with a minimum UEF of 1.15. For R-2 Occupancy, gas-fired heat pump(s) meeting ANSI Z21.40.2 and Z21.40.4 or CSA, with a minimum UEF of 1.15, shall serve all units. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and the minimum equipment efficiency. 51 pdf_text
30 30 inches of clear distance from the top of the bottom chord of the truss or ceiling joist to the underside of the sheathing at the roof ridge. R402.2.2 Reserved. R402.2.3 Eave baffle. For air-permeable insulation in vented attics, a baffle shall be installed adjac to soffit and eave vents. Baffles shall maintain a net free area opening equal to or greater than the of the vent. The baffle shall extend over the top of the attic insulation. The baffle shall be permitted be any solid material. The baffle shall be installed to the outer edge of the exterior wall top plate so to provide maximum space for attic insulation coverage over the top plate. Where soffit venting is n continuous, baffles shall be installed continuously to prevent ventilation air in the eave soffit from bypassing the baffle. R402.2.4 Access hatches and doors. Access hatches and doors from conditioned spaces to unconditioned spaces such as attics and crawl spaces shall be insulated to the same R-value requi by table R402.1.3 for the wall or ceiling in which they are installed. Exception: Vertical doors providing access from conditioned spaces to unconditioned spaces tha comply with the fenestration requirements of Table R402.1.3. R402.2.4.1 Access hatches and door insulation installation and retention. Vertical or horizon access hatches and doors from conditioned spaces to unconditioned spaces such as attics and c spaces shall be weatherstripped. Access that prevents damaging or compressing the in 24 pdf_text
30 (cont. 2) sulation s be provided to all equipment. Where loose fill insulation is installed, a wood framed or equivalent baffle or retainer, or dam shall be installed to prevent the loose-fill insulation from spilling into the living spaces, from higher to lower sections of the attic and from attics covering conditioned spac unconditioned spaces. The baffle or retainer shall provide a permanent means of maintaining the installed R-value of the loose fill insulation. R402.2.5 Mass walls. Mass walls, where used as a component of the building thermal envelope sh be one of the following: 24 pdf_text
333 333 Pfingsten Road Northbrook, IL 60062 Standard R reference number Title sectio UL 127—2011 Factory Built Fireplace .......................................................................................... UL 515—2015 Standard for Electrical Resistance Trace Heating for Commercial Applications ................................................................................... R UL 907—1994 Fireplace Accessories (with revisions through April 2010) ................................... US-FTC United States-Federal Trade Commission 65 pdf_text
346-2017 346-2017 and be so labeled. To qualify to claim this credit, the building permit drawings shall include a plumbing diagram that specifies the drain water heat recovery units and the plumbing layout needed to install it. Labels or other documentation shall be provided that demonstrates that the unit complies with the standard. 52 pdf_text
4 4. The vapor compression cycle malfunctions or loses power. Exception: Heat trace temperature maintenance systems, provided the system capacity does exceed the capacity of the heat pump water heating system. 34 pdf_text
4 4 cfm (113.3 L/min) per 100 square feet (9.29 m2) of conditioned floor area when tested at a pressure differential of 0.1 inches w.g. (25 Pa) across the entire system, including the manufacturer's air handler enclosure. All register boots shall be taped or otherwise sealed du the test. 33 pdf_text
4 4. Documentation of all inputs entered into the software used to produce the results for the reference design and/or the rated home. 38 pdf_text
4 4. Group R-2 occupancy areas in buildings three stories or less in height above grade plane whos dwelling units are accessed directly from the exterior. 11 pdf_text
4 4. Spa heaters. 31 pdf_text
4 4. Exterior or interior terminations for continuous ventilation systems and heat recovery ventil shall be sealed. 26 pdf_text
4 4. Aluminum frame with thermal break is as defined in footnote 1 to Table R303.1.3(1). 17 pdf_text
4 4. Roof recover. 60 pdf_text
4 4. Area-weighted U-factor and SHGC calculations. 2 pdf_text
4 4. Dryer – Energy Star rated, Most Efficient 2022 To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall show the appliance type and provide documentation of Energy Star compliance. At the time of inspection, all appliances shall be installed and connected to utilities. Dryer ducts and exterior dryer vent caps are not permitted to be installed in the dwelling unit. 54 pdf_text
4 4. Ductwork in floor cavities located over unconditioned space shall comply with all of the followi 31 pdf_text
4 4. Dwelling units serving Group R-2 occupancies: ................................................ 6.5 credits See Section R401.1 and residential building in Section R202 for Group R-2 scope. 47 pdf_text
4 4. A PHIUS precertification letter. Prior to the issuance of a certificate of occupancy, the following item must be provided to the cod official: 56 pdf_text
4 4. Atmospheric vented gas water heaters. R403.5.6 Water heater insulation. All tank-type water heaters in unconditioned spaces, or on con floors in conditioned spaces, shall be placed on an insulated surface with a minimum thermal resist of R-10, and a minimum compressive strength of 40 psi or engineered to support the appliance. R403.5.7 Supplementary heat for heat pump water heating systems. Heat pumps used for wat heating and having supplementary water heating equipment shall have controls that limit supplementary water heating equipment operation to only those times when one of the following applies: 34 pdf_text
4 4. Where there is more than one water heater and each water heater serves different plumbing fixtures appliances, it is permissible to establish a separate hot water rectangle for each hot water distributi system and add the area of these rectangles together to determine the compactness ratio. 44 pdf_text
4 4. The results from the whole-house mechanical ventilation system flow rate test. 19 pdf_text
4 4. The name and version of the compliance software tool. 40 pdf_text
4 4. For structures over 5,000 square feet of conditioned floor area, the annual site energy consum shall be no more than 41 percent of the standard reference design. 38 pdf_text
4 4. HIGH EFFICIENCY HVAC DISTRIBUTION SYSTEM OPTIONS 51 pdf_text
4.1 4.1. A continuous air barrier installed between unconditioned space and the duct. 31 pdf_text
4.1 4.1 HVAC equipment and associated duct system(s) installation shall comply with the requirements of Section R403.3.2. Electric resistance heat, hydronic heating and ductless heat pumps are not permitted under this option. Direct combustion heating equipment with AFUE less than 80% is not permitted under this option. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the heating equipment type and shall show the location of the heating and cooling equipment and all the ductwork. 51 pdf_text
4.2 4.2. Insulation installed in accordance with Section R402.2.7. 32 pdf_text
4.3 4.3. A minimum R-19 insulation installed in the cavity width separating the duct from unconditioned space. 32 pdf_text
400 400—2020 Procedure for Determining Fenestration Product Air Leakage—Second Edition UL Underwriters Laboratories LLC 65 pdf_text
4000 4000 feet in elevation above sea level, or in windborne debris regions where protection of openings is required under Section R301.2.1.2 of the International Residential Code. 21 pdf_text
421 421 SW 6th Ave, Suite 600 Portland, OR 97204 Standard R reference number Title sectio NEEA-2011 Northern Climate Specification for Heat Pump Water Heaters, Vers. 4.0 ..... Tabl NEEA-2019 Advanced Water Heating Specifications for Gas-Fueled Residential Storage Water Heaters, Version 1.0 .............................................. R 64 pdf_text
45 45% glazed fenestration (22 in.x64 in. lite) – 16 pdf_text
4C 4C Grays Harbor 13 pdf_text
4C 4C San Juan 13 pdf_text
5 5. Additions 150 square feet to 500 square feet: ................................................... 2.0 credits The drawings included with the building permit application shall identify which options have been selected and the point value of each option, regardless of whether separate mechanical, plumbing, electrical, or other permits are utilized for the project. TABLE R406.3 ENERGY CREDITS OPTION DESCRIPTION CREDIT(S) All Other Group R 47 pdf_text
5 5. Accessory structures to residential buildings. Group R-2 buildings with dwelling units accessed from interior corridors or other interior spaces are residential buildings. ROOF ASSEMBLY. A system designed to provide weather protection and resistance to design loads. Th system consists of a roof covering and roof deck or a single component serving as both the roof cove and the roof deck. A roof assembly includes the roof covering, underlayment and roof deck, and can include a thermal barrier, an ignition barrier, insulation or a vapor retarder. ROOF RECOVER. The process of installing an additional roof covering over a prepared existing roof covering without removing the existing roof covering. ROOF REPAIR. Reconstruction or renewal of any part of an existing roof for the purposes of its maintenance. ROOF REPLACEMENT. The process of removing the existing roof covering, repairing any damaged subs and installing a new roof covering. R-VALUE (THERMAL RESISTANCE). The inverse of the time rate of heat flow through a body from one of i bounding surfaces to the other surface for a unit temperature difference between the two surfaces, un steady state conditions, per unit area (h • ft2 • °F/Btu) [(m2 • K)/W]. SERVICE WATER HEATING. Supply of hot water for purposes other than comfort heating. SLAB-ON-GRADE FLOOR. That portion of a slab floor of the building envelope that is in contact with the ground and that is either above grade or is less than or equal to 24 inches below 11 pdf_text
5 5. For structures serving Group R-2 occupancies, the annual site energy consumption shall be les than or equal to 61 percent of the annual site energy consumption of the standard reference de See Section R401.1 and residential building in Section R202 for Group R-2 scope. Energy use derived from simulation analysis shall be expressed in Btu per square foot of conditione floor area per year. R405.3 Documentation. Documentation of the software used for the performance design and the parameters for the building shall be in accordance with Sections R405.3.1 through R405.3.2.2. R405.3.1 Compliance software tools. Documentation verifying that the methods and accuracy of compliance software tools conform to the provisions of this section shall be provided to the code off R405.3.2 Compliance report. Compliance software tools shall generate a report that documents th the proposed design complies with Section R405.2. A compliance report on the proposed design sh be submitted with the application for the building permit. Upon completion of the building, a confirm compliance report based on the confirmed condition of the building shall be submitted to the code official before a certificate of occupancy is issued. Compliance reports shall include information in accordance with Sections R405.3.2.1 and R405.3 R405.3.2.1 Compliance report for permit application. A compliance report submitted with the application for building permit shall include all of the following: 38 pdf_text
5 5. EFFICIENT WATER HEATING OPTIONS Only one option from Items 5.3 through 5.8 may be selected in this category. Items 5.1 and 5.2 may be combined with any option. 52 pdf_text
5 5. The basement or attic shall be counted as a story when it contains the water heater. 44 pdf_text
5 5. A certificate indicating that the proposed design complied with Section R405.2. The certific shall document the building components’ energy specifications that are included in the calculation including: component-level insulation R-values or U-factors; duct system and building envelope air leakage testing assumptions; and the type and rated efficiencies of proposed heating, cooling, mechanical ventilation and service water-heating equipment to installed. If on-site renewable energy systems will be installed, the certificate shall report th type and production size of the proposed system. Additional documentation reporting estim annual energy production shall be provided. 38 pdf_text
5 5. Ductwork located within exterior walls of the building thermal envelope shall comply with the following: 32 pdf_text
5 5. Roofs without insulation in the cavity and where the sheathing or insulation is exposed du reroofing shall be insulated either above or below the sheathing. 60 pdf_text
5 5. Fireplaces Exception: Any fireplace with on-demand, intermittent or interrupted ignition (as define ANSI Z21.20) is not considered continuous. R403.2 Hot water boiler temperature reset. The manufacturer shall configure each gas, oil and ele boiler (other than a boiler equipped with a tankless domestic water heating coil) with an automatic me of adjusting the water temperature supplied by the boiler to ensure incremental change of the inferred heat load will cause an incremental change in the temperature of the water supplied by the boiler. Thi can be accomplished with outdoor reset, indoor reset or water temperature sensing. R403.3 Ducts. Ducts and air handlers shall be installed in accordance with Sections R403.3.1 throug R403.3.7. R403.3.1 Ducts located outside conditioned space Supply and return ducts located outside conditioned space shall be insulated to an R-value of not less than R-8 for ducts 3 inches (76 mm) i diameter and larger and not less than R-6 for ducts smaller than 3 inches (76 mm) in diameter. Duc buried beneath a building shall be insulated as required per this section or have an equivalent ther distribution efficiency. Ducts within a concrete slab or in the ground shall be insulated to R-10 with insulation designed to be used below grade. Underground ducts utilizing the thermal distribution efficiency method shall be listed and labeled to indicate the R-value equivalency. R403.3.2 Ducts located in conditioned space. For ducts to be considered a 31 pdf_text
5 5. A site-specific energy analysis report that is in compliance with Section R405.2. 40 pdf_text
5 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 27 pdf_text
5 5. Mechanical system design criteria. 2 pdf_text
5 5. The types, sizes and efficiencies of heating, cooling, whole-house mechanical ventilation, and service water heating appliances. Where a gas-fired unvented room heater, electric furnace, or baseboard electric heater is installed in the residence, the certificate shall list "gas-fired unvent room heater," "electric furnace" or "baseboard electric heater," as appropriate. An efficiency sh not be listed for gas-fired unvented room heaters, electric furnaces or electric baseboard heater 19 pdf_text
5 (cont. 2) the final elevation of nearest exterior grade. SMALL BUSINESS. Any business entity (including a sole proprietorship, corporation, partnership or othe legal entity) which is owned and operated independently from all other businesses, which has the purpose of making a profit, and which has fifty or fewer employees. SOLAR HEAT GAIN COEFFICIENT (SHGC). The ratio of the solar heat gain entering the space through the fenestration assembly to the incident solar radiation. Solar heat gain includes directly transmitted sola heat and absorbed solar radiation which is then reradiated, conducted or convected into the space. STANDARD FRAMING. All framing practices not defined as "intermediate" or "advanced" shall be consid standard. (See Advanced Framed Wall, Intermediate Framed Wall). STANDARD REFERENCE DESIGN. A version of the proposed design that meets the minimum requirement this code and is used to determine the maximum annual energy use requirement for compliance base on total building performance. THERMAL DISTRIBUTION EFFICIENCY (TDE). The resistance to changes in air heat as air is conveyed thro a distance of air duct. TDE is a heat loss calculation evaluating the difference in the heat of the air between the air duct inlet and outlet caused by differences in temperatures between the air in the duc and the duct material. TDE is expressed as a percent difference between the inlet and outlet heat in t duct. THERMAL ISOLATION. Physical and space conditioning separation fro 11 pdf_text
5 (cont. 2) s being located inside conditioned space, such ducts shall comply with one of the following: 31 pdf_text
5 (cont. 3) m conditioned space(s). The conditioned space(s) shall be controlled as separate zones for heating and cooling or conditioned by separate equipment. 11 pdf_text
5.1 5.1 A drain water heat recovery unit(s) shall be installed, which captures waste water heat from at least two showers, including tub/shower combinations. It is acceptable, but not required, for sink water to be connected. Unit shall have a minimum efficiency of 40% if installed for equal flow or a minimum efficiency of 54% if installed for unequal flow. Such units shall be rated in accordance with CSA B55.1 or IAPMO IGC 52 pdf_text
5.1 5.1. A continuous air barrier installed between unconditioned space and the duct. 32 pdf_text
5.2 5.2 For Compact Hot Water Distribution system credit, the volume shall store not more than 16 ounces of water between the nearest source of heated water and the termination of the fixture supply pipe where calculated using Section R403.5.2. Construction documents shall indicate the ounces of water in piping between the hot water source and the termination of the fixture supply. When the hot water source is the nearest primed plumbing loop or trunk, this must be primed with an On Demand recirculation pump and must run a dedicated ambient return line from the furthest fixture or end of loop to the water heater. To qualify for this credit, the dwelling must have a minimum of 1.5 bathrooms. 52 pdf_text
5.2 5.2. Minimum R-10 insulation installed in the cavity width separating the duct from the outside sheathing. 32 pdf_text
5.3 5.3 Water heating system shall include the following: Energy Star rated gas or propane water heater with a minimum UEF of 52 pdf_text
5.3 5.3. The remainder of the cavity insulation shall be fully insulated to the drywall side. R403.3.3 Ducts buried within ceiling insulation. Where supply and return air ducts are partially o completely buried in ceiling insulation, such ducts shall comply with all of the following: 32 pdf_text
5.4 5.4 Water heating system shall include one of the following: Energy Star rated gas or propane water heater with a minimum UEF of 52 pdf_text
5.5 5.5 Water heating system shall include one of the following: Gas-fired heat pump water heater(s) meeting Tier 2 of the NEEA Advanced Water Heating Specification for Gas-Fueled Residential Storage Water Heaters Version 1.0. or For R-2 Occupancy, gas-fired heat pump water heater(s) meeting Tier 2 of the NEEA Advanced Water Heating Specification for Gas-Fueled Residential Storage Water Heaters Version 1.0. shall supply domestic hot water to all units. or For R-2 Occupancy, gas-fired heat pump water heater(s) meeting ANSI Z21.40.2 and Z21.40.4 or CSA, with a minimum UEF of 1.15, shall supply domestic hot water to all units. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency and, for solar water heating systems, the calculation of the minimum energy savings. 53 pdf_text
5.6 5.6 Water heating system shall include one of the following: Electric heat pump water heater meeting the standards for Tier III of NEEA's advanced water heating specification or For R-2 Occupancy, electric heat pump water heater(s), meeting the standards for Tier III of NEEA's advanced water heating specification, shall supply domestic hot water to all units. If one water heater is serving more than one dwelling unit, all hot water supply and recirculation piping shall be insulated with R-8 minimum pipe insulation. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency. 53 pdf_text
5.7 5.7 Water heating system shall include one of the following: Electric heat pump water heater with a minimum UEF of 2.9 and utilizing a split system configuration with the air-to-refrigerant heat exchanger located outdoors. Equipment shall meet Section 4, requirements for all units, of the NEEA standard Advanced Water Heating Specification with the UEF noted above or For R-2 Occupancy, electric heat pump water heater(s), meeting the standards for Tier III of NEEA's advanced water heating specification and utilizing a split system configuration with the air-to-refrigerant heat exchanger located outdoors, shall supply domestic hot water to all units. If one water heater is serving more than one dwelling unit, all hot water supply and recirculation piping shall be insulated with R-8 minimum pipe insulation. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency. 53 pdf_text
5.8 5.8 Combination water heating and space heating system shall include one of the following: Gas-fired heat pump water heater(s) meeting Tier 2 of the NEEA Advanced Water Heating Specification for Gas-Fueled Residential Storage Water Heaters Version 1.0. or For R-2 Occupancy, gas-fired heat pump water heater(s) meeting Tier 2 of the NEEA Advanced Water Heating Specification for Gas-Fueled Residential Storage Water Heaters Version 1.0., shall supply all units. or For R-2 Occupancy, gas-fired heat pump(s) meeting ANSI Z21.40.2 and Z21.40.4 or CSA, with a minimum UEF of 1.15, shall supply all units. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall specify the water heater equipment type and the minimum equipment efficiency and, for solar water heating systems, the calculation of the minimum energy savings. 54 pdf_text
50 50 Pascals, or for R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested air leakage to 0.20 cfm/ft2 maximum at 50 Pascals and All whole house ventilation requirements as determined by Section M1505.3 of the International Residential Code or Section 403.8 of the International Mechanical Code shall be met with a heat recovery ventilation system with minimum sensible heat recovery efficiency of 48 pdf_text
50 50 percent glazed shall be permitted to satisfy the SHGC requirements. R402.3.3 Glazed fenestration exemption. Up to 15 square feet (1.4 m2) of glazed fenestration per dwelling unit shall be permitted to be exempt from U-factor and SHGC requirements in Section R402.1.2. This exemption shall not apply to the Total UA alternative in Section R402.1.5. R402.3.4 Opaque door exemption. One side-hinged opaque door assembly up to 24 square feet ( m2) in area is exempted from the U-factor requirement in Section R402.1.2. This exemption shall n apply to Total UA alternative in Section R402.1.5. 25 pdf_text
50 50 Pascals, or for R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested air leakage to 0.15 cfm/ft2 maximum at 50 Pascals and All whole house ventilation requirements as determined by Section M1505.3 of the International Residential Code or Section 403.8 of the International Mechanical Code shall be met with a heat recovery ventilation system with minimum sensible heat recovery efficiency of 49 pdf_text
50 50 Pascals, or for R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested air leakage to 0.25 cfm/ft2 maximum at 50 Pascals and All whole house ventilation requirements as determined by Section M1505.3 of the International Residential Code or Section 403.8 of the International Mechanical Code shall be met with a heat recovery ventilation system with minimum sensible heat recovery efficiency of 48 pdf_text
500 500 New Jersey Avenue, NW 64 pdf_text
5060 5060 Spectrum Way Mississauga, Ontario, Canada L4W 5N6 Standard R reference number Title sectio AAMA/WDMA/CSA 63 pdf_text
515.1 515.1—2012 IEEE Standard for the Testing, Design, Installation and Maintenance of Electrical Resistance Trace Heating for Commercial Applications ............................................................................. R ISO International Organization for Standardization 64 pdf_text
55.2 55.2 or IAPMO PS 92. Drain water heat recovery units shall be in accordance with CSA 55.1 or IAP IGC 346-2017. R403.5.5 Water heater installation location. Service hot water systems shall be installed within th building thermal envelope. Exceptions: 34 pdf_text
5B 5B Walla Walla 13 pdf_text
5B 5B Pend Oreille 13 pdf_text
6 6. Supply and return registers, if installed at the time of the test, shall be fully open. Exception: Additions less than 500 square feet of conditioned floor area. TABLE R402.4.1.1 AIR BARRIER, AIR SEALING AND INSULATION INSTALLATIONa COMPONENT AIR BARRIER CRITERIA INSULATION CRITERIA General Requirements A continuous air barrier shall be installed in the building envelope. Breaks or joints in the air barrier shall be sealed. Air-permeable insulation shall not used as a sealing material. Cavity insulation installation 27 pdf_text
6 6. Where on-site photovoltaic panel systems have been installed, the array capacity, inverter efficiency, panel tilt, orientation and estimated annual electrical generation shall be noted on th certificate. 19 pdf_text
6 6. Compliance shall be demonstrated by providing a drawing on the plans that shows the hot water distribution system rectangle(s), comparing the area of the rectangle(s) to the area of the dwelling identifying the appropriate compactness ratio and HWDS factor. 44 pdf_text
6 6% glazed fenestration (22 in. x 8 in. lite) – 16 pdf_text
6 6. Mechanical and service water heating system and equipment types, sizes and efficiencies. 2 pdf_text
6 6. RENEWABLE ELECTRIC ENERGY OPTION 54 pdf_text
6 6. Surface-applied window film installed on existing single pane fenestration assemblies to reduce solar heat gain provided the code does not require the glazing fenestration to be replaced. R503.1.1.1 Replacement fenestration. Where some or all of an existing fenestration unit is repl with a new fenestration product, including sash and glazing, the replacement fenestration unit sh meet the applicable requirements for U-factor and SHGC in Table R402.1.3. Where more than o replacement fenestration unit is being installed, an area-weighted average of the U-factor and SH of all replacement fenestration shall be permitted to be used to demonstrate compliance. R503.1.2 Heating and cooling systems. New heating, cooling and duct systems that are part of th alteration shall comply with Section R403. Exceptions: 60 pdf_text
6 6. When a site-specific report is not generated, the proposed design shall be based on the wo case orientation and configuration of the rated home. 38 pdf_text
6 6. A final confirmed certificate indicating compliance based on inspection, and a statement indicating that the confirmed rated design of the built home complies with Section R405.2. certificate shall report the energy features that were confirmed to be in the home, including component level insulation R-values or U-factors; results from any required duct system an building envelope air leakage testing; and the type and rated efficiencies of the heating, cooling, mechanical ventilation and service water-heating equipment installed. 40 pdf_text
6 (cont. 2) All cavities in the thermal envelope shall be filled with insulation. The density of the insulation shall be at manufacturers' product recommendation and said density shall be maintained for all volume each cavity. Batt type insulation wi show no voids or gaps and maintai an even density for the entire cavit Batt insulation shall be installed in recommended cavity depth. Wher obstruction in the cavity due to services, blocking, bracing or othe obstruction exists, the batt product be cut to fit the remaining depth of cavity. Where the batt is cut aroun obstructions, loose fill insulation sh be placed to fill any surface or concealed voids, and at the manufacturers’ specified density. Where faced batt is used, the installation tabs must be stapled to the face of the stud. There shall be compression to the batt at the edg of the cavity due to inset stapling installation tabs. Insulation that upon installation rea conforms to available space shall installed filling the entire cavity and within the manufacturers' density recommendation. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the insulation and any gaps in the air barrier sealed. Access openings, drop down stair or knee wall doors to unconditioned attic spaces shall be sealed. The insulation in any dropped ceiling/soffit shall be aligned with t air barrier Batt insulation installed in attic roof assemblies may be compressed at exterior wall lines to allow for requ 27 pdf_text
6 (cont. 3) i attic ventilation. Walls The junction of the foundation and sill plate shall be sealed. The junction of the top plate and top of exterior walls shall be sealed. Knee walls shall be sealed. Cavities within corners and header frame walls shall be insulated by completely filling the cavity with a material having a thermal resistan of R-3 per inch minimum. Exterior thermal envelope insulatio for framed walls shall be installed i substantial contact and continuous alignment with the air barrier. 27 pdf_text
6.1 6.1 For each 600 kWh of electrical generation per housing unit provided annually by on-site wind or solar equipment a 0.5 credit shall be allowed, up to 4.5 credits. Generation shall be calculated as follows: For solar electric systems, the design shall be demonstrated to meet this requirement using the National Renewable Energy Laboratory calculator PVWATTs or alternative approved by the code official. Documentation noting solar access shall be included on the plans. For wind generation projects designs shall document annual power generation based on the following factors: The wind turbine power curve; average annual wind speed at the site; frequency distribution of the wind speed at the site and height of the tower. To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall show the photovoltaic or wind turbine equipment type, provide documentation of solar and wind access, and include a calculation of the minimum annual energy power production. 54 pdf_text
600 600 Pennsylvania Avenue NW Washington, DC 20580 Standard R reference number Title sectio CFR Title 16—2015 R-value Rule ....................................................................................................... 65 pdf_text
6305 6305 Ivy Lane, Suite 140 Greenbelt, MD 20770 Standard R reference number Title sectio 65 pdf_text
6t 6th Floor Washington, DC 20001 Standard R reference number Title sectio ANSI/APSP/ICC 14—2019 American National Standard for Portable Electric Spa Energy Efficiency ............. ANSI/APSP/ICC 15a— 64 pdf_text
7 7. The code edition under which the structure was permitted, and the compliance path used. The code official may require that documentation for any required test results include an electronic record of the time, date and location of the test. A date-stamped smart phone photo or air leakage tes software may be used to satisfy this requirement. 19 pdf_text
7 7. Where on-site renewable energy systems have been installed, the certificate shall report th type and production size of the installed system. Additional documentation reporting estima annual energy production shall be provided. R405.4 Calculation procedure. Calculations of the performance design shall be in accordance with Sections R405.4.1 and R405.4.2. R405.4.1 General. Except as specified by this section, the standard reference design and propose design shall be configured and analyzed using identical methods and techniques. R405.4.2 Residence specifications. The standard reference design and proposed design shall be configured and analyzed as specified by Table R405.4.2(1). Table R405.4.2(1) shall include by reference all notes contained in Table R402.1.3. 40 pdf_text
7 7. APPLIANCE PACKAGE OPTION 54 pdf_text
7 7. Equipment and systems controls 2 pdf_text
7.1 7.1 All of the following appliances shall be new and installed in the dwelling unit and shall meet the following standards: 54 pdf_text
70 70—20 National Electrical Code ........................................................................................ NFRC National Fenestration Rating Council, Inc. 65 pdf_text
8 8. Duct sealing, duct and pipe insulation and location. 2 pdf_text
9 9. Air sealing details. R103.2.1 Building thermal envelope depiction. The building’s thermal envelope shall be represe on the construction documents. R103.3 Examination of documents. The code official shall examine or cause to be examined the accompanying construction documents and shall ascertain whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances. code official is authorized to utilize a registered design professional or other approved entity not affilia with the building design or construction in conducting the review of the plans and specifications for compliance with the code. R103.3.1 Approval of construction documents. When the code official issues a permit where construction documents are required, the construction documents shall be endorsed in writing and stamped "Reviewed for Code Compliance." Such approved construction documents shall not be changed, modified or altered without authorization from the code official. Work shall be done in accordance with the approved construction documents. One set of construction documents so reviewed shall be retained by the code official. The other se shall be returned to the applicant, kept at the site of work and shall be open to inspection by the co official or a duly authorized representative. R103.3.2 Previous approvals. This code shall not require changes in the construction documents, construction or designated occupancy o 2 pdf_text
9 (cont. 2) f a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good fai within 180 days after the effective date of this code and has not been abandoned. R103.3.3 Phased approval. The code official shall have the authority to issue a permit for the construction of part of an energy conservation system before the construction documents for the en system have been submitted or approved, provided adequate information and detailed statements been filed complying with all pertinent requirements of this code. The holders of such permit shall proceed at their own risk without assurance that the permit for the entire energy conservation syste will be granted. 2 pdf_text
905 905 Plum Street SE, Bldg 3 PO Box 43165 Olympia, WA 98506-3166 Standard R reference number Title sectio WSU RS 33 Duct Testing Standard for New and Existing Construction Publication No. WSUEEP12-016 ...................................................................... R 66 pdf_text
916-18 916-18 Airflow Test Procedure ....................................................................................... ICC International Code Council, Inc. 64 pdf_text