| Label | Text | Page | Extraction method |
| 04-18 |
04-18. Passed 9-7-04; Ord. 09-09. Passed 6-8-09.) |
2 |
pdf_text |
| 1 |
1 & 2 Family Dwelling
$70
Commercial
$105
Propane Tank & Piping 1 & 2 Family Dwelling
$70
Propane Tank & Piping Commercial
$70
Additional Reinspections per Inspection
$30
Mechanical Permit (2 Inspections)
Central Heating 1 & 2 Family Dwelling
$70
Central Heating Commercial
$105
Commercial Duct Installation Only
$170
Motor Fuel & Fuel Oil Storage Tanks
$155
Additional Reinspections per Inspection
$30
Electrical Permit (2 Inspections)
Service Equipment 0-400 amps
$70
Service Equipment >400 amps
$100
Sub-Panels
$40
Fixtures, Receptacles Circuits 1 & 2 Family Dwelling
$70
Fixtures, Receptacles Circuits Commercial
$100
Electric Signs
$55
Motors & Generators
$40
Electric Heating & Air Conditioning
$25
Miscellaneous
$70
Additional Reinspections per Inspection
$30
Commercial Plan Review (Per Review)
up to 50,000 sf
$425 |
4 |
pdf_text |
| 1410 |
1410 09
FEE SCHEDULE |
2 |
pdf_text |
| 1410.01 |
1410.01 Adoption by reference; file and distribution copies. |
1 |
pdf_text |
| 1410.01 |
1410.01 ADOPTION BY REFERENCE; FILE AND DISTRIBUTION COPIES.
(a) For the purpose of establishing rules and regulations for the inspection, construction, alteration, repair, re
demolition of buildings and structures not otherwise regulated in this Chapter - Building and Housing Code, for t
installation of equipment, for the establishment of fees and for the imposition of penalties for violations, those p
certain building code known as the Virginia Uniform Statewide Building Code, as amended, which portions are
identified and set forth in subsection (b) hereof, are hereby adopted and incorporated as fully as if set out at len
and from the date on which this chapter takes effect, the provisions of such Building Code shall be controlling in
contained therein, and from such effective date all ordinances enacted prior hereto regulating the construction
of buildings and structures are superseded.
(b) The following portions of the Virginia Uniform Statewide Building Code are hereby adopted for enforcem
County:
(1) "New Construction Code," in its entirety; and
(2) "Virginia Maintenance Code," including and expressly limited to: |
1 |
pdf_text |
| 1410.02 |
1410.02 PENDING PROCEEDINGS.
Nothing in this chapter shall be construed to affect any suit or proceeding now pending in any court, or any rig
or liability incurred, or any cause of action accrued or existing under any act or ordinance repealed hereby, nor
right or remedy of any character in existence prior to the adoption of this chapter be lost, impaired or affected b
chapter.
(Ord. 82-07. Passed 5-17-82; Ord. 03-06. Passed 7-8-03.) |
2 |
pdf_text |
| 1410.02 |
1410.02 Pending proceedings. |
1 |
pdf_text |
| 1410.03 |
1410.03 INTERPRETATION.
Nothing in this chapter shall be construed to supersede the Zoning Administrator's authority under the Zoning
matters outside of the manner of construction or materials to be used in the erection, alteration or repair of a bu
structure.
(Ord. 82-07. Passed 5-17-82; Ord. 03-06. Passed 7-8-03.) |
2 |
pdf_text |
| 1410.04 |
1410.04 EFFECTIVE DATE.
Amendments and changes to this chapter shall be effective as of the date of adoption.
(Ord. 87-09. Passed 7-20-87; Ord. 03-06. Passed 7-8-03.) |
2 |
pdf_text |
| 1410.04 |
1410.04 Effective date; repealer. |
1 |
pdf_text |
| 1410.05 |
1410.05 Amendments. (Repealed) |
1 |
pdf_text |
| 1410.05 |
1410.05 AMENDMENTS. (REPEALED)
(EDITOR'S NOTE: Section 1410.05 was repealed by Ordinance 03-06, passed July 7, 2003.) |
2 |
pdf_text |
| 1410.06 |
1410.06 PLUMBING BOARD. (REPEALED)
(EDITOR'S NOTE: Section 1410.06 was repealed by Ordinance 03-06, passed July 7, 2003.) |
2 |
pdf_text |
| 1410.06 |
1410.06 Plumbing Board. (Repealed) |
1 |
pdf_text |
| 1410.07 |
1410.07 ELECTRICAL BOARD. (REPEALED)
(EDITOR'S NOTE: Section 1410.07 was repealed by Ordinance 03-06, passed July 7, 2003.) |
2 |
pdf_text |
| 1410.07 |
1410.07 Electrical Board. (Repealed) |
1 |
pdf_text |
| 1410.08 |
1410.08 ENFORCEMENT.
(a) Generally. The Department of Building and Development through the "Building Official" is hereby design
building department for the purposes of enforcement of the "New Construction Code," and the unsafe structure
of the "Property Maintenance Code" of the Uniform Statewide Building Code. The Department of Building and
through the "Building Maintenance Official" is hereby further designated as the enforcing agency with respect to
portions of the "Property Maintenance Code," of the Uniform Statewide Building Code, which are identified and
this chapter, unless enforcement is expressly assigned to another agency.
(b) Administration. The Building Official and the Building Maintenance Official shall establish such procedure
requirements with regards to their respective sections of the Code as may be necessary for the administration
enforcement of this chapter.
(Ord. 87-09. Passed 7-20-87; Ord. 91-23. Passed 9-17-91; Ord. 03-06. Passed 7-8-03; Ord. 04-18. Passed 9-7 |
2 |
pdf_text |
| 1410.09 |
1410.09 Fee schedule. |
1 |
pdf_text |
| 1410.09 |
1410.09 FEE SCHEDULE.
(a) All permits issued under this chapter requiring the payment of a fee, shall be issued by the Building Offici
designated agent.
(b) A schedule of fees shall apply to permits issued under this chapter and plan reviews, which shall include
under the Virginia Code. This schedule will be published and updated, as needed, by the Department of Buildin
Development, and is set forth in Appendix A of this chapter.
(c) For new buildings and commercial additions, the fee shall be based on the Building Valuation Data Repo
published in the Building Official and Code Administrator Magazine, to be updated July 1 of each year to confor
latest published Building Valuation Data Report. Type R4 fees shall be the same as R3. This fee includes all as
trade permit fees. For all other permits under this chapter, fees shall be established and amended from time to t
Board of Supervisors.
(d) Notwithstanding the provisions of this chapter, the Loudoun County Government, Loudoun County Public
the incorporated Towns within Loudoun County, Loudoun County Sanitation Authority, and the Fire and Rescue
serving Loudoun County shall be exempt from fees collected pursuant to this chapter.
(Ord. 03-06. Passed 7-8-03; Ord. 22-07. Passed 7-14-21.) |
3 |
pdf_text |
| 1410.10 |
1410.10 APPEALS.
The County Board of Building Code Appeals is hereby designated as the board to hear appeals arising from t
enforcement of the "New Construction Code," and those portions of the "Property Maintenance Code" of the Un
Statewide Building Code, that the Department of Building and Development is responsible for regulation and en
pursuant to this chapter. No appeal to the State Building Code Technical Review Board shall lie prior to a final
by the County Board of Building Code Appeals.
(Ord. 87-09. Passed 7-20-87; Ord. 03-06. Passed 7-8-03; Ord. 04-18. Passed 9-7-04.) |
3 |
pdf_text |
| 1410.99 |
1410.99 PENALTY.
(a) Any violation of this chapter may be deemed a civil violation in lieu of criminal sanctions and upon an ad
finding of liability, shall be punishable to the fullest extent as allowed by the Code of Virginia or by a fine of one
dollars ($100.00) for the first violation and one hundred fifty dollars ($150.00) for each additional violation, whic
greater. Each day during which the violation is found to have existed shall constitute a separate offense. Howev
event shall specified violations arising from the same operative set of facts be charged more frequently than on
day period, and in no event shall a series of specified civil violations arising from the same operative set of fact
civil penalties which exceed the amount allowed under the Virginia Code, or a total of three thousand dollars ($
whichever is greater. Nothing in this chapter shall be construed as to prohibit the Building Official or the Buildin
Maintenance Official from initiating civil injunction procedures in cases of repeat offenses or health and safety
(b) After having served a notice of violation on any person or entity committing or permitting a violation unde
and if such violation has not ceased within such reasonable time as is specified in said notice, the Building Offic
Building Maintenance Official, or the designated personnel shall cause two copies of the summons or ticket to b
certified mail to such person or entity. If the person or entity complies in writing to a noti |
3 |
pdf_text |
| 1410.99 |
1410.99 Penalty.
App. A Virginia Uniform Statewide Building and Housing Code Fee Schedule
CROSS REFERENCES
Statewide Building Code - see Code of Va. ยงยง 36-98, 36-98.3, 36-99, 36-104, 36-105, 36-106
Fences - see GEN. OFF. 618.01
Design and construction of swimming pools - see B.R. & T. 838.23 et seq.
Addressing of premises - see S.U. & P.S. Ch. 1026
Construction of sewers - see S.U. & P.S. Ch. 1060, 1064.10 et seq., Ch. 1070
Improvements in subdivisions - see P. & Z. Ch. 1245 |
1 |
pdf_text |
| 1410.99 (cont. 2) |
ce of violation, and agre
to cease such violation, no further penalty fines shall be levied after the date of said agreement, provided the a
fully complied with within the time specified in said agreement.
(c) The summons shall provide that any person or entity summoned for a violation may elect to pay the civil
making an appearance in person or in writing to the County Treasurer's office at least 72 hours prior to the time
fixed for trial and enter a waiver of trial, admit liability, and pay the civil penalty established for the offense charg
summons shall provide that a signature to an admission of liability shall have the same force and effect as a jud
court, however, said admission is limited to civil actions and shall not be deemed an admission in a criminal pro
(d) If a person or entity charged with a violation does not elect to enter a waiver of trial and admit liability, the
shall be tried in general district court in the same manner and with the same right of appeal as provided by law.
(Ord. 82-07. Passed 5-17-82; Ord. 03-06. Passed 7-8-03; Ord. 04-18. Passed 9-7-04.)
APPENDIX A. VIRGINIA UNIFORM STATEWIDE BUILDING AND HOUSING CODE FEE SCHEDULE
Effective July 1, 2022 |
3 |
pdf_text |
| 251 |
251,000 - 350,000 sf
$820
> 350,000 sf
$1,220
Individual Trade Review for new, alterations &
additions
$65
Residential Plan Review (Per Review)
New Construction 1 & 2 Family Dwelling
$170
R-3, R-4 and R-5 additions and alterations
$130
Fire Permit
Fire Alarm System
$250
Sprinkler System
$240
Kitchen Hood/Wet Chemical System
$250
Dry Chemical Systems
$420
Fire Extinguishers
$90
Fire Lanes (FMO FEE)
$120
Foam, CO2 Clean Agent
$360
(Ord. 22-07. Passed 7-14-21.) |
4 |
pdf_text |