Plan Review Copilot
← back
Clauses

Redmond, WA — Residential Application Packet 202607201053310802

(jurisdiction reference document) / - / - / pdf_2d

26 clause(s)

LabelTextPageExtraction method
1 1. You submit a complete application in that calendar year; and 8 pdf_text
15.06.024 15.06.024)? Will there be a 100% or greater increase in gross square footage (RMC 15.06.024)? Has a non-conforming structure been destroyed, damaged or incurred a loss equal to or greater than 50 percent of its **King County assessed value (RMC 15.06.024)? All ne dwell ing re SP * So and may Sprin Ordi For about and per 3 pdf_text
2 2. The building permit is issued within one year from the date application is deemed compl *If additional gross floor area (GFA) is added after payment, additional PIL fees will be required at the applic the time of assessment. **If gross floor area is reduced after payment, no refund of PIL fees may be issued. FEES DUE Affordable Housing Payment in Lieu (AHPIL) Fees for individually permitted single-family develop be paid at building permit issuance or before the Sheetrock Nailing (441) inspection can be sche ___ Pay at building permit issuance ___ Defer to Sheetrock Nailing - deferred fee request form is By signing below, the applicant acknowledges that the calculations of the existing gross floor are proposed floor area are correct. PROJECT INFORMATION Project Address: ________________________________________________________________________ Parcel Number: _________________________________________ Total # of Dwelling Units: ______ Proposed GFA: _______________ Existing GFA: ________________ GFA Net New Total: _____ (Calculation: Proposed GFA sq ft – Existing GFA sq ft = GFA Net New Total) Applicant Name (Print): _______________________________________________________ Date: ___ Signature: ______________________________________________________________________________ Reference: Affordable Housing RZC 21.20 Published: 07/2026 8 pdf_text
30 30)? Do the total construction costs on all building permits within a three year period exceed the King County assessed value** of the structure at the beginning of the three year period (RMC 3 pdf_text
425 425 * For additions to existing homes resulting in a total existing plus new square footage (SF) over 3,600 SF, fire sprinklers will be Existing SF totals are based on King County Assessor information. The total SF includes: dwelling, covered decks, covered porc tached garages. Detached garages located ten feet (10’) or less from the residence shall also be included in the total SF calcula ** King County Assessor Value can be found at: King County Department of Assessments: eReal Property Published: 07/2026 3 pdf_text
full-text Building Permits: Waste Reporting Requireme Waste Plan Once your building permit is approved, se project on our online waste tracking plat It will walk you through creating a waste pl The project’s waste plan will identify: • how much waste you expect to generate • what materials you plan to dispose or re • and where you plan to take construction Notice of nondiscrimination is available at redmon 无歧视声明可在本市的网址 redmond.gov/ El aviso contra la discriminación está disponible en redmon Reporting Site Waste from construction projects must be reported on our online platform. See our reporting guide. Throughout construction, report waste and upload waste tickets on our online platform. There is no requirement for recycling or salvage. Construction debris must be taken to designated facilities (see list). Waste reporting must be completed before the permit can receive final inspection approval and a Certificate of Occupancy can be issued. redmond.wastetracking. Waste Reporting More information at redmond.gov/cdwaste Applies to per applications submitted on after May 1, 20 Published: 07/2026 5 pdf_text
full-text Last updated 12/2014 O:/Building/BLDGFGRMS/Permit Applications/Current Forms Office Use Only Date ______________________ LAND______________________ BLDG______________________ The City of Redmond adopted an amendment to the City’s fire, park, school, and tr portation impact fee regulations to provide for such fees to be paid at the time of d inspection, instead of at the time of building permit issuance. Impact fees for individually permitted single family attached or detached residentia struction shall be paid prior to drywall or sheetrock inspection consistent with a build permit approval. After November 28, 2016 impact fees shall be paid at the time of ing permit issuance. Impact fees for all other development types shall be paid prior the issuance of a building permit consistent with a development approval. NOTICE: Impact fees are updated on an annual basis; therefore if you choose to payment of impact fees to the drywall inspection, the fee in effect at the time of SHEET ROCK NAILING INSPECTION will be required to be paid. By signing below you acknowledge that impact fees are due at drywall or sheetrock inspection. Address Parcel Number Print Name Date Signature Adopted by Ordinance 2587 Deferred Impact Fee Request redmond.gov/Building Published: 07/2026 10 pdf_text
full-text DEFERRED AFFORDABLE HOUSING PAYMENT IN LIEU (AHPIL) FEE REQUEST FORM *This form is only required if you choose to defer payment of AHPIL fees* Affordable Housing Payment in Lieu (AHPIL) Fees for individually permitted single-family development can be paid at building permit issuance or before the Sheetrock Nailing (4 inspection can be scheduled. See fee schedule: Affordable Housing Payment In Lieu Schedule By signing below, you acknowledge that the Affordable Housing Payment in Lieu Fee is d the sheetrock nailing inspection can be scheduled. If payment is made more than one after the application has been deemed complete, the fee in effect at the time of the sheetrock nailing inspection will be required. Project Address: ________________________________________________________________ Parcel Number: _______________________________________ Permit Number: _________ Applicant Name (Print): ______________________________________________ Date: _____ Signature: ______________________________________________________________________ Reference: Affordable Housing RZC 21.20 Published: 07/2026 9 pdf_text
full-text RCW 18.27.010 - Definitions Contractor includes any person, firm, corporation, or other entity who or which, in the pursuit of an ind business undertakes to, or offers to undertake, or submits a bid to construct, alter, repair, add to, subtract from, develop, move, wreck, or demolish any building highway, road, railroad, excavation or other structure project, development, or improvement attached to real estate or to do any part thereof including the installation of carp other floor covering, the erection of scaffolding or other structures or works in connection therewith, the installa repair of roofing or siding, performing tree removal services, or cabinet or similar installation; or, who, to do sim upon his or her own property, employs members of more than one trade upon a single job or project or under building permit except as otherwise provided in this chapter. Also includes a consultant acting as a general cont Includes any person, firm, corporation, or other entity covered by this subsection (1), whether or not registered under this chapter or who are otherwise required to be registered or licensed by law, who offer to sell their pro occupying or using the structure, project, development, or improvement was substantially completed or aband person, firm, corporation or other entity is not a contractor under this subsection (1)(c) if the person, firm corpor other entity contracts with a registered general contractor and does not superintend the work. 7 pdf_text
full-text Apply for Permits Online: Submit a request for a permit through the PRO (Plan Review Online) portal. Once your permit request is processed, you will receive detailed instruction about how to upload the submittal documents. Application forms and information can be found here: Development Services Center | Redmond, WA Electronic Plan Standards: Files that are improperly named or formatted incorrectly may be rejected at intake. Paper plans, incomplete applications and applications delivered by courier will not be accepted and will the application being deemed incomplete. • All plans must be drawn to scale and have scale noted on each sheet • All documents must be uploaded as a PDF • All plans must be uploaded in landscape orientation (horizontal position) • All plans must be named accordingly per the submittal requirements in BOLD • All plans must be flattened and reduced 1 pdf_text
full-text PLANNING DEPARTMENT INFORMATION For more information, contact: PlannerOnCall@redmond.gov or 425-556-2494 ALL NEW RESIDENTIAL homes in a plat are required to comply with the Planning Only Requirements on Page 2. See Permit Guide for more information. Associated Plat or Short Plat: LAND #: _______________________________ Lot #: ______________________ Tree Removal:  Yes  No Exception Request:  Yes  No Arborist Report Provided:  Y Submittal Requirement: New Home Addition Remodel— square f Application Form Yes Yes Ye Energy Code Information Yes Yes If appli Site Plan Yes Yes Vicinity Plans Yes Yes Ye Structural Calculations Not required if infor- mation is straight out of the IBC or IRC. Not required if infor- mation is straight out of the IBC or IRC. If appli Landscape Drawings Only required in spe- cific neighborhoods — — Footing Plan Yes Yes If appli Deck Framing Plan If applicable If applicable If appli Copy of recorded final plat document Yes — — Geotechnical Engineering Report (if applicable) Yes Yes — King County Health Approval — If applicable If appli SUBMITTAL REQUIREMENTS BY PERMIT TYPE Published: 07/2026 4 pdf_text
full-text I will be performing work on my own property or property I own but do not reside in an performing activities of a contractor on my own property for the purpose of selling, dem or leasing the property. 6 pdf_text
full-text Company name: ____________________________________________ Email: __________________________ Phone: ___________________ Mailing address: ____________________________________________ City ____________________ State: ____________ Zip: ____________ UBI # _____________________________________________________ State contractor’s license #: __________________________________ Expiration date: ____________________________________________ Value of Construction & King County Assessors Improvem The value of construction shall be based on the value of the work performed. The total value of work shall include materials and lab for or not, but does not include the value of any mechanical, elec ing permits. Value of Construction: $ _________________________ For Additions: Portion of value for addition $ _______ Portion of value for remodel: $ ______ Interior Work Only?  Yes  No Taxable Improvements Value: $ ________________ Find this value here: King County Department of Assessments: e Search for your property, then click on the “Property Detail” tab. find the “Taxable Imps Value” for the current year. 11 pdf_text
full-text For more detailed submittal information see the Building Permit Guide Demolition, mechanical, electrical, plumbing and fire permits are applied for separately. Planning Requirements for New Single Family Residential buildings only: Include Building Orientation, Transition Area, Primary Features and Secondary Features. These requirements are necessary and if not portrayed on plans, the plans will be rejected. Place a checkmark in front of each of the items listed below to confirm that they are included in the permit submittal.  General Application & Submittal Checklist  Site Plan - Required with all submittals. The site plan must include ALL of the information detailed in the examples linked below.  Provide one of the following: • New Residential Home: site plan example • Residential Addition: site plan example  Planning Tables are required. See Sheets 1 and 2 on the example site plans linked above.  For Residential Remodels with no footprint increase: a vicinity map is required.  Include a Tree Removal Plan as needed. A separate Tree Removal permit may be required.  Landscape Drawings - required for new residential homes in the Education Hill, North Redmond, and Rose Hill Neighborhoods. See specific requirements in the Building Permit Guide.  Copy of recorded final plat document - new SFR only  Washington State Energy Code Forms WSU Energy Program > Building Efficiency > Energy Code • Prescriptive Worksheet - if applicable 2 pdf_text
full-text (cont. 2) Residential homeowner means an individual person or persons owning or leasing real property: (a) u one single-family residence is to be built and in which the owner or lessee intends to reside upon completion of construction; or (b) upon which there is a single-family residence to which improvements are to made and in wh owner or lessee intends to reside upon completion of any construction. (1) Any contractor agreeing to perform any contracting project: (a) for the repair, alteration, or construction of fo residential units or accessory structures on such residential property when the bid or contract price totals one th dollars or more; or (b) for the repair, alteration, or construction of a commercial building when the bid or contra totals one thousand dollars or more but less than sixty thousand dollars, must provide the customer with the foll disclosure statement in substantially the following form using lower case and upper case twelve-point bold type appropriate, prior to starting work on the project. Notice to customer can be found at: http://app.leg.wa.gov/R default.aspx?city=18.27.114 Is a city, town, or county required to verify a contractor registration number? Before issuing a building permit, a city, county or town must verify the registration of the general or specialty co applying for the permit. How does a city, town, or county verify a contractor’s registration? A city, town, or county may verify contractor’s registration by checking the department’s co 7 pdf_text
full-text (cont. 2) Residential Application Packet redmond.gov/Building City of Redmond Design Requiremen Link to current International, Washington State Amendment and City of Redmond building codes Plan review fees are non-refundable. Depending on your project, some or all of the following fees will be collected after the application is deemed complete for intake. • Building, Fire, Planning, and Civil Engineering Plan Review Fees • A Technology Surcharge based on the total permit cost will be assessed City of Redmond Business License: Contractors are required to obtain a City of Redmond business license prior to working in the City. Get a Redmond City business license here: WA State DOR For questions, contact the business license office at 425-556-2193 or businesslicense@redmond.gov Published: 07/2026 1 pdf_text
full-text (cont. 2) Residential Application redmond.gov/Buildin Site address: ______________________________________________ Suite/FLR/RM: _____________________________________________ Tax parcel number: _________________________________________ Project name/Tenant: ______________________________________ Plat name/Lot number: _____________________________________ Property owner: ___________________________________________ Mailing address: ___________________________________________ City ___________________ State: ____________ Zip: ____________ SITE LOCATION TYPE OF WORK  New SFR  Remodel  Addition  ADU  Swimming Pool  Accessory Structure  Manufactured Home  IRC Townhome # of units: _______ Lender Name: ___________________________________ Email: _____________________________ Phone: ______ Mailing address: _________________________________ City ____________________ State: ___________ Zip: __ LENDER INFORMATION N/A Contact Person: ____________________________________________ Company Name: ___________________________________________ Email: _____________________________________________________ Phone: ____________________________________________________ Mailing address: ___________________________________________ City ________________________ State: ___________ Zip: ________ APPLICANT CONTRACTOR DESIGNED BY: ARCHITECT ENGINEER Contact Person: _________________________________ Company Name: ______________________ 11 pdf_text
full-text (cont. 2) • Glazing Schedule - if applicable • Heating System Sizing Worksheet - if applicable  Structural Calculations - if required. Structural calculations are not required if the information is straight out of the IBC or IRC. Calculations must be stamped and signed by a Washington State Design Professional. SUBMITTAL CHECKLIST  Plans: See page 4 for a table with the specific requirements based on the project typ Include cover sheet, foundation plan, roof plan, code summary, framing pla structural sheets and elevation plan sh • Footing plan - Show location of new with section cuts and dimensions, sp anchor bolts, location, type of holdd fasteners to the foundation (per regi design professional, if required) and information showing change of grad • If applicable: deck framing plan - Sh deck footprint location at existing ho structural details and attachment to t materials used for deck framing. Pro framing details that include solid blo span, beam span, joist hanger identi knee brace requirements, post to po connections, ledger attachment, loc holddown tension devices (if require stair detail showing rise, run, handra guardrails and size and spacing for s stringers (if required). • If applicable: notate that fire sprinkle required on the cover sheet.  Geotechnical Engineering Report - if applicable. May be required due to dif soils, steep slopes or other lot require  King County Health Approval - if ap you are proposing work and have a se system or a well syst 2 pdf_text
full-text (cont. 2) Permit #: _________________________________________________ Signature: ________________________________________________ Date: _______________ • It is the purpose of chapter RCW 18.27.140 to afford protection to the public including a persons, firms, and corporations furnishing labor, materials, or equipment to a contracto unreliable, fraudulent, financially irresponsible, or incompetent contractors. • I understand that the state law requires construction to be done by a licensed contractor qualify for an exemption per RCW 18.27.090. • I, as an owner-builder, may be held liable and subject to serious financial risk for any inju sustained by an unlicensed person or his or her employees while working on my propert home owner’s insurance may not provide coverage for those injuries. I am willfully acting owner-builder and am aware of the limits of my insurance coverage. • I agree that as the party legally and financially responsible for the proposed construction will abide by all applicable laws and requirements that govern owner-builders as well as employers. • I agree not to delegate the responsibility for supervising work to a licensed contractor w licensed to perform the work being done. • I agree to comply with all applicable laws, ordinances, building codes and zoning regula • I agree to notify the City of Redmond immediately of any changes to the permit on recor Licensed contractors are regulated by laws designed to protect the public. • I am responsib 6 pdf_text
full-text (cont. 3) ntractor registration i website or by calling the department to confirm that the contractor is registered. (6) Any construction, alteration, improvement, or repair of personal property performed by the registered or l or by a mobile/manufactured home retail dealer or manufacturer licensed under CH 46.70 RCW who shall service and repairs. (12) Any person working on his or her own property, whether occupied by him or her or not, and any person w or her personal residence, whether owned by him or her or not but this exemption shall not apply to any p performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, o property. (13) An owner who performs maintenance, repair, and alteration work in or upon his or her own properties, or or her own employees to do such work. (14) A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an ele certified under the law of the state of WA, or a plumber certified under the laws of the state of WA or licens political subdivision. The exemption provided in this subsection is applicable only when the person certifie operating within the scope of his or her certification. 7 pdf_text
full-text (cont. 3) ___________ Email: __________________________________________ Phone: __________________________________________ Mailing address: _________________________________ City __________________________ State: ___________ DETAILED DESCRIPTION OF WORK 11 pdf_text
full-text (cont. 3) em contact the Ki Health department: 206-477-8050. Kin Health approval is required at time of permit submittal, no exceptions.  Flood Elevation Certificate: If the pro lies within the 100 year floodplain. IMPORTANT NOTICE The following information must be su with the first lot in a plat. • Notice of Decision with the Condi Approval of the Plat • Recorded Final Plat - If the final pl recorded, provide an approved preliminary plan. • Completed Affordable Housing a Impact fee Credits Table. (See pa for checklist.) Published: 07/2026 2 pdf_text
full-text (cont. 3) le for verifying whether the contractor is properly licensed with the State o Washington and has a City of Redmond business license. • I agree to schedule the applicable inspections for my project so that the required inspec be performed. I also understand I am responsible for resolving any failure to meet code requirements that may be found through inspections. 6 pdf_text
full-text (cont. 4) Full list of exemptions: RCW 18.27.090 RCW 18.27.114 - Disclosure statement required - prerequisite to lien claim. WAC 296-200A-110 & WAC 296-200A-111 RCW 18.27.090 - Registration of Contractor Exemptions Published: 07/2026 7 pdf_text
full-text (cont. 4) GREEN CERTIFICATION LEVEL Built Green:  4 star  5 star LEED for Homes:  Silver  Gold  Contractors are required to obtain a City of Redmo License prior to working in the City. Get one here: Published: 07/2026 11 pdf_text
full-text (cont. 4) Acting as your own contractor redmond.gov/Building Published: 07/2026 6 pdf_text