← back to Demo: Cross-Discipline Clash Set Download CSV

Conflict Detection Audit Report

Demo: Cross-Discipline Clash Set · Jurisdiction: Chicago, IL · Generated 2026-07-22 10:04 UTC
8
Total flags
3
High severity
5
Medium severity
0
Low severity
4
Sheets covered
TypeSeveritySheet / ClauseFindingCitedModelRevisionTimestamp
cross-discipline high structural S-101 / 1.1 The structural beam B-4 in Corridor 104 provides a minimum clear height of 9 feet 0 inches, but the ductwork DS-2 in the same corridor requires a minimum clearance of 9 feet 6 inches, which is physically incompatible.
mechanical 1.1
llama-3.3-70b-versatile Rev A 2026-07-22 04:49
cross-discipline high mechanical M-101 / 1.1 The mechanical clause requires a minimum clearance of 9 feet 6 inches, while the structural clause provides a minimum clear height of 9 feet 0 inches within the same corridor, Corridor 104, creating a physically incompatible condition.
structural 1.1
llama-3.3-70b-versatile Rev A 2026-07-22 04:49
cross-discipline high architectural A-102 / 1.1 The 36 inch swing radius of Door D-12 centered 6 inches off the north wall in Electrical Room 118 is physically incompatible with the required 36 inch clear working space in front of Panel EP-3, also mounted on the north wall in the same room.
electrical 1.1
llama-3.3-70b-versatile Rev A 2026-07-22 04:49
vs. code medium electrical E-101 / 1.1 [SIMULATED - keyword heuristic, not real reasoning] This clause and the closest matching code section (3) both state numeric requirements, but the numbers don't match: this clause says 118, 3, 36, the code section says 1829. Worth a closer look to confirm whether this is a real conflict.
(simulated - keyword heuristic, not model reasoning)
3
mock-keyword-heuristic Rev A 2026-07-22 04:49
vs. code medium electrical E-101 / 1.2 [SIMULATED - keyword heuristic, not real reasoning] This clause and the closest matching code section (3) both state numeric requirements, but the numbers don't match: this clause says 121, 36, 6, the code section says 1829. Worth a closer look to confirm whether this is a real conflict.
(simulated - keyword heuristic, not model reasoning)
3
mock-keyword-heuristic Rev A 2026-07-22 04:49
vs. code medium architectural A-102 / 1.1 [SIMULATED - keyword heuristic, not real reasoning] This clause and the closest matching code section (10) both state numeric requirements, but the numbers don't match: this clause says 118, 12, 36, 6, the code section says 000, 1006.2, 2.7, 3. Worth a closer look to confirm whether this is a real conflict.
(simulated - keyword heuristic, not model reasoning)
10
mock-keyword-heuristic Rev A 2026-07-22 04:49
cross-discipline medium electrical E-101 / 1.1 The required 36 inch clear working space per NEC in front of Panel EP-3 in Electrical Room 118 interferes with the 36 inch swing radius of Door D-12, which swings into the same room and is centered 6 inches off the north wall where the panel is mounted.
architectural 1.1
llama-3.3-70b-versatile Rev A 2026-07-22 04:49
cross-discipline medium architectural A-102 / 1.2 Door D-15 swings outward into the corridor, which may conflict with the required 36 inch clear working space for Panel EP-6 in Electrical Room 121.
electrical 1.2
llama-3.3-70b-versatile Rev A 2026-07-22 04:49